Loading...
HomeMy WebLinkAboutSewer System ReportSewer System Report for Castle Rock Subdivision Phase 6 College Station, Texas March, 2010 Prepared By: SCHULTZ ENGINEERING, LLC. TBPE Firm Registration No. 12327 2730 Longmire, Suite A College Station, Texas 77845 979.764.3900 o r C O e *•a ' y * ref JOSEPH P. SCHULTZ 4 65889 wad General Information Location: General Note: Land Use: Design Criteria Primary Sewer Outfall: An existing 21" sewer line through this subdivision which was constructed for the Castlegate Subdivision. Domestic Demand: Avg. Pop Density: Average Flow: Peaking Factor: Pipe: Applicable Exhibits: Conclusion The Castle Rock Subdivision, Phase 6, Lots 35 -36, Block 1, and Lots 1- 31, Block 2 is located adjacent to the existing Phases 4 and 5. These 33 residential Tots will flow into the proposed 8" and 6" sewer lines which are to be constructed with Phase 5. These sewer lines will connect to an existing manhole on the 21" sewer line. Single Family Residential 2.67 persons per unit 100 gpd/cap Residential 4 PVC D3034 SDR 26 Exhibit A — Sanitary Sewer System Layout Exhibit B — Sanitary Sewer Analysis Spreadsheet The proposed 8" and 6" lines flow into an existing 21" line previously constructed that was designed for the flow from this development. The analysis in Exhibit B checks the calculated slope required to pass the estimated flow against the design slope shown on the plans. The spreadsheet indicates the design slope is greater than the minimum computed slope, so we conclude that the system is more than capable of carrying the anticipated flows from this phase and future phases of the subdivision. Exhibit B also shows the full flow velocity in the proposed lines to range from 2.15 his to 3.13 fps and the calculated peak flow velocity to range from 0.71fpsto2.10fps. -- N W so A p ::: P J GC x Z G 3 r. m W W A A U a J G 5 129 1 34,443 I ''....... t 0 801 1 33,642 34,443 t 8 1 0 1 2,136 31,506 '', 33,642 1 6 0 1 1,602 1 29,904 31,506 I 2 0 534 - 1 534 1 6 0 1,602 27,768 29,370 l 10 0 7 2,670 - , 2,670 6 7 0 1,602 1 23,496 1 25,098 i 1 6 0 I 1,602 - 1,602 5 0 1,335 j 20,559 i 21,894 I 1 4 - -a � 0 1,068 19,491 - 73 - I 0 19,491 ' $ • , z I Average Daily Infiltration Peaking Peak 3 c o o Flows (ADF) (10% ADF) , Factor Flows •C u ' R j o a GPD CFS CFS CFS 0.0533 00 521 0.0487 0.0008 0.0454 0.0041 0.0388 1 0.0025 0.0339 0.0318 1 0.0053 4.00 0.2185 0.0052 4.00 ! 0.2134 i 0.0049 4.00 0.1999 0.0001 4.00 '.... 0.0034 0.0045 4.00 j 0.1863 4.00', 0.0169 Z651'0 ': 001 60000 , 0.0002', 4.00 0.0102 0.0034 4.00 0.1389 0.0032 4.00 '. 0.1304 0.0030 4.00 ; 0.1236 CO 00 00 1 6 I D3034 5.793 j 0.00004 8 , D3034 1 7.754 0.0279 C 6 - D3034 ; 5.793 0.0011 1 D3034 1 7.754 0.0204 P m nn Friction Design Actual Pipe Size Material Inside ! 1 Slope ' Slope Slope (if ! Slope Diameter Peak Peak known) Check' , Flows Flows D3034 '. 7.754 0.0384 D3034 7.754 0.0366 D3034 7.754 ' 0.0321 D3034 1 5.793 1 D3034 1 7.754 1 0.0155 1 D3034 1 7.754 1 0.0137 D3034 7.754 0.0123 0.40 0.40 1 0.40 0.80 0.40 0.40 ! 0.40 '.. OK 0.328 0.705 0.80 I 0.80 OK ! 0.183 -, 0.458 0.40 0.40 ! OK 1 0.328 ! 0 705 0.40 0.85 j OK 0.328 j 1.026 0.40 1 0.85 OK ' 0.328 1.028 /e 1 0.40 1 OK 1 0.328 0 70 5 15 0.21851, 1.841 0.40 OK 0.328 0 705 � 2.15 ; 0.2134 j 1.79', 0.40 1 OK 0.328 ! 0 705 I 100 OK 0 183 0 512 0.40 I OK 0.328 0 705 0.80 OK I 0.183 j 0 458 CI) o u, { 2 50 ■ I 215 I 2 50 1 215 313 313 F- •, 0''9991 1.771 0.0034i 0.71! 0.1863:; 1.75j 0.01691 1.03' ■ 0.1592: 1.70 0 p o n� 0 .. w m N 0 w � N 0 a rn N N O 3 6 5 5 • • p w c) > m ti ti