Loading...
HomeMy WebLinkAboutConstruction Docs LetterHanle Engineering Company P.O. Box 11995 College Station, Texas 77842 979.764.3900 office 979.764.3910 979.436.1559 mobile March 12, 2010 Erika Bridges, EIT Graduate Civil Engineer Department of Public Works 1101 Texas Avenue College Station, TX 77840 Re: Castle Rock Phase 5— Construction Drawings Dear Ms. Bridges: Attached are 1 copy of the revised construction drawings, my response to the staff comments, 2 copies of the Drainage Report Addendum, 2 copies of the revised water exhibit, 1 copy of the revised final plat and a revised Engineer's Estimate of the construction cost for the above referenced project. Please let me know if you want me to have the revised drainage report pages inserted into your copies of the drainage report. If you have any questions, please do not hesitate to call. Very truly yours, Harle Engineering Company Joe Schu f ', P.E. Civil Eng' , eer Schultz Engineering, LLC, P.O. Box 11995 College Station, Texas 77842 979.764.3900 office 979.764.3910 March 26, 2010 Erika Bridges Graduate Civil Engineer City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Castle Rock Phase 5 — Construction Drawings Dear Ms. Bridges: Attached are 6 copies of the construction drawings for the above referenced project. On Sheet 8 where the waterline goes below the storm sewer line, there are no deflections of the pipe in this area. All of the horizontal or vertical deflection occurs only in the bends, not in the pipe sections. Therefore, there are no radii used since there are no curves in the pipe. If you have any questions, please do not hesitate to call. Very truly yours, Schultz Engineering, LLC