HomeMy WebLinkAboutLetter acknowledging City standardsHARLE ENGINEERING COMPANY
3002 Texas Avenue South
College Station, Texas 77845
Voice /Fax 979.693.7191
February 9, 2010
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging City Standards — Castle Rock Subdivision Phase 5
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the water,
sanitary sewer, streets and drainage for the above - referenced project, to the best of my
knowledge, do not deviate from the B /CS Design Guideline Manual except that
Waterline W -1, shown on Sheet 7 and Waterline W -4, Shown on Sheet 8, has a bury
depth greater than 5' in order for the waterline to go under the storm sewer line. No other
alternate design or construction methodology was used.
I also acknowledge that, to the best of my knowledge, the details provided in the
construction plans are in accordance with the B /CS Standard Details.
Sincerely,
sep P. Schultz, P.E.
Civil Engineer