HomeMy WebLinkAboutDrainage and Storm Swr ReportGATTISENGNEERNG
ENGINEERS . CONSULTANTS
2010 Moses Creek Ct. • College Station, Texas 77845 * P: 979.575.5022 * Finn #7698
DRAINAGE & STORM SEWER REPORT
Rock Prairie Professional
Office Complex
1103 Rock Prairie Road
College Station, Texas
Prepared for:
Dr. Ketan Sukkawala
17290 Eagle Pass Drive
College Station, Texas 77845
January 16, 2012
GE013004
* A • : J • •.4......: : :•.
JOE I. GATTIS
e 90964 : Q
A , z i NM. ECG
CERTIFICATION
"I, Joe I. Gattis, PE #90964 certify that this report for the drainage design for the Rock Prairie Professional
by provisions of
v
Office Complex Project in College Station, Texas, was prepared b : f. All licenses
in accordan - „ 'th the pro ce v ses and
the Bryan/College Station Unified Stormwater Design Guidelines for the owners fed drainage
pets re quired by any and all state and federal regulatory agencies for the ' I
improvements have been issued."
A /Mr w4fICO
Joe I. Ga , P.E., PE #90964
GATTISENG NEER1NG
ENGINEERS • CoNSI JLTANTS
di e s tPIZ I OINV
PI** : * *�
JOE I. GATTIS
0
4,-'9 9096 :, : ■
` S /ONAL e-,,
2 -/ 4-0 3„..____>2.__
GATTISENGINEERING
ENGINEERS • CONSULTANTS
2010 Moses Creek Ct., College Station, Texas 77845 * P: 979.575.5022 * Firm #7698
DRAINAGE ROF S OF
ROCK PRAIRIE P JANUARY 2012
PROJECT INFORMATION a design for the Rock Prairie Professional Office
Specifically, this report summarizes the drainage
Complex Development (Subject Property). This development consists of the re- plating of the
existing 2.76 acre tract, `Tract A -1', into three lots for the development of 3 professional office
buildings and associated parking lot areas. This report shall outline and define the current
drainage design and also the expected drainage parameters for all three lots for future
development. The development of Lot 1 is also included in this report. Please see Attachment #1
for the Project Site Re -Plat.
Because the Subject Tract (Tract A -1) is part of report a ilarger, ddition to the existing d t rainage deS shared
stormwater detention facility, this drainage rep°
reports `Drainage Analysis, Southwood Living Center —12.44 acres, Sep tember 1993' by Hester
Engineering and also `Drainage Study, the Esperanza of College Station, dated April 20, 2009' by
ADA Consulting Group, Inc. The 1993 Hester Engineering Report is the Master Drainage Plan
for these multiple tracts and its original design was used as a guideline for evaluation of the
multiple tract's stormwater run-off and detention facility.
EXISTING DETENTION POND FACILITY
The existing Detention Pond Facility located at the rear of Tract d 1 and front of the
` Esperanza of College Station' was designed and sized to captu all
stormwater run -offs from this development (Rock Prairie Professional Office CF � s Health portion
of the Esperanza Development; the Episcopal Church and also a portion
Rehab Center along Rock Prairie Road. The top elevation of the pond is 319.00' with a
maximum capacity of 66,189 cubic feet. The outlet structure is a concrete box with a 14" wide
by 37" tall opening that performs like an orifice to meter - release the stormwater from the
detention pond. It is then carried under the private drive via a 36" reinforced concrete pipe.
Please see Attachment 2 for the original 1993 Master Drainage Design Map.
SUBJECT PROPERTY HYDRAULIC i � O an INFORMATION and with native grasses and is
ract Currently, the Subject Property (T
relatively flat with grades between 0% run in °/ a11 four directions. slight
Stormwater�nxn- off to the West,
tract that causes stormwater run -off
North and East are accounted for in airie Road storm sewer The small remaining storm water run
off to the South enters the Rock
The subject property is located in the Bee Creek Drainag e Basin. The property is located in the
un- shaded Flood Zone "X ", outside of the 500 -Yr. flood plain, as shown on FIRM (Flood
Insurance Rate Map), Map No: 48041C0182 C, dated July 2, 1992.
