January 2, 2004
TO: Wallace Phillips, Greens Prairie Investors, Ltd., Via fax 690.1041 ✓
FROM: Bridgette George, Assistant Development Manager
SUBJECT: CASTLEGATE SUBDIVISION SECTION 5, PH 1 - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Monday, January 5,
10:00 a.m., your project will be placed on the next available Planning and Zoning
Commission meeting scheduled for, January 15, 2004, 7:00 p.m. in the City Hall Council
Chambers, 1101 Texas Avenue.
Two (2) copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college- station.tx. us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will not be scheduled for a Planning &
Zoning Commission meeting. Your project may be placed on a future agenda once all
the revisions have been made and the appropriate fees paid. If you have any questions
or need additional information, please call Carol Cotter or myself at 764.3570.
Attachments: Staff review comments
cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759✓
Case file #03- 00500308
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: CASTLEGATE SUBDIVISION SECTION 5, PH 1 - 03- 00500308
ENGINEERING
1. The ROW for Newark Circle is less than 50 feet. See L15. Minimum Row required is
50 feet.
2. Define PDE to clarify whether it is public or private.
3. Please remove Note 7.
4. Engineering and Development Permit comments to follow under separate cover.
Reviewed by: Carol Cotter Date: January 2, 2004
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2004 version of plat and /or site plan.
email to rbolin @cstx.qov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date: 12 -18 -03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 2
MEMORANDUM
January 6, 2004
TO: Planning and Zoning Commission
FROM: Carol Cotter
Email: ccotter @cstx.gov
SUBJECT: FINAL PLAT for CASTLEGATE SECTION 5, PHASE 1
Item: Consideration, discussion, and possible action on a Final Plat for Castlegate
Subdivision Section 5, Phase 1 consisting of 57 lots on 18.72 acres located off Green's
Prairie Road and Castlegate Drive. (03- 00500308)
Applicant: Wallace Phillips for Greens Prairie Investors, Ltd.
Staff Recommendations: Staff recommends approval of the Final Plat as submitted.
Item Summary: This item is for the consideration of a Final Plat for a residential
subdivision that will allow for the development of 57single family homes. Included in the
development are common areas and a greenway area that encompasses the 100 -year
flood plain located along the northwest property boundary. This Final Plat is in
conformance with the zoning and subdivision regulations and with the Master
Preliminary Plat that was approved by the Commission on December 11, 2003.
Comprehensive Plan Considerations: The Final Plat is in compliance with the Land
Use Plan, which designates the area as Single Family Residential Medium Density (3 -6
DU /acre). The Final Plat is also in compliance with the modified standards approved
with the rezoning, including modifications to standard street widths, sidewalks, lot
dimensions, and setbacks.
Sections 5 will take access from Castlegate Drive, which is designated as a minor
collector on the City's Thoroughfare Plan, and from Green's Prairie Road, which is
designated a minor arterial. This subdivision is located in the Spring Creek Sanitary
Sewer Impact Fee Area 97 -01. Impact Fees will be due at time the Final Plat is filed.
Current fees for this area are $349.55 per Living Unit Equivalent (LUE).
Attachments:
1. Area map
2. Application
3. Copy of Plat on wall of Council Chambers
CITY OF COLLEGE STATION
V DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
January 7, 2004
TO: Wallace Phillips, Greens Prairie Investors ,L Lts., Via fax 690 -1041
FROM: Natalie Thomas Ruiz, Development ' an -'• = i
SUBJECT: CASTLEGATE SUBDIVISION SECTION 5, ' 1 — Construction
Documents
Staff reviewed the above - mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information
for further staff review and approval of the plans:
Two (2) sets of revised construction documents.
If you have any questions or need additional information, please call Carol Cotter
or myself at 764.3570.
Attachments: Staff Review Comments
Cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759
Case file no. 03- 00500308
Home of Texas ABM University
ENGINEERING REVIEW
COMMENTS No. 1
1. Show or note that inlet protection will be installed on all inlets.
2. It is requested that the developer provide extra brick pavers to the City of
College Station for any future repairs to those City Streets involving the
enhanced pavement.
3. The ROW for Newark Circle beginning near Sta 3 +00 is less than 50 feet.
(Sheet 2)
4. Indicate transition to laydown curb on Donnington Drive at Newark Circle.
(Sheet 4)
5. Waterline is shown as 6" in profile of Pipe 7 and 8" in plan view. Please
rectify. (Sheet 6)
6. Add air release to high point of waterline W -2. (Sheet 8)
7. Add or revise note regarding utility line crossing to indicate that the
wastewater main shall be embedded in cement stabilized sand for the total
length of one pipe segment plus 12 inches beyond the joint on each end (per
TCEQ regulations).
