Loading...
HomeMy WebLinkAboutDrainage Letterp„ Bury +Partners ENGINEERING SOLUTIONS October 5, 2009 Mr. Alan Gibbs, P.E. City of College Station Department of Development Engineering 1101 Texas Avenue College Station, Texas 77840 Re: HEB College Station No. 2 Grocery Store Lot 12, Block 3, Phase 3 Tower Point Subdivision West Quadrant State Highways 6 and 40, College Station Texas 77845 Drainage Letter Dear Mr. Gibbs: Project No.: 50001 -504 We submit this letter as a component of the Site Plan and Development Permit Applications for the College Station No. 2 store project proposed within the Tower Point Subdivision. The proposed improvements include installation of privately maintained utilities to support the development, an 87,738 SF grocery store with limited retail space, fuel center, automated carwash, and parking field within Lot 12, Block 3 of this subdivision. The proposed improvements are consistent with the Developer's Master Plan and the Preliminary Storm Water Drainage Report for the development as prepared by William P. Moore & Associates. Several privately maintained storm water drainage systems will be provided within the ± 12.5 -acre development to collect surface runoff and covey the discharge to storm sewer inlets as identified in the Development's Drainage Area Map. All internal storm sewers for this property will be designed in accordance with the Unified Storm Water Design Guidelines contained within the Site Design Standards Manual of the City of Bryan and the City of College Station. All storm sewer pipes and inlets will be designed in accordance with the standards to convey storm water runoff for the 10 -year storm design event using a minimum time of concentration of 10 minutes. The grading plan for HEB's property respects the overall development's drainage divides resulting in the conveyance of runoff from this parcel in accordance with the Master Drainage Plan. Approximately 9.2 acres of impervious cover is proposed within the development of this parcel, resulting in an impervious cover value of 0.75 for Lot 12 of Tower Point Subdivision. We do not anticipate any adverse affects to the downstream developments since the post - development storm BURY +PARTNERS -SA, INC. 922 Isom Road, Suite 100 San Antonio, Texas 78216 TEL (210) 525 -9090 FAx (210) 525 -0529 Austin • Dallas • Houston • San Antonio • Temple, Texas Fairfax • Williamsburg, Virginia www.burypartners . com ti Bury--+Partners ENGINEERING SOLUTIONS water runoff for this lot will not exceed the 10 -year storm event design flow presented in the Tower Point Subdivision Preliminary Storm Water Drainage Report. Should you have any questions, do not hesitate to contact this office. Sincerely, Mark R. Jo Principal /S. nior ,'roject Manager I: \001 \504 \Letters \100509 Gibbs.doc.mes.mm r * l .................... MARK ROBERT JOHNSON es ; 82680 41 Ai A , ; ro Mr. Alan Gibbs October 5, 2009 Page 2