ROCK PRAIRIE PROFESSIONAL OFFICE - 1 -
GATTIS ENGINEERING
HYDRAULIC ANALYSIS & MODELING
The "Rational Method" (Q) was used to determine storm water run -off for all basins included
within the subject property. The equation approximates storm water run-off production in cubic
feet per second (cfs). Rational Method - Q=C *1 *A
The runoff Cceft� (C) hydraulic the h draulic model were determined by type of land cover and
is
grade as shown in the B /CS Unified Stormwater Design Guidelines. A coefficient of C =0.30 was
used for undeveloped natural grasslands and developed landscaped areas. With respect for the
impervious areas such as buildings, sidewalks, and pavements, a coefficient of C=0.9 was used
for the calculations.
I basin's s st l flow pat T by calculating
minutes m was used for alculatio purposes for flow paths of less
basis longest w path. T
than 10 minutes. The watershed total A rea (A) is in acres. Please see Attachment #3 for 'Tc &
Intensity`Calculations Summary Sheet.
Other resources used to calculate and model the hydraulics of the project were IntelhSOLVE
Hydraflow Hydrographs 2007 for hydrograph generation and detention pond design.
IntelliSOLVEHydraflow Express 2007 application was used and develop and
data n ine ope herein.
channel flow characteristics and capacities. All hydrogiaph support
hydraulic performance for the outfall structure (Grate #1) for the Detention Pond was
determined by the Orifice Equation and Weir Equation, respectively.
ORIFICE: Q= 4.82 *A g * y 12 ; Q—apacity in cubic feet per second
Ag =Orifice Area (sq. ft.)
y= Effective Head on orifice
WEIR.: Q= Cw *L * ; Cw =3.00 (interpolated for broad crested weir) of H= Height of energy grade above crest elevation
EXISTING CONDITIONS
For analysis purposes, `Existing Conditions' is defined as how all three drainage basins existing
today. There are two distinct drainage basins that feed into the existing detention pond facility.
Please see Attachment #4 for Drainage Basin Summary Map. See Table 1 below for Drainage
Summary.
Drainage Basin El (9.43 acres) is composed of a portion of the Esperanza, a portion of the
Fortress Health & Rehab Center and Tract `A -1'.
Drainage Basin E2 (1.82 acres) is the remainder of the Esperanza that flows off -site.
Drainage Basin E3 (4.60 acres) is the existing Episcopal Church and adjoining residential area.
PROPOSED CONDTIONS
The `Proposed Conditions' are defined with the development of dea Subject (Tract bas)
into Lots 1, 2 and 3 with projected office buildings and parking Map. b the
`E -1' and `E -3' not changing. See Attachment #4 for Drainage Basin Summary
future development of Lots 1,2 and 3 as described above, this will increase the stonnwater run -off
coefficient `C' to have a Weighted 'C' = 0.67 for Tract `A -1'. See Table 1 for Drainage
Summary.
Drainage Basin P-1 (9.4 acres) is composed of a portion of the Esperanza, a portion of the
Fortress Health & Rehab Center and projected developed Lots 1, 2 and 3 of Tract `A -1'.
GATTIS ENGINEERING
ROCK PRAIRIE PROFESSIONAL OFFICE - 2 -
DRAINAGE
BASIN
E -1
E -2
E -3
P -1
TABLE 1
DRAINAGE BASIN PEAK RUN -OFF &
DETENTION POND SUMMARY
Wtd. AREA Tc Q(cfs)*
C (acres) (min.) 02 05 010 025 050 0100
0.50 9.4 28.0 17.5 21.2 24.2 27.8 31.6 32.1
** does not flow to detention pond **
0.60 4.6 23.0 11.6 14.0 15.9 18.2 20.7 21.0
0.67 9.4 15.0 33.4 40.3 45.5 52.0 58.9 59.6
Pond In -Flows NY -- 14.0 15.0 40.9 49.9 55.8 63.9 72.4 73.3
Pond Discharges --
21.7 24.4 25.9 27.5 29.1 29.2
Pond Elevation (ft)* 316.49' 316.88' 317.16' 317.51' 317.89' 317.93'
Pond Storage (c.f.) 19,491 24,744 29,134 34,970 41,456 42,123
* Max Elevation is 319.00'
* * See Attachment #6 for Drainage Basin & Detention Pond Hydrographs
As shown above, the existing detention facility has the capacity to handle the existing flows from
all named stormwater sources and also the proposed development of Tract `A -1' into Lots 1, 2
and 3. With the future development of Lots 1, 2 and 3, the Run -Off Coefficient
freeboard increases
from 0.50 (E -1) to 0.67 (P -1) and the detention pond still maintains capacity and
See Attachment #6 for Drainage Basin and Detention Pond Hydrographs.
