Loading...
HomeMy WebLinkAboutSewer ReportSewer System Report for Castle Rock Subdivision Phase 5 College Station, Texas February, 2010 Prepared By: HARLE ENGINEERING COMPANY TBPE Firm Registration No. 4538 3002 Texas Avenue South College Station, Texas 77845 979.693.7191 General Information Location: The Castle Rock Subdivision, Phase 5, Lots 26 -34, Block 1, Lots 16- 133, Block 3 and Lots 17 -18, Block 4 is located adjacent to the existing Phases 2A and 4 and future phases 6 and 7. General Note: These 29 residential lots will flow into the proposed 8" and 6" sewer lines which will be constructed with this development. These sewer lines will connect to an existing manhole on the 21" sewer line. Land Use: Single Family Residential Design Criteria Primary Sewer Outfall: An existing 21" sewer line through this subdivision which was constructed for the Castlegate Subdivision. Domestic Demand: Avg. Pop Density: 2.67 persons per unit Average Flow: 100 gpd /cap Residential Peaking Factor: 4 Pipe: PVC D3034 SDR 26 Applicable Exhibits: Exhibit A — Sanitary Sewer System Layout Exhibit B — Sanitary Sewer Analysis Spreadsheet Conclusion The proposed 8" and 6" lines flow into an existing 21" line previously constructed that was designed for the flow from this development. The analysis in Exhibit B checks the calculated slope required to pass the estimated flow against the design slope shown on the plans. The spreadsheet indicates the design slope is greater than the minimum computed slope, so we conclude that the system is more than capable of carrying the anticipated flows from this phase and future phases of the subdivision. Exhibit B also shows the full flow velocity in the proposed lines to range from 2.15 fps to 3.13 fps and the calculated peak flow velocity to range from 0.71 fps to 2.10 fps. W Q 1 e • zi o z w z � z 1 2 1 W sg Ara. N a 0 0 • • • Pipe Calculations Pipe Flows i90Z 01'1 109 L IOL'L ! £0'1. �SL'L 11' ILL •1 :61 69 L 9£Z 1' SS€ 1'0 [68£1D 0.01021 0.15921 16910'0 I £991'0 1 4£00'0 :6661'0 I4£LZ'0 9911'0 Y. 1€ I '£ £ 1'E [ 91' € OS'Z 91.Z 091 91'€ 08'Z 191 Is 1'z I s1z eLZO 9110•1 0.7051 €994'0 LSOL'0 €899 0 1901'0 €119'0 1 19010 0.7051 1 190L'0 611£'0 611£'0 [611£D 1E91'0 6LZE'0 £9 10 611£ 0 £61'0 611£'0 0.3279 1 1 611£'0 8. Lft I 310 I No I xo I No 310 1 NO IINo I NO xo 310 1 310 SMOId (uM0u11 3l) idols idols lanlay ! u91saO mNl 58'0 04'0 68'0 I 09'0 040 09'0 08'0 08 09'0 09'0 I 40160 08'0 080 1100'0 0.0279 I 0.40 1 00'1 08'0 1 40000'0 040 09'0 1Z(O0 09 04'0 04'0 0Y0 EZIO'o 8410'0 sslo'o 4000'0 98E0 0 u 5 g sayaul 6S1'L 6SCL O E6L'S 9SL L (6L'S 96 1.1. £6L'S 6SCL 4tOEO 4SLY I 4EOEO 4SL ! 6E0EO 4f0(0 I 4E0EO D3034 4£0£0 D3034 1 6£OEO 9E0EO ji (ul) 0 00 .0 00 .0 00 •0 00 00 CO Flow Calculations SD 9EZ1 MVO 1 68E1'0 f 20160 Z6S 1'0 1 69100 1 £991'0 r 4f00 0 1 6661 0 4 1 SHIZ0 00 '4 L 00 1 00 "4 1.__o b _! I --- 00 4 004 00'4 I off 4 00'9 00' oo> Sap I I 1 0£00'0 EE E pp'p 9E00 0 Z000'0 6£00'0 4000'0 5 400'0 1 000' 0 6900'0 ZSOO'0 ES0O0 (dOv) sMold Al!mO a8e.any SD 0.0302 0.0330 6Ef0'0 5100'0 1900 0 89£0'0 4 540 0 8000'0 1840'0 I 0.0533 OdO 169`61 09f`IZ 468`1 1 109'1 OL9`Z 860`SZ OL£`6Z 4ES 906`1£ Z49`EE £44` sapoN wrausu(1 WOIJ MOIL 8wlnquiuoD 169`61 09E`IZ 969`£1 89L`LZ 406`61 1 9061 I Z49`EE 108 E44`4E apoN 01 apoN Wad Mold OdO 169`61 698`1 9ES Z09`I 019€ '...I 109`1 109'1 1>ES €09`1 (sasegd 8uyspca) slot ptpuopcsoN i i ai3y )OVOdO »d OdD L9€ 0 ! EL 0 .o 0 0 0 0 .V 0 .0 0 CO 0 N. 1 6Z 110'1lePuoP!say .o o .o au1 0 1... N HNI n v v. .n a e .I r. r- 8unspxd E S U. N HW 00 n •o n? a a .+ CI VI 02 •et cn ral 'C es U