Loading...
HomeMy WebLinkAboutLetter acknowledging City standardsHARLE ENGINEERING COMPANY 3002 Texas Avenue South College Station, Texas 77845 Voice /Fax 979.693.7191 February 9, 2010 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards — Castle Rock Subdivision Phase 5 Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above - referenced project, to the best of my knowledge, do not deviate from the B /CS Design Guideline Manual except that Waterline W -1, shown on Sheet 7 and Waterline W -4, Shown on Sheet 8, has a bury depth greater than 5' in order for the waterline to go under the storm sewer line. No other alternate design or construction methodology was used. I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B /CS Standard Details. Sincerely, sep P. Schultz, P.E. Civil Engineer