EXISTING STORM SEWER MAIN (30" RCP & 36" RCP PIPE(S))
As stated above, there is currently an existing storm sewer pipe system located along the private
drive that carries stormwater run-off to the existing detention pond. Originally designed by
Hester Engineering in 1993, this storm sewer main currently has in-flows from the proposed Lots
1 2 and 3 (Tract `A -1') and a portion of the Fortress Health and Rehab Center. The pipe system
is composed of approximately 400 linear feet of 36" RCP at an average grade of - 0.30 %, 412
linear feet of 30" RCP at varying grades from -0.07% to -0.3 %, and 4 specific storm water in-
flow points for Drainage Areas B2, B3, 84, and B5 totaling approximately 4.63 acres. This
comprises the storm sewer main's watershed basin. Areas B2 and 83 enter the storm sewer main
at the 30" RCP and 36" RCP junction box. Areas B4 and 85 enter the storm sewer main at the
beginning of the line close to the Rock Prairie Road right of way. Please see Attachment #7 for
the Storm Sewer Main Pipe Layout, Hydraulic Profiles and Stone Event performance results.
Table 2 below summarizes stormwater in -flows to the storm sewer, its performance and capacity.
TABLE 2
1993 STORM SEWER MAIN
PEAK FLOW & CAPACITY SUMMARY
DRAINAGE Wtd. AREA Tc
BASIN C (acres) (min.) 02 05
Areas B2 & B3 0.70 3.03 10.0 13.1 15.8
Areas B4 & B5 0.72 1.6 10.0 7.4 8.9
S.S. Main Act. Flows ----- 18.7 22.5
S.S. Main Capacity ---- 36.5 36.5
* S.S. Main = Storm Sewer Main
** Please See Attachment #7 for Estimated 1993 Storm Sewer Hydraulic Analysis & Results
Q(cfs)*
010 025
17.7 20.2
9.9 11.4
25.4 29.1
36.5 36.5
Q50 0100
22.9 23.1
12.8 13.0
32.9 33.3
36.5 36.5
ROCK PRAIRIE PROFESSIONAL OFFICE - 3 -
GATTIS ENGINEERING
1993 Storm Sewer Main Performance: Itfl w determ �ed from sl'ic y loads for
existing storm sewer main with 1993 peak parameters
events 2yr through 10yr. However, for storm events
ues. The Hy ough 100yr, the E (Hng Inlet
n'
Grate #1, closest to Rock Prairie Road has capacity drains to the Rock
above the grate elevation of 318.05', thus un- captured stormwater currently
Prairie Road curb & gutter system. Please See Attachment #7 for 1993 Hydraulic Data and 100
Yr Profiles.
2012 Storm Sewer Main Performance: The storm
lo of Lot the stormwater run- offthat
storm event years 2yr through 100yr. With the d development
captured by the Existing Inlet Grate #1 decreased from 0.91 acres
was originally intended to be captu y
(Hester 1993 Design) to 0.29 acres. This dropped the Hydraulic Grade Line at Inlet Grate #1
above the inlet
from 318.28' (2.76" above the inlet grate) to an HGL
ed to the stoma sewer'main'furtherdowe the
gr ate). The remaining stormwater run -off is conveyed
line at Grate Inlet #3. Please See Attachment #7 for 2012 Hydraulic Data & 100 Yr Profiles.
`Note: Line 6, is a 30" RCP and the outfall pipe for the Existing Inlet grate
t #1. Its �
f pavement
elevation 10.4 1
elevation is currently 1" below top of curb and .4 cfs and in a 100 Yr storm
two cfs
elevation for Lot 1 driveway. This 30" pipe has a capacity RCP pipes will storm
u
event carries 5.86 cfs. In order to bypass the driveway conflict, i of 9.0 cfs and used se
in its t oe. The double b10 15" RCP m pipe
Event flow lease See ttach # for Storm Sewer
be able le to handle the
View.
LOTS 1, 2 & 3 STORMWATER DESIGN (Tract `A - 1')
With the development Tract `A -1" into Lots 2 and �e� a�e�tion pond facility located
its individual stormwater run-off and conveying storm sewer main. Upon
to the North of Lot 3 either by surface drainage or utilizing the existing
development of each lot, the capacity of this stone sewer pipe line system shall be verified for
capacity.
