Loading...
HomeMy WebLinkAboutContstruction Permit LetterSeptember 08, 2009 Todd Carnes: Todd Carnes General Partner Creek Meadows Partners, L.P. 3988 Greens Prairie Road College Station, TX 77845 todd@creekmeadows.net RE: Creek Meadows Section 2, Phase 1B - Construction Permit Sets RME No. 202 -0316 P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 690 -0329 email: civil @rmengineer.com Please find attached three (3) copies of the Construction Drawings released for construction for the above referenced project. Please retain at least one (1) copy of these drawings for your records and for any further reproductions or copies needed. Also, please ensure that your contractor keeps one (1) copy of the permitted construction drawings at the project site at all times through the entire duration of construction. These construction drawings which are released for construction are to replace any previously released drawings and should be the only construction drawings used for fmal bidding or construction of this project. All previously released construction drawings shall be properly disposed of, so that there are no conflicts or contradictions with any construction drawings found on -site. Please note that the release of these construction drawings does not imply approval at any level for any additional permitting that may be required by other local or state regulatory entities. Additional permitting that is required, prior to commencement and/or completion of some or all parts of work contained in the scope of the attached construction drawings, are known to be, but are not limited to: ❖ TCEQ — Stormwater Compliance (package included); ❖ CoCS — Development Permitting (Paving, Drainage, Water, & Sanitary Sewer); • Private Utilities — Verizon, Cox Communications, Atmos Energy, BTU Electric; CD 1- 202 - 0316 -L68 Page 1 of 2 Go+asul *any Engineers Finally, please provide RME with any submittals or RFI's for review or approval in a timely manner. Please contact us should you have any questions. Sincerely, Rabon A. Metcalf, P.E. rabon(a�rmengineer.com Creek Meadows Section 2, Phase 1B - College Station, TX Permitted Construction Drawings September 08, 2009 CD 1- 202 - 0316 -L68 Page 2 of 2