Loading...
HomeMy WebLinkAboutLetter Acknowledging City StandardsSCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Voice /Fax 979.764.3900 March 31, 2010 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards — Castle Rock Subdivision Phase 6 Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above - referenced project, to the best of my knowledge, do not deviate from the B /CS Design Guideline Manual except that Waterline W -2, shown on Sheet 6 has a bury depth greater than 5' in order for the waterline to get under storm sewer pipe P612 and Waterline W -6, Shown on Sheet 12, has a bury depth greater than 5' in order for the waterline to go under storm sewer pipe P603. Waterline W -6 also has a bury depth less than 4' in order for the waterline to go over the box culvert structure. No other alternate design or construction methodology was used. I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B /CS Standard Details. SiQcerely, Jo ph P. Schultz, P.E. Civil Engineer PAA- ., * 1 0 e eeseeeeeew •.. JOSEPH P , 658: ' w r® ®® 2 , 3 2,7