HomeMy WebLinkAboutDrainage Certification LetterApril 15, 2010
Erika Bridges, E.I.T.
Graduate Civil Engineer
Public Works Department
City of College Station
P. O. Box 9960
College Station, Texas 77842
RE: DRAINAGE CERTIFICATION LETTER
ENTERGY SITE PLAN, COLLEGE STATION, TEXAS
Dear Ms. Bridges,
The purpose of this letter is to certify that, in accordance to the B /CS Design Guideline
Manual, the proposed project will not cause any increase in flooding conditions to areas
downstream of the project location. By this letter, I am also certifying the following:
Sincerely,
"I have conducted a topographic review and field investigation of the
existing and proposed flow patterns for stormwater runoff from the Entergy
Site to the main stem of Carter's Creek. At build -out conditions allowable
by zoning, restrictive covenant, or plat note, the stormwater flows from the
subject site project will not cause any increase in flooding conditions to the
interior of existing building structures, including basement areas, for storms
of magnitude up through the 100 -year event"
Mark Savarino, P.E.
Design Engineer
Bleyl & Associates
Project Engineering & Management
—.�E of r.
Pfs .,..... 1
MARK A. SAVARINO
j , �. 105149 ies
1 44.:4 CENSS % %41..
%„ 6YONAI -w ?
%%v....
171c
Bryan Austin
(979)- 268 -1125 (512)- 328 -7878
(979)- 260 -3849 (512)- 328 -7884 Fax
1722 Broadmoor
Suite 210
Bryan, TX 77802
Conroe
(936)- 441 -7833
(936)- 760 -3833 Fax