Loading...
HomeMy WebLinkAboutLetter Justification for 4" SwrMarch 1, 2012 Josh Norton, P.E. Assistant City Engineer Planning and Development Services City of College Station P 0 Box 9960 College Station, TX 77842 RE: LETTER JUSTIFICATION FOR 4" SERVICE Baumann Office Building Dear Mr. Norton, The purpose of this letter is to formally request permission to serve the Baumann Office Building with a 4" PVC sanitary sewer service line in lieu of a 6" service line. Each of the two office buildings will be equipped with men's and women's restrooms and a small break area. Our conservative peak flow estimate is 1,800 gallons per day or 1.25 gallons per minute or 0.0028 cubic feet per second (cfs). Using the Manning formula, assuming a 2% slope, and an n value of 0.012 for PVC yields a full flow capacity in a 4" pipe of 0.29 cfs and is more than sufficient capacity for the sanitary sewer. Thank you for your consideration. Sin4erely, 1 Sam J. er on, P.E. Project M. ager Bleyl & Associates Planning • Engineering • Management � S�P`� OF rF � i _ i * • . • ,∎ * 1I ' 4 SAM J. VERNON 0 0 'U is . 99353 e s 1 •. ..\ - J 1 1 1 ' 1722 Broadmoor Suite 210 Bryan, Texas 77802 Tex. Reg. No. F -678 Bryan Austin Conroe (979) 268 -1125 (512) 328 -7878 (936) 441 -7833 (979) 260 -3849 Fax (512) 328 -7884 Fax (936) 760 -3833 Fax