LOT 1 DEVELOPMENT: Lot 1 belongs to two Drainage Areas, Drainage Area B5 and Area
`C' (per Hester 1993) respectively. The site improvements (building, parking, etc.) to Lot 1 will
affect Drainage Area B5. The stormwater run-off ea in the proposed ro �$ to areas and will be
captured via grate inlets and a curb inlet box
conveyed to the 30" RCP storm sewer line along e 4164 acres of land eoated adjacent
Rock detention pond. The second drainage area, Area 'C' th
Rock Prairie Road right -of -way. Area C's stormwater run -off flows to the Rock Prairie Road
right -of -way consistent to the Hester 1993 drainage design. For detailed, on -site stormwater
flows of Lot 1, please see Attachment #5.
The Existing Conditions for Lot 1 are defined by the Post - Development Map on Attachment #2.
The Subject Tract (Lots 1, 2, and 3)i' 0.72 comprised
The 2012 r Weighted 'C' for the Subject Tract is also
Weighted `C' for the Subject Tracts Engineering
0.72. Thus meeting the original drainage design parameters set forth by Hester En
drainage design in 1993.
In Table 3 below, is a summary of peak storm water flows from the projected developed Lots 1,
2, 3 and Area `C'. Please See Affa_ #8, for Lot 1 Hydrographs.
ROCK PRAIRIE PROFESSIONAL OFFICE - 4 -
GATTIS ENGINEERING
TABLE 3
Yr 2012 LOT & STORM SEWER MAIN
PEAK FLOW SUMMARY
DRAINAGE Wtd. AREA Tc Q(cfs)*
BASIN C acres min. 1 2 1 5 1 10 1 25 1 50
0.81 0.81 10.0 4.2 5.0 5.7 6.5 7.3
0.80 0.774 10.0 4.0 4.8 5.3 6.1 6.9
0.61 1.111 15.0 3.6 4.3 4.9 5.6 6.3
0.30 0.164 10.0 0.37 0.44 0.50 0.57 0.64
Lot1
Lot 2*
Lot 3*
AREA C
ROCK PRAIRIE PROFESSIONAL OFFICE
- 5 -
100
7.4
7.0
6.4
0.65
LOTS 2 & 3 will not have any improvements with the development of Lot 1, and their existing drainage
patterns will remain the same as they exist at the time of this report in January 2012. As described above,
with the future development of Lots 2 & 3, their stormwater designs must be analyzed and verified for
conformity with the parameters established by the drainage design by Hester in 1993 and also the designs
described herein.
PROJECT DRAINAGE DESIGN SUMMARY
This drainage report is composed of two parts. In the first part, the detention pond, the
surrounding drainage areas and their associated stormwater in -flows to the detention pond were
analyzed for performance and compliance under the `Existing Conditions' of today (January
2012.) The pond and its outfall structure performed as designed and met all City standards. In
addition, the detention pond was evaluated for performance and capacity including the future
development of Lots 1, 2 and 3 (Tract `A -1') and the expected increased storm water in-flows,
also known as `Proposed Conditions'. As shown above in Table 1, with the increase in storm
water run -off from Lots 1, 2 and 3, the detention pond and outfall structure perform as designed.
The detention pond has enough capacity for the development of Lots 1, 2 and 3 without needing
any additional expansion and maintaining plenty of freeboard.
In the second part of this report, the existing storm sewer main was analyzed for performance
under 1993 conditions and 2012 conditions. In Table 2, the 1993 results illustrated that the storm
sewer main meets intended design for stonn water conveyance capacity for all storm events, but
further analysis showed that at the Existing Inlet Grate #1, the Hydraulic Grade Line (HGL) for
storm events 2yr through 25yr performed, but falters for storm events 50yr through 100yr. For
these storm events, the HGL is above the grate elevation demonstrating capacity deficiencies.
The excess stormwater thus by- passes Inlet Grate #1 and into the Rock Prairie Road right -of -way.
With the development of Lot 1 (Yr 2012), a majority of the storm water run-off was re- directed to
further down the storm sewer line, relieving the in -flow stress on Grate #1 and thus remedying
the HGL deficiencies for all stone events. Please see Table 4 Below for a summary of HGL
results for all storm events.
DRAINAGE GRATE
BASIN ELEV.
