HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION
Mr. Alan Gibbs, P.E.
City of College Station
1101 Texas Avenue
College Station, Texas 77840
HEB College Station No. 2 Store Project
Lots 12, 13A, and 13C, Block 3, Phase 3 Tower Point Subdivision
College Station Texas 77845
Dear Mr. Gibbs:
The purpose of this letter is to request that the following listed improvements be approved and accepted as
being constructed under City inspection and completed according to plans and specifications as approved and
required by the City of College Station, Texas. This approval and acceptable by the City is requested in order
that we may finalize any subcontracts and to affirm their warrant on the work. This approval and acceptance
by the City of the improvements listed below does hereby void the letter of guarantee for the listed
improvements on the above referenced project.
The one -year warranty is hereby affirmed and agreed to by SpawGlass Construction and by their
subcontractors as indicated by signatures below.
WORK COMPLETED \ l , . tt
SA4-4 WAIL $ iR C°1 1
f I 2, L 11.,i e 413
Owner: HEB Grocery Company, LP
Phone Number: (210) 938 -8000
Address: 646 South Main
San Antonio, TX 78204
Signature:
TANCE : APPROVAL
J:1 871 \021Letter of Completion draftdoc.mes.mm
September 21, 2010
Project No.: 50871 -02
WARRANTY DATE
e)r.i 'YEA -. rt2,n4-1
SuP? STrM4rtP. L Cc) 0-tPt T14�1
Contractor: SpawGlass Construction
Phone Number: (281) 970 -5300
Address: 13800 West Road
Houston, Texas 77041
Signature:„,
PLAT FILED
OFFSITE ESMTS FILED
TEMP BLANKET ow FILED
VIM \ NO OTHER FSMTS NEEDED
f Conege Station Utilities
Reliable, Affordable, Community Owned
Date Tuesday Sept. 22, 2009
Time 1:15 p.m.
Test
completed by Justin Tamplin
Witness Aaron Matthews
Location William D. Fitch Pkwv
Nozzle size 2.5
Flow hydrant R -030
Pitot reading 90
G.P.M. 1590
Static hydrant R -029
Static PSI 100
Residual PSI 100
Comments
Date
Time
Test
completed by Justin Tamplin
Witness
Location
Nozzle size
Flow hydrant R -036
Pitot reading 65
G.P.M.
Static hydrant R -014
Static PSI
Residual PSI 88
Comments
al fCoiiege Station Utilities
Reliable, Affordable, Community Owned
Tuesday Sept. 22, 2009
1:00 p.m.
Aaron Matthews
William D Fitch
2.5
1350
88