The purpose of this letter is to formally request permission to serve the Baumann Office Building
with a 4" PVC sanitary sewer service line in lieu of a 6" service line. Each of the two office
buildings will be equipped with men's and women's restrooms and a small break area. Our
conservative peak flow estimate is 1,800 gallons per day or 1.25 gallons per minute or 0.0028
cubic feet per second (cfs).
Using the Manning formula, assuming a 2% slope, and an n value of 0.012 for PVC yields a full
flow capacity in a 4" pipe of 0.29 cfs and is more than sufficient capacity for the sanitary sewer.
Thank you for your consideration.
Sin4erely,
1 Sam J. er on, P.E.
Project M. ager
Bleyl & Associates
Planning • Engineering • Management
� S�P`� OF rF � i _
i * • . • ,∎ * 1I '
4 SAM J. VERNON 0 0
'U
is . 99353 e s
1 •. ..\ -
J
1 1 1 '
1722 Broadmoor
Suite 210
Bryan, Texas 77802
Tex. Reg. No. F -678
Bryan Austin Conroe
(979) 268 -1125 (512) 328 -7878 (936) 441 -7833
(979) 260 -3849 Fax (512) 328 -7884 Fax (936) 760 -3833 Fax