Loading...
HomeMy WebLinkAboutLetter Acknowledging City standardsApril 19, 2010 Ms. Carol Cotter City of College Station Post Office Box 9960 College Station, TX 77842 Re.: LETTER ACKNOWLEDGING CITY STANDARDS Pebble Creek, Phase 91 MBESI No. 1065 -0013 Dear Ms. Cotter: McCLURE & BROWNE, ENGINEERING /SURVEYING, INC. 1008 Woodcreek Dr., Suite 103 College Station, Tx. 77845 • (979) 693 -3838 Engineer Reg. No. F -458 1314 10th Street, Suite 210 • Huntsville, Tx. 77320 (936) 294 -9749 Survey Reg. No. 101033-00 The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above - referenced project, to the best of my knowledge, do not deviate from the B /CS Design Guideline Manual. Any alternate design or construction methodology that was used is listed below: I also acknowledge, to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan /College Station Standard Details. Sincerely, L L. Rc bertson P ject Engineer F: \1065 - Davis Young \0012 - Pebble Creek - Phase 9H\ Correspondence\ Letter Acknowledging City Standards.wpd