HomeMy WebLinkAboutLetter Acknowledging City standardsApril 19, 2010
Ms. Carol Cotter
City of College Station
Post Office Box 9960
College Station, TX 77842
Re.:
LETTER ACKNOWLEDGING CITY STANDARDS
Pebble Creek, Phase 91
MBESI No. 1065 -0013
Dear Ms. Cotter:
McCLURE & BROWNE, ENGINEERING /SURVEYING, INC.
1008 Woodcreek Dr., Suite 103 College Station, Tx. 77845 • (979) 693 -3838 Engineer Reg. No. F -458
1314 10th Street, Suite 210 • Huntsville, Tx. 77320 (936) 294 -9749 Survey Reg. No. 101033-00
The purpose of this letter is to acknowledge that the construction plans for the water, sanitary
sewer, streets and drainage for the above - referenced project, to the best of my knowledge, do
not deviate from the B /CS Design Guideline Manual. Any alternate design or construction
methodology that was used is listed below:
I also acknowledge, to the best of my knowledge, that the details provided in the construction
plans are in accordance with the Bryan /College Station Standard Details.
Sincerely,
L
L. Rc bertson
P ject Engineer
F: \1065 - Davis Young \0012 - Pebble Creek - Phase 9H\ Correspondence\ Letter Acknowledging City Standards.wpd