HomeMy WebLinkAboutFuture Detention Requirments (letter)March 29, 2010
Erika Bridges
Planning & Development Services
City of College Station
P.O. Box 9960
College Station, Texas 77842
Sincerel
Commerce National Bank Fitch Branch
Future Detention Requirement
McCLURE & BROWNE, ENGINEERING/
1008 Woodcreek Dr., Suite 103 College Station, Tx. 77845 • (979) 693 -3838
1314 10th Street, Suite 210 • Huntsville, Tx. 77320 • (936) 294 -9749
Re: Future Detention Requirement
Commerce National Bank Fitch Branch
COCS Case File No. 10- 00500022 & 10- 00500023
MBESI No. 10000151
Dear Ms. Bridges:
The purpose of this letter is to acknowledge that the development of the above referenced project will be
considered as part of the larger development (i.e. 44.16 acre tract) with regard to drainage. We have advised
Pebble Creek Development Co. that any future improvements will push the overall developed area above 1
acre; thus requiring a regional detention facility to mitigate the increase in runoff due to this and future
development.
The preliminary location of the regional detention pond is the southeast corner of the remainder tract near the
intersection of Lakeway Drive and Venture Drive. The ultimate /final design of the pond shall account for full
development of the original 44.16 acre tract. However, the pond shall be constructed in phases to account for
the improvements as they are proposed. The detention facility shall be designed and constructed in compliance
with the current Unified Stormwater Design Guidelines for Bryan/College Station during each phase.
J. Dale Browne Jr. P.E. C J DALE BROWNE, JR.
> Vi . ... 81890 .......
' 9 l . isT.E .
cc: Davis Young, Pebble Creek Development C��k
SURVEYING, INC.
Engineer Reg. No. F -458
Survey Reg. No. 101033 -00
Page 1 of 1