8. TCEQ requires that soffits of different line sizes match. The 8 -inch and 6-
inch soffits will need to match. (Sheet 12)
9. Per TCEQ regulations, sanitary sewer that is to be later extended shall end in
a manhole. (Sheet 10, S -1)
Reviewed by: Carol Cotter Date: January 6, 2004
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must
be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City of College Station will constitute a
completely new review.
Page 2 of 2
TRANSMISSION VERIFICATION REPORT
TIME : 01/0712004 11:19
NAME : COCS DEVELOPMENT SER
FAX : 9797643496
TEL : 9797643570
SER.# : BR0E2J341073
DATE, TIME 01/07 11:19
FAX NO. /NAME 96901041
DURATION 00: 00:33
PAGES) 02
RESULT OK
MODE STANDARD
ECM
�ts�an�u
lAts9v seas, JO aWOH
80£00500-E0 "ou alb} ese0
69LLi 9L'6L6 xej eln 'uooxal ` R'd Izlint409 So(' :
si Mal neu gels :siuowLioPIN
'01,9£179L 4e IIesAw J
Jena° !ono Ileo aseald 'uollewJoIul leuomppe peat' JO suoljsanb i(ue eney noA jI
. s }uawnoop uol}onAsuoo pesina.l jo S }as () oMl —
:Su* au} jo lenoxdde pue Malna.l gels aaupnj aoj
uafewaolul f?uar+nollo} ay; }Iuagns pue s}uawuaoo ayf ssa ippe aspald •pessaJppe
eq paau leg; swell 6ullleiep s }uawwoo MO!Aaa gels jo Ts!' e si abed GulMolloJ
eta •peisanbaw Se sluauanoop 6ulJeau!Bua peuoquaw -enage ay; pemeoei gels
quouanooa
uoI on4suoQ – G hi,d '9 NO1103S NOISIAIa8f1S ElVe311,SVa :iaa 8ns
TRANSMISSION VERIFICATION REPORT
TIME : 01/07/2004 11:21
NAME : COCS DEVELOPMENT SER
FAX : 9797643496
TEL : 9797643570
SER.# : BROE2J341O73
DATE, TIME 01/07 11:20
FAX NO. /NAME 97647759
DURATION 00:00:34
PAGE (S) 02
RESULT OK
MODE STANDARD
ECM
AIs1aAJu f I/4 LW s1xa J, JO suzoH
80E00900 'ou ese
69LL "t92'6L6 xe4 e!A `uO3X01 `•R •d `z In aor :oo
s;uatuwoo Marna> 11215 :sluawyaellb
'OL9£179L le ilasi(w ao
io ;loo lore° Ileo aseald `uollewJolul leuolllppe paau Jo sual;senb Aue envy noA
- sluawnoop uollon.gsuoo poslnea Jo slas () OM±
:sueid eui jo lenoadde pue Me AeJ jAs iegi n4 Jo4
uogewaoOul 6u!MOIIoJ alp ;Iwgns pue sluawwoo 8111 sseippe aseald . passaippe.
eq of paau leg; SWeTI 6111lle}ep S1U9WWO3 McIA.01 }gels 10 ;SII a sI e6ed 6u1Mon
ayy •pa ;sanbei se sluawnaop 6ulaaaul6ua pauolluaw -anoge ay} pameln9J Je ;S
s ;u ewnoon
uol analsuoQ — 6 It '9 NO11O3S Nolslnlaans g1VO 11SVO :103r9ns
TE CON „ Co/
iff t)
\fr
General Contractors
Div. of CDS Enterprises, Inc.
1707 Graham Rd. • College Station, TX 77845 • 979 - 690 -7711 • Fax: 979 - 690 -9797
January 6, 2004
Bridgette George
Asst. Development Coordinator
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: Revised Final Plat
Castlegate Subdivision, Section 5, Phase 1
College Station, Texas
Dear Ms. George:
Attached are 2 copies of the revised Final Plat and the mylar original for the above -
mentioned project. A digital copy of the Final Plat will be emailed to Nanette Manhart.
Revisions have been made per your comments dated January 2, 2004.
If you have any questions or need additional information, please do not hesitate to give
me a call at (979) 764 -7743.
Sincerely Yours,
,`
Joe Schultz, P.E.
Engineering Manager
Attachments
6't, to PI
0q6
TXCON
TRANSMITTAL
Date: February 18, 2004
To: Bridgette George
Assistant Development Manager
City of College Station
From: Ginger Urso
Texcon General Contractors
Phone: (979) 764 -7743
Subiect: Revised Final Plat (signed mylar)
Castlegate, Section 5, Phase 1
College Station, Texas
Remarks: Attached are 2 copies of the signed Revised Final Plat and the mylar original.
Please discard the previous copies and mylar that were submitted. A revised
electronic file will be emailed to Nanette. Revisions were made to satisfy
electric department easement requirements.