Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
STAFF COMMENTS
CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 31, 2003 TO: Garrett Engineering, Via fax 846 -3094 ,j FROM: Bridgette George, Assistant Development Manager SUBJECT: UNIVERSITY PARK - PHASE 2— Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, January 5, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for January 15, 2004, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Paid Tax Certificates; One complete set of construction drawings; Ten (10) copies of the revised final plat; One (1) Mylar original of the revised final plat; and, One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college- station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 764.3570. Attachments: Staff review comments cc: University Land Partnership, Via fax 846.9133 v' Case file #03- 00500310 Home of Texas A &M University i STAFF REVIEW COMMENTS NO. 1 Project: UNIVERSITY PARK - PHASE 2 - 03- 00500310 ENGINEERING 1. Staff is still waiting for paid tax certificates to be submitted. 2. It appears this can not be processed as a Minor Plat due to infrastructure issues. 3. You are required to submit construction drawings for approval for water and sewer extensions to all lots. Drawings must be stamped approved for filing of plat. 4. Please replace City Planner certificate with P &Z. 5. Plats within City do not get approved by Commissioner's Court. 6. Please increase font size on bearing and distance calls. Reviewed by: Spencer Thompson Date: December 31, 2003 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer provides 30' of rigid conduit for riser pole(s). Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the city). 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. Email to rbolin @cstx.gov. 6. Developer provides Toad data for project. 7. Developer installs street lighting per city specs and design. 8. Developer provides temporary blanket easement for construction purposes. 9. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date: 12 -18 -03 Home of Texas A &M University 7 GARRETT ENGINEERING a0111UL aamwNa: �w Walt CUB pAINPWA1, sos111t.ats =MI mu .440 148.11101 -441111 RE # o y Plc f . 11 �1 nivevS i P k ca se 1i t/ J V P16:;1- Lc)71s 3c _33 • We Are Sending You : _ Herewith Untkr Semte Cover The Following: Copies Date Decription � i?L_ • 62 - A4/-,-) o r /mil 1.3 �?L�s' sw PIa.4- pf ) �' Remarks: Received By: STAFF REVIEW COMMENTS NO. 2 Project: UNIVERSITY PARK PH2 (FP- REPLAT) - 03- 00500310 ENGINEERING 1. Preliminary infrastructure construction drawings have been received. Comments on construction drawings will be returned separately. In order for the City Engineer to sign the Replat, construction drawings are required to be approved. Reviewed by: Spencer Thompson Date: January 6, 2004 • 7 GARRETT ENGINEERING CONMILINCIVIGNINSINS SLAM INOTAIQ )j Mr sars e...a1saN.SUNS rrSn; .+,.a mons. tw , ntsaas • J To: Co // e .? RE Case A',' /e # 03 - 00 5Oo3/0 4 6/4f c> 6)71s 3c R 3.6 -- /3 /o ck "V " -2. 4 4 Acre rya ct - /'n,'v�rs,'/ �c� - sh are !C We Are Sending You : Hot-with (filo= Se{zu:tte Cover The Following: Co Date Decintion /O /�'/ . , v,'sed Rep IQ /- — / 3 /u e e_r • 420a - /e4g6i4Xes4 1 7 . ( 7/ • / z� . /,e _ 2n-, c /ems Uh /2/3,/03 Remarks: • Received Ely: • G ARRETT_ENGINEERING 4444 CARI=R C EIC POMMY. Saag 1M Taus SW .= - (an ,1170f1/ TO: pert a , L t Da n.. RE: 1. — ELFr t bl IL-10 VJ I IA 4S — We Are Sending You : /Herewith Under Separate Cover The Following: Copies Date Description ,7vJF :avist( Remarks: Received By: 1\i‘iP q.• nu-1 a GARRETT_ENGINEERING aoNSaLTISaaram-3 LANS S.trETVu Mw CUT= CIES9t PARMIA . sus er.4111 Alb TEXAS flu. (Mq samsa .4 li?u4 TO 4y OT 24 9 G 4q� Darr U / - O 2 - O 4 RE Cease . /e ,fz` p.3.. onsoc' i cU • 2 l4 cam/ Lo /.r .‘?C 3 d _ a ch. a V 2. ¢4 ,Acre %a t.7/ L�1 i� /� - Ph ase �� We Are Sending You : Herewith Unties Sep= Se.. Cover The Following: Copies Date Decription / ©/ - © 2 1 '/I /a-i — /0e/,le.f- // Remarks: C13 -310 Received ceived � ue &Loc /- _ (,) ZI ,0,)