1993 Inlet Grate #1 318.05'
2012 Inlet Grate #1 318.05'
** Please See Attachment #7 for Estimated
TABLE 4
1993 & 2012 STORM SEWER HGL SUMMARY
HGL
02 05 010 025 050
317.35' 317.56' 317.73' 318.00' 318.44'
317.14' 317.31' 317.44' 317.63' 317.81'
1993 Storm Sewer Hydraulic Analysis & Results
0100
318.44'
318.08'
GATTIS ENGINEERING
IN SUMMARY, the development of Tract `A -1' into Lots 1, 2 and 3 matches the expected run-
off coefficient `C' of 0.72, matching the 1993 expected run -off coefficient `C`C'o Water
development of the Subject Tract also conforms to the existing drainage P
run-off quantities as pre - determined in the original drainage design. Therefore,
this report
demonstrates that the proposed development of b � lcompiidan3c �� � Bryce Prairie
of College -
Office Complex in College Station, Texas,
Station's Unified Stormwater Design Guidelines.
Respectfully Submitted,
GATTIS ENGINES 1 G
° q i.
Joe • is, P.E.
L' - sed Professional Engineer #90964
_�oNN,Ne
. *h
JOE
•••• •..
l I • 90964
�'V 1 ACOly
ROCK PRAIRIE PROFESSIONAL OFFICE - 6 -
GATTIS ENGINEERING
ATTACHMENT #1
Re -Plat of Southwood Holdings
Tract `A -1'
ROCK PRAIRIE PROFESSIONAL OFFICE - 6 - GATTIS ENGINEERING
Ll
/ /ff
/ /
_ — f - — — — 4b—' \ N 07;36'03-
/
•
/
Stz
/ /
— / /
/ /
% <' /
W
/
ml �
F Q
0
/ /
/ /
/ / / /
/ /
/ /
//
/
id / / /
/ / / //
II / / / /
/ /
/ / /
/ / \ < 'J
/ / / '' / �-
F / / / / \
/ Y // 4 '' 9/ X69 /// / \ \ \6's/ \\ • \
/ / kb /// // ^). s � \ hi
/ / // / / / \'t'\ \\
/ / / \ / / cn \\ /
/ / / / '‘Z\ , \ ` N - a \J'
ul , / / / \ \ 0- // /
// / \ \ \� - / // /
/ // \ \d' �\ / / /
1 �'Y \. \ /0 / /
Vii;\ /j, /
/ R� /
\\ 0 `' /
(J (D
25 a
0 ;3 U
0
/ /� / / 3
zz_- -_ � — / - - --
-7 -/
•
/ //, / ///
/
• // , '/ / /
/ • ' %
0
Z
M
otf O
N
V! O
O
I—
D
\\
O.
III' ' -; /
/////, %//
/ / /:0///./
/ / '
/ / //
// / /
// ' /j ///
5
ie
W
co
a
cc
/
/ /
/ /
/
/ / / //
/////
\ \
/
/ /
/ //
/
re
O
w
0)
w
z
0
/\
////
\
/ a
\ \
4
5!
44 5
EZ
w
w
Z
Z
Y/
a
0
ATTACHMENT #2
1993 Drainage Summary Map
By Hester Engineering
ROCK PRAIRIE PROFESSIONAL OFFICE - 7 -
GATTIS ENGINEERING
,.
,. �;':
ATTACHMENT #3
Tc & Rainfall Intensity Data Sheet
ROCK PRAIRIE PROFESSIONAL OFFICE - 8 - GATTIS ENGINEERING
TR55 Tc Worksheet
Hyd. No. 1
E -1
Description
Sheet Flow
Manning's n -value
Flow length (ft)
Two-year 24 -hr precip. (in)
Land slope ( %)
Travel Time (min)
Shallow Concentrated Flow
Flow length (ft)
Watercourse slope ( %)
Surface description
Average velocity (ft/s)
Travel Time (min)
Channel Flow
X sectional flow area (sqft)
Wetted perimeter (ft)
Channel slope ( %)
Manning's n -value
Velocity (ft/s)
Flow length (ft)
Travel Time (min)
A B C
= 0.150 0.011 0.011
= 260.0 0.0 0.0
= 4.50 0.00 0.00
= 0.70 0.00 0.00
Totals
= 27.01 + 0.00 + 0.00 = 27.01
= 54.00 23.00 0.00
= 8.00 0.10 0.00
= Unpaved Paved Paved
= 4.56 0.64 0.00
= 0.20 + 0.60 + 0.00 = 0.79
0.00
0.00
0.00
0.015
0.00
0.0
0.00 0.00
0.00 0.00
0.00 0.00
0.015 0.015
0.00 0.00
0.0 0.0
= 0.00 + 0.00 + 0.00 = 0.00
Hydraflow Hydrographs by Intelisolve v9.22
Total Travel Time, Tc 28.00 min
TR55 Tc Worksheet
Hyd. No. 2
E -3 Church
Descriotion
Sheet Flow
Manning's n -value
Flow length (ft)
Two-year 24 -hr precip. (in)
Land slope ( %)
Travel Time (min)
Shallow Concentrated Flow
Flow length (ft)
Watercourse slope ( %)
Surface description
Average velocity (ft/s)
Travel Time (min)
Channel Flow
X sectional flow area (sqft)
Wetted perimeter (ft)
Channel slope ( %)
Manning's n -value
Velocity (ft/s)
Flow length (ft)
Travel Time (min)
A
= 0.150
= 278.0
= 4.50
= 1.50
= 21.00 +
= 24.00
= 8.00
= Unpaved
= 4.56
= 0.09 +
= 0.00
= 0.00
= 0.00
= 0.015
= 0.00
= 0.0
= 0.00 +
B
C
0.011 0.011
0.0 0.0
0.00 0.00
0.00 0.00
0.00 + 0.00 = 21.00
160.00 0.00
0.60 0.00
Paved Paved
1.57 0.00
1.69 + 0.00 = 1.78
0.00
0.00
0.00
0.015
0.00
0.0
0.00
0.00
0.00
0.015
0.00
0.0
0.00 + 0.00 = 0.00
Hydraflow Hydroyraphs by Intells°Iva v9.22
Totals
Total Travel Time, Tc 23.00 min
TR55 Tc Worksheet
Hyd. No. 3
P -1
Desc ription
A B C Totals
Sheet Flow
Manning's n -value = 0.150 0.011 0.011
Flow length (ft) = 115.0 0.0 0.0
Two-year 24 -hr precip. (in) = 4.50 0.00 0.00
Land slope ( %) = 0.80 0.00 0.00
Travel Time (min) = 13.33 + 0.00 + 0.00 = 13.33
Shallow Concentrated Flow
Flow length (ft) = 90.00 53.00 23.00
Watercourse slope ( %) = 0.60 8.00 0.10
Surface description = Unpaved Unpaved Paved
Average velocity (ft/s) = 1.25 4.56 0.64
Travel Time (min) = 1.20 + 0.19 + 0.60 = 1.99
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope ( %) = 0.00 0.00 0.00
Manning's n -value = 0.015 0.015 0.015
Velocity (ft/s) = 0.00 0.00 0.00
Flow length (ft) = 0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Hydraflow Hydrographs by Inteiisolve v9.22
Total Travel Time, Tc 15.00 min
Retum
Period
Intensity Values (in/hr)
1 -yr
2-yr
3 -yr
5-yr
10-yr
26-yr
60 -yr
100 -yr
SCS 24 -hour
0.00
4.50
0.00
(Yrs)
S min
10
15
20
25
30
35
40
45
60
65
60
1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2
821
6.39
528
4.53
3.99
3.57
3.24
2.97
2.75
2.56
2.40
2.26
3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
9.85
7.69
6.38
5.48
4.83
4.33
3.93
3.61
3.34
3.12
2.92
2.75
10
10.98
8.63
7.19
6.21
5.49
4.94
4.50
4.14
3.84
3.59
3.37
3.18
25
12.51
9.86
8.23
7.12
6.30
5.67
5.18
4.77
4.43
4.14
3.89
3.68
50
14.10
11.15
9.33
8.08
7.16
6.48
5.90
5.44
5.05
4.73
4.45
4.20
100
14.17
11.24
9.43
8.18
7.27
6.56
6.00
5.54
5.15
4.82
4.54
4.30
Storm
Distribution
Rainfall Precipitation Table (in)
1 -yr
2-yr
3 -yr
5-yr
10-yr
26-yr
60 -yr
100 -yr
SCS 24 -hour
0.00
4.50
0.00
6.20
7.40
8.40
9.80
11.00
SCS 6-Hr
0.00
3.33
0.00
0.00
0.00
0.00
0.00
7.90
Huff -1st
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Huff -2nd
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Huff -3rd
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Huff -4th
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Huff -Indy
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Custom
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Return
Period
(Yrs)
Intensity - Duration - Frequency Equation Coefficients (FHA)
B
D
E
(N/A)
1
0.0000
0.0000
0.0000
- --
2
65.0000
8.5000
0.7950
- - --
3
0.0000
0.0000
0.0000
----
5
76.0000
8.5000
0.7850
10
80.0000
8.5000
0.7630
---
25
89.0000
8.5000
0.7540
---
50
98.0000
8.5000
0.7450
---
100
96.0000
8.5000
0.7350
----
Hydraflow Rainfall Report
Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jan 16, 2012
File name: Brazos County Rainfaf - TxDOT.IDF
Intensity = B / (Tc + D)AE
Tc : time in minutes. Values may exceed 60.
Precip. file name: Brazos County Rainfall.
ATTACHMENT #4
2012 Drainage Summary Map
ROCK PRAIRIE PROFESSIONAL OFFICE - 9 - GATTIS ENGINEERING
on
uJ
0
L
co
W
w
U
0
z N
(t)
m rz
w0
3
0
(n
z
0
H
0
z
0
C_D
z
(s
x
w
co
0
oco
O �
II
2 0
U +
— (n N
LU
Z 0 z
-
Q c� Q Q
and N [D
z 11 CO _ z
Q
°
*
* _
0
O �
Q =
0
(n I co
� w
z
rs- Om
z
II 0, ( <`:( D
<< O z
CZ
Q :
0
o3
LO '
11 1 -
N
U +
1
w I
U
Q
N
11 co
< c()
Q�
ATTACHMENT #5
Lot 1 — Grading & Elevation Plan
ROCK PRAIRIE PROFESSIONAL O F F I C E -10 -
GATTIS ENGINEERING
WOJ !)KR133NIOtrtS LLltlO%!+ {NI
Uth; SL516L61. 1Mk w.l mxI*S a f9$ J x°B'O'd
8691 YU73
8 O DOO mr`- , 8 9 8992999922992222 282222 228 9 O - .n • 8, 0 8 88888 °88 88 , 88n
- J, 6�oi �9N- -u�,n ��8.n i�utmut vi at •n8 Nr -v:n N.B� �N¢],O t`r` n a --
aia; mmoo 000 , 9„2 22 OOmmmm mmmmmommmmmm2
om o
cmoromcm
N N
,n R��n,n �nmm mmM m; � rm .-� mnm mmm+n mK;mmm
m229 f�92N t9VNCYi,NNf.2926N,+1Y •2958899999 959
._NmY•n tD r`Uat" __._._- ._._....._ N NN NNN mmm mmmmmmm YYY YY YYYY'C•P •PN� ^. v1 N. 'J, 'll
u X00
1 1
SITS 5 5F - 5tr - 5,f 511
29 oU5 m[ @C 1l OE6
ZLOZ AIIvnNvr
SVX31 `NOILV1S 3031100
X31dW00 33IAdO
1VNOISS3dOad 311:1IVUld NN301I
NY1d 1OUINO3
NOISOL13 '8 NOIIVA313
'8 30VNIVUG 31IS
ATTACHMENT #6
Drainage Basin & Detention Pond
Hydrographs
ROCK PRAIRIE PROFESSIONAL OFFICE -11- GATTIS ENGINEERING
Hydraflow Table of Contents
SUKKAWALA -1.gpw
Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jan 16, 2012
Watershed Model Schematic 1
Hydrograph Return Period Recap 2
2 - Year
Summary Report 3
Hydrograph Reports 4
Hydrograph No. 1, Rational, E -1 4
Hydrograph No. 2, Rational, E -3 Church 5
Hydrograph No. 3, Rational, P -1 6
Hydrograph No. 4, Combine, Total In -Flows 7
Hydrograph No. 5, Reservoir, Pond Routing 8
Pond Report - Existing Detention Pond 9
5 - Year
Summary Report 10
Hydrograph Reports 11
Hydrograph No. 1, Rational, E -1 11
Hydrograph No. 2, Rational, E -3 Church 12
Hydrograph No. 3, Rational, P -1 13
Hydrograph No. 4, Combine, Total In -Flows 14
Hydrograph No. 5, Reservoir, Pond Routing 15
10 - Year
Summary Report 16
Hydrograph Reports 17
Hydrograph No. 1, Rational, E -1 17
Hydrograph No. 2, Rational, E -3 Church 18
Hydrograph No. 3, Rational, P -1 19
Hydrograph No. 4, Combine, Total In -Flows 20
Hydrograph No. 5, Reservoir, Pond Routing 21
25 - Year
Summary Report 22
Hydrograph Reports 23
Hydrograph No. 1, Rational, E -1 23
Hydrograph No. 2, Rational, E -3 Church 24
Hydrograph No. 3, Rational, P -1 25
Hydrograph No. 4, Combine, Total In -Flows 26
Hydrograph No. 5, Reservoir, Pond Routing 27
50 - Year
Summary Report 28
Hydrograph Reports 29
Hydrograph No. 1, Rational, E -1 29
Hydrograph No. 2, Rational, E -3 Church 30
Hydrograph No. 3, Rational, P -1 31
Hydrograph No. 4, Combine, Total In -Flows 32
Hydrograph No. 5, Reservoir, Pond Routing 33
Contents continued...
SUKKAWALA -1 .gpw
100 - Year
Summary Report 34
Hydrograph Reports ... 35
Hydrograph No. 1, Rational, E -1 35
Hydrograph No. 2, Rational, E -3 Church 36
Hydrograph No. 3, Rational, P -1 37
Hydrograph No. 4, Combine, Total In -Flows 38
Hydrograph No. 5, Reservoir, Pond Routing 39
Watershed Model Schematic
1
Hydraflow Hydrographs by Intelisolve v9.22
Leaend
. ri 'n Description
1 Rational E -1
2 Rational E -3 Church
3 Rational P -1
4 Combine Total In-Rows
5 Reservoir Pond Routing
5
Project: SUKKAWALA -1.gpw
Monday, Jan 16, 2012
Hyd.
No.
Hydrograph
type
(origin)
Inflow
Peak Outflow (cfs)
Hydrograph
description
Hyd(s)
1 -Yr
2 -Yr
3-Yr
6-Yr
10 -Yr
25-Yr
50-Yr
100 -Yr
1
Rational
----
----
17.50
--
21.21
24.16
27.77
31.58
32.07
E -1
2
Rational
---
11.55
--
13.98
15.88
18.22
20.70
20.99
E -3 Church
--
3
Rational
- --
- - --
33.38
--
4028
45.45
52.02
58.93
59.58
P -1
4
Combine
2, 3
- --
40.92
--
49.40
55.81
63.91
72.43
73.27
Total In -Flows
5
Reservoir
4
- - --
21.72
24.37
25.87
27.53
29.09
29.21
Pond Routing
-
Proj. file: SUKKAWALA -1.gpw
Monday, Jan 16, 2012
Hydrograph Return Period Recap
2
Hydraflow Hydrographs by Intelisolve v9.22
Hyd.
No.
Hydrograph
type
(origin)
Peak
Clow
(cfs)
Time
intervat
(min)
Time to
peak
(min)
Hyd.
volume
(cuft)
inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
description
1
Rational
17.50
1
28
29,397
--
- --
--
E -1
2
Rational
11.55
1
23
15,942
—
- --
---
E -3 Church
3
Rational
33.38
1
15
30,043
--
--
- --
P -1
4
Combine
40.92
1
15
45,985
2, 3
- --
---
Total In -Flows
5
Reservoir
21.72
1
25
45,984
4
316.49
19,491
Pond Routing
SUKKAWALA
-1.gpw
Retum Period: 2 Year
Monday, Jan 16, 2012
Hydrograph Summary Report
3
Hydraflow Hydrographs by Intelisolve v9.22
Hydrograph Report
Hydraflow Hydrographs by Intolisolve v9.22
Hyd. No. 1
E -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
18.00
15.00
12.00
9.00
6.00
3.00
0.00
0
Hyd No. 1
= Rational
= 2 yrs
= 1 min
= 9.400 ac
= 3.723 in/hr
= Brazos County
10
20
Rainfall- TxDOT.IDF
E -1
Hyd. No. 1 — 2 Year
30
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by TR55
Asc/Rec limb fact
40
50
Monday, Jan 18, 2012
= 17.50 cfs
= 28 min
= 29,397 cuff
= 0.5
= 28.00 min
= 1/1
4
Q (cfs)
18.00
15.00
12.00
9.00
6.00
3.00
0.00
60
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intellsotve v9.22 Monday, Jan 16, 2012
Hyd. No. 2
E -3 Church
Hydrograph type = Rational Peak discharge = 11.55 cfs
Storm frequency = 2 yrs Time to peak = 23 min
Time interval = 1 min Hyd. volume = 15,942 cuft
Drainage area = 4.600 ac Runoff coeff. = 0.6
Intensity = 4.186 in/hr Tc by TR55 = 23.00 min
IDF Curve = Brