Loading...
HomeMy WebLinkAboutWater and Wastewater Capacity LetterI)Bury+Partners ENGINEERING SOLUTIONS February 22, 2010 Mr. Alan Gibbs, P.E. City of College Station Department of Development Engineering 1101 Texas Avenue College Station, Texas 77840 Re: HEB College Station No. 2 Store Project Lot 12, Block 3, Phase 3 Tower Point Subdivision West Quadrant State Highways 6 and 40, College Station Texas 77845 Water and Wastewater Capacity Letter Dear Mr. Gibbs: We submit this letter as a component of the Site Plan and Development Permit Applications for the College Station Store Project proposed within the Tower Point Subdivision. Review of the Waterline and Sanitary Sewer Reports as prepared by Walter P. Moore & Associates, Inc. for the Tower Point Infrastructure Development dated November 11, 2009, indicates that there will be sufficient capacity to support development of Lot 12 as proposed within this submittal. Further review of the water report indicates that the looped water main within Lots 12 and 13C provides sufficient pressure and capacity for the HEB store including the adjacent retail spaces. The proposed sanitary sewer system for the development is designed for a peak capacity of 34.5 acres of land including the lots associated with this project. Should you have any questions, do not hesitate to contact this office. Sincerely, S �`p%e Michael E. Sharp Project Manager Bury +Partners -SA, Inc. - TBPE F -1048 I: \001 \504 \Letters \022210 Gibbs.doc.mes.mm Austin • Dallas • Houston • San Antonio • Temple, Texas Fairfax • Williamsburg, Virginia Project No.: 50001 -504 BURY +PARTNERS -SA, INC. 922 Isom Road, Suite 100 San Antonio, Texas 78216 TEL (210) 525 -9090 FAX (210) 525 -0529 www.burypartners.com