Loading...
HomeMy WebLinkAboutSTAFF REVIEW COMMENTS CITY OF COLLEGE STATION C___■ DEVELOPMENT SERVICES 1 101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 3, 2003 TO: James H. Woods & Jeffrey McDowell, Via fax 846.9133 ✓ FROM: Bridgette George, Assistant Development Manager SUBJECT: SOUTHWEST BUSINESS CENTER (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764.3570. Attachments: Staff review comments cc: C. Barbu Architect, Via fax 775.5642✓ Case file #03- 00500261 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: SOUTHWEST BUSINESS CENTER (SP) — 03- 00500261 PLANNING • .-1. Please provide water course and topography information on a site layout. The bollards on the dumpster pad are required to be a minimuml2 -ft apart (currently showing 10 -ft.) Please adjust. Gates will be required to screen the dumpster from the R.O.W. The one fire hydrant that is being proposed will not be adequate coverage for this site. If there is an existing fire hydrant please show the location of it. ,4. Please provide all fire lane markings any required signage. � a 5. a t$ L1—Ys , pc t ar - , $1/2 :f ^),S LANDSCAPING /STREETSCAPING /BUFFER 4 5. Please note on the site plan that all disturbed earth must be 100% covered with established grass or groundcover krior to -6' Please identify canopy and non - canopy tree on the landscape symbols legend. ,Jf . Note on the landscape plan in the buffer legend that tree's must be a minimum of 2- inch caliper, as well as the shrubs must be 5- gallon shrubs at a minimum height of three feet at planting. Ci8. Please be aware that all screening shrubs must be three feet in height at planting. 0. To receive 40 points per non - canopy tree, the tree must be 1.25 caliper. Reviewed by: Jennifer Reeves Date: 10 -21 -03 ENGINEERING 1. There is an approved Site Plan for the adjacent Fedora property. You will need to work out the driveway grading conflicts with that owner or meet their proposed grade. 2. Please incorporate the information presented in the waterline drawings submitted for Lots 5 and 6 in this Site Plan. 3. An easement is required for the fire water line that was constructed with the project on Lots 5 and 6. 4. Engineered drawings for the water meters /manifold and fire hydrant are required. 5. Verify location of BTU easement along southeast property line. It appears that it should be 5 feet wider. 6. Show 15' PUE along southeast property line. 7. Provide paving detail. Pavement thickness of fire lanes and sanitation routes is 6 inches. 8. For the water demands provided, 1 -inch meters will be allowed for Buildings A and C. A 3 /4 -inch meter will be allowed for Building B. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2of3 9. A copy of the filed access easement for the 7.5 feet on Lot 6 will be required prior to CO. 10. Verify that there will not be any conflicts with the proposed utility services and the underground detention. Reviewed by: Carol Cotter Date: October 30, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. email to rbolin( cstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. 9. Developer installs 2 -4" PVC to bldg A for service. Developer installls 2 -4" PVC to bldg. B for service. Developer installs 3 -4" PVC to bldg. C for service. Developer installs 2 -4" PVC for primary run from existing transformer to proposed transformer to overhead power line. Reviewed by: Ronnie Bolin Date: 10 -23 -03 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 5, 2003 TO: James H. Woods & Jeffrey McDowell, Via fax 846.9133 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOUTHWEST BUSINESS CENTER II (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Reeves or Carol Cotter at 764.3570. Attachments: Staff review comments cc: C. Barbu Architect, Via fax 775.5642 V Case file #03- 00500261 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 2 Project: SOUTHWEST BUSINESS CENTER II (SP) - 03- 00500261 Please be aware that all outside lighting must be directed away from the single family residential. This has been an issue on Tots 5 &6. Lots 5 &6 of the S.W. Business Center has a deficiency in the required parking, therefore the rear building will not be permitted for C.O. (excluding the Justice of the Peace Office) until the parking is installed and accessible on Lots 7 &8.Outstanding lighting & parking issues could cause delay in receiving the Certificate of Occupancy. PLANNING 1. Please provide water courses and topography information on the site plan. 2. Please show fire lane markings on interior and end islands. 3. The dumpster enclosure is required to be 12 ft. in depth and 24 ft. in width. Please provide 24 feet on the width, currently there is 23.4 feet, this will not be sufficient. 4. All end islands are required to be 180 -sq. ft. in area. The proposed end island adjacent to the dumpster enclosure is not meeting this area requirement. Please adjust. LANDSCAPING /STREETSCAPE /BUFFER 5. Please add to the note "All disturbed earth must be covered with 100% established grass or ground cover prior to C.O." 6. If the intention is to use Bald Cypress as opposed to Live Oaks then please make the specie name change on the landscape plan. Reviewed by: Jennifer Reeves Date: 11 -17 -03 ENGINEERING 1. Submit TxDOT permit application for driveway. 2. Was the location of the BTU easement verified per previous review comment? 3. I have not received anything from the adjacent property owner agreeing to the modifications to their approved drive. As discussed, the Site Plan cannot be approved until the grading conflicts are worked out with the Fedora property. The letter submitted states that they agree to work with you to resolve issues, not that they agree to the changes. 4. Show the location of the fire hydrant on Sheet SP -1 with the fire lane markings. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 5. The location of the existing fire hydrant and water line that was installed with the Lots 5 &6 project is incorrectly shown on Sheet SP -3. However, the fire hydrant will need to be moved to this location. Incorporate the Engineered water line drawing in the Site Plan, showing existing location and proposed location of fire hydrant, entire waterline and taps, and entire easement. 6. Sealed engineered drawings for the water tap, meters /manifold and hydrant relocation are required as previously commented. 7. Provide calculations to support water and sewer demands per fixture units. 8. The City does not use 1 " water meters. 9. Revise curb detail to show curbing on fire lane with 6 -inch pavement. Show or indicate on plans where pavement thickness will be 6 -inch thick and 5- inch. 10. Remove the fire lane designation from southeast side of Building "C" or provide approved turnaround. 11. Remove 9 Asphalt Apron Detail for Sheet SP -2. The detail on Sheet C1 is better. 12. The proposed pilot channel and drainage apron are the same as those that were approved for Lots 5 &6. However, this is not what was constructed. Do you intend to change this design, or construct as proposed? 13. The public drainage easement along the back of the property must be graded to allow for upstream drainage through the property and downstream of the property. 14. Continue concrete pilot channel to downstream inlet. 15. This property is in Impact Fee Area 92 -01. Impact fees are due at time of building permit. Reviewed by: Carol Cotter Date: December 4, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 CITY OF COLLEGE STATION CA DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 2, 2004 TO: James H. Woods, Via fax 846.9133 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOUTHWEST BUSINESS CENTER II (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $200 processing fee for the next round of three (3) staff reviews; and, One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached; Easement Dedication Sheet and required documents for a Blanket Easement prior to Building Permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Jennifer Reeves (jreeves @cstx.gov) or Carol Cotter (ccotter(a�cstx.gov) at 764.3570. Attachments: Staff review comments Easement Dedication Sheet cc: C. Barbu Architect, Via fax 775.5642 ✓ Case file #03- 00500261 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 3 Project: SOUTHWEST BUSINESS CENTER II (SP) - 03- 00500261 PLANNING 1 1. On the parking legend under Parking Requirements for Building "B" Retail Area, your note says (no more than two restaurants allowed on Tots 7 &8). It should say "No more than two Retail ". Please make this correction. - - --2. Please be aware that the masonry wall that is required on this site (Lots 7 &8 that has been installed without site plan approval) will be required to have the same texture, paint, and /or finish on both sides. (Per U.D.O. Section 7.6.i.3.a) �3. The City has received numerous complaints in the past few weeks regarding the outdoor lighting on Lots 5 &6. In response to those complaints the lights have been turned off and disconnected. However, they have since been turned back on, and hence, have not addressed the issue. Therefore, the lights will need to be removed or a different type of lighting or fixture installed prior to any further Certificate of Occupancies for lots 5 &6. This will apply to Lots 7 &8, as well. (Per U.D.O. Section 7.10 A &B) Reviewed by: Jennifer Reeves Date: 12 -30 -03 ENGINEERING 1. The fire hydrant needs to be relocated on the next end island back. The location of the fire hydrant in the drive through island is problematic. Show proposed location and provide engineering documents for relocation. (Previous comment) 2. The 10' PUE that covers the fire hydrant water line extends almost to the back of the property where it turns to go into the back building on Lot 6. Show this easement and water line. Also show the easement and line that enters the front building on Lot 6. Refer to water line drawings approved for Lots 5 and 6. (Previous comment) 3. The Grading Plan does not reflect the recent changes to the Site Plan. Please reconcile. 4. The demand provided for Building A supports a 1 -inch meter. Change 1% inch meter to 1 -inch (Sht SP -3). 5. Water demands are provided for 5 meters; however, the Engineered documents show 7 meters. Please reconcile. 6. Change the manifold line from ductile iron to PVC. (Sht C3) 7. The detail provided for the concrete pilot channel does not incorporate the CMU block wall. Please revise. You will also need to show any modifications that are necessary to achieve the capacity of the drainage channel as originally approved for Lots 5 and 6. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 8. All of the flow in the drainage channel needs to enter the inlet box. It appears that the current design will allow flow to pass the inlet box. Also, verify that what you show matches what has already been constructed on Lots 7 and 8, or indicate that what has been constructed will be modified. 9. Locate the curbing shown in the concrete apron detail closer to the detention outlet so that it is not within the drainage easement. 10. Should there not be some slope to the 18 -inch CMP with slotted -drain pipe? The City's Drainage Policy requires a minimum bottom slope for detention ponds to allow them to drain in time for next rain event. 11. Add erosion control to inlet box. 12. The note on the outfall into the TXDOT drainage ditch is missing. Is it concrete? Riprap? What are dimensions? A 12" toe -wall is required on riprap section. Reviewed by: Carol Cotter Date: December 31, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 CITY OF COLLEGE STATION C _ J DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 21, 2004 TO: James H. Woods, Via fax 846.9133 FROM: Bridgette George, Asst. Development Manager SUBJECT: SOUTHWEST BUSINESS CENTER II (SP) Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval: One (1) revised construction sheet showing the detail of the concrete apron. If you have any questions or need additional information, please call Carol Cotter at 764.3570. Attachments: Staff review comments cc: C. Barbu Architect, Via fax 775.5642 Case file # 03- 00500261 STAFF REVIEW COMMENTS No. 4 Project: SOUTHWEST BUSINESS CENTER II (SP) - 03- 00500261 PLANNING 1. FYI — The masonry wall will have to be painted prior to issuance of any future COs on Lots 5 and 6 or Lots 7 and 8. Reviewed by: Jennifer Reeves Date: January 12, 2004 ENGINEERING 1. Provide detail of concrete apron between flume and inlet box. 2. Verify location of concrete flume near inlet box. Doesn't it come away from the wall? Reviewed by: Carol Cotter Date: January 15, 2004 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2