Loading...
HomeMy WebLinkAboutLetter of CompletionCITY OF COLLEGE STATION ENGINEERING DIVISION COLLEGE STATION, TEXAS RE: PEBBLE CREEK PH 9I To Whom It May Concern: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above reference project. The one -year warranty is hereby affirmed and agreed to by Civil Constructors, Inc. and by their sub - contractors as indicated by signatures below. OWNER: PEBBLE CREEK DEVELOPMENT, CO (979) 690-0992 4500 PEBBLE CREEK PARKWAY COLLEGE STATION, TEXAS 77845 SIGNATURE: WORK COMPLETED Streets Water Utilities Sanitary Sewer Utilities Drainage Facilities Sidewalks ACCEPTANCE & APPROVAL �`�'� rim ITS Earls FILED " Al TEMP BLANKET £$MT FILED LETTER OF COMPLETION DATE: JULY 29, 2011 WARRANTY DATE October 10, 2011 October 10, 2011 October 10, 2011 October 10, 2011 October 10, 2011 CONTRACTOR: CIVIL CONSTRUCTORS, INC. (979) 690 -7711 1707 GRAHAM ROAD COLLEGE STATION, TX 77845 SIGNATURE: O.E. Smith- President ITY PRESS IVE 1 Clearing and Grubbing ACRE 2.4 2000.00 4,820 2 Excavation (Roadway and Lots) C.Y. 8,644 8.00 69,152 3 6" Lime Stabilized Subgrade (6% by weight) S.Y. 9,301 4.00 37,204 4 5 6 6" Crushed Limestone Base S.Y. S.Y. 4,892 10.00 48,920 8" Crushed Limestone Base 2,205 11.50 25,358 2" HMAC, Type "D ", Surface Course (including prime coat) S.Y. 7,097 10.00 70,970 7 Concrete Curb and Gutter (all types) L.F. 3,691 10.75 39,678 8 6" Reinforced Concrete Pavement S.Y. 269 40.00 4.00 10,760 47,684_ 9 4" Reinforced Concrete ,Sides =a1k- S.F. 11,921 10 Non - Reinf. Concrete Slope Proteciton S.Y. 47 36.00 1,692 11 Colored idew Ramps EACH 4 500.00 2,000 6,050 12 Handrail $i Pa.JC71.. L.F. 55 110.00 13 End/Road Markers EACH 3 250.00 750 Paving Subtotal $365,038 Drainage System Construction 14 24" RCP Pipe, (ASTM C76 Cl III) Str. Backfill L.F. 175 69.00 12,075 25,220 15 24" HDPE Pipe, (ADS, N -12 or approved equal w /water- tight joints) Str. Backfill L.F. 388 65.00 16 30" RCP Pipe, (ASTM C76 Cl III) Str. Backfill L.F. 35 75.00 65.00 2,625 32,175 4,500 17 30" HDPE Pipe, (ADS, N -12 or approved equal w /water- tight joints) Str. Backfill L.F. 495 18 19 30" RCP 4:1 Sloped Headwall EACH 3 1,500.00 Standard 10' Recessed Inlet EACH 7 2,750.00 19,250 4,400 20 Standard 5' Recessed Inlet EACH 2 2,200.00 21 22 Standard Junction Box EACH 2 2,200.00 4,400 Rock Rip -Rap Channel Lining S.Y. 60 60.00 3,600 Drainage System Subtotal $108,245 Water System Construction 22 8" PVC, C909 C1 200, Water Line, Str. Backfill L.F. 580 25.00 14,500 3,380 22,249 3,281 1,500 5,300 23 6" PVC, C909 C1 200, Water Line, Str. Backfill L.F. 169 20.00 24 6" PVC, C909 C1 200 Water Line, Non -Str. Backfill L.F. 1,171 19.00 25 4" PVC, C909 C1 200 Water Line, Str. Backfill L.F. 193 17.00 26 27 4" PVC, C909 C1 200 Water Line, Non -Str. Backfill L.F. 100 15.00 Fire Hydrant Assembly EACH 2 2,650.00 28 29 8 "x6" M.J. Tee EACH 1 450.00 450 6 "x6" M.J. Tee EACH 1 400.00 400 30 8" M.J. Gate Valve EACH 1 950.00 950 3,750 31 6" M.J. Gate Valve EACH 5 750.00 32 6 "x4" M.J. Reducer EACH 1 300.00 300 32 8 "x13" M.J. Anchor Coupling EACH 1 4 300.00 300.00 300 33 6 "x13" M.J. Anchor Coupling EACH EACH 1,200 1,750 33 34 35 8 "x45 deg. Bend 5 350.00 6 "x45 deg. Bend EACH 4 300.00 1,200 6 "x22.5 deg. Bend EACH 0 300.00] 2 300.00 0 6 0 36 6 "x11.25 deg. Bend EACH 37 4 "x45 deg. Bend EACH 0 275.00 Item # PEBBLE CREEK - PHASE 9I MBESI PROJ #: 1065 -0013 Engineer's Estimate of Construction Costs June 14, 2010 Description Unit Paving Construction 1 of 2 Quantity 1 1 Unit Price Total Item # Description Unit Quantity Unit Price Total 38 4 "x22.5 deg. Bend EACH 0 275.00 0 39 4 "x11.25 deg. Bend EACH 0 275.00 0 37 2" Blow Off Valve Assembly EACH 2 850.00 1,700 38 39 Water Service, 1.5" type K Copper, short side (< 20') EACH EACH 7 960.00 6,720 Water Service, 1" type K Copper, short side (< 20') 3 620.00 1,860 40 41 Water Service, 1.5" type K Copper, long side (> 20') EACH EACH 4 3 Water System 1,400.00 1,275.00 5,600 3,825 Water Service, 1" type K Copper, long side (> 20') Subtotal $80,815 Sewer System Construction 41 8" PVC, D -3034 SDR 26 L.F. 99 12.00 1,188 42 43 6" PVC, D -3034 SDR 26 L.F. 900 9.00 8,100 6" PVC, D -2241 SDR 26 L.F. L.F. 20 88 10.00 200 2,376 44 Str. Backfill (5' -8' Depth) 27.00 45 46 47 Str. Backfill (8' -10' Depth) L.F. 55 35.00 1,925 Non -Str. Backfill (5' -8' Depth) L.F. 803 14.00 11,242 Non -Str. Backfill (8' -10' Depth) L.F. 73 16.00 6 2,000.00 1,168 12,000 48 49 50 Standard Manhole, 0 -6 ft. deep EACH Extra Depth for Manhole V.F. 11 300.00 3,300 12" Casing L.F. 20 60.00 1,200 50 Short Side 4" Sewer Service (< 20') EACH 10 450.00 1,350.00 4,500 10,800 51 Long Side 4" Sewer Service ( >20') EACH 8 52 Trench Safety (sewer) L.F. 1,019 1.00 1,019 Sewer System Subtotal $59,018 Erosion Control Construction 53 Erosion Control Plan & Sedimentation Control (per Item 106) (includes silt fencing, construction exits, straw bale barriers, inlet protection, grass seeding, and any other sedimentation control devices) S.Y. 1 16,000.00 16,000 Erosion Control Subtotal $16,000 PEBBLE CREEK - PHASE 9I MBESI PROJ #: 1065 -0013 Engineer's Estimate of Construction Costs June 14, 2010 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. _�P,`s OF TFX�t <SI Jeffery L. Robertson, PE Date i * .• � * * � �� JEFFERY L. ROBERTSON i -O 94745 rcr ; % 1� %. <i o :: I CENSE..•' �-, 2 of 2 Total Construction Cost $629,116 Clean curb, gutter, and sidewalk and repair broken /chipped curb. Raise manholes to 6" above grade. Clean silt and debris from storm drain system. Raise all t -posts to 3' above grade. Restore creek to original flow line. Raise hydrants to bury line. Pour valve pads. Test tracer wire. Install blow -off boxes. Install end of road signs. Punch List Pebble Creek Phase 91 Punch list is subject to change if and when other issues arise that require correction. Install street signs. Place sod at the end of Birkdale. Hydro seed all of the right of way, and establish vegetation in all disturbed areas. Install handrail. Verify all grading has been done according to the plans. Install all erosion control measures. Including rip rap. Verify all conductor is installed and energized. Verify all street lights function. Request fire flow test. Submit stamped /signed red line drawings to inspector. Punch list is subject to change if and when other issues arise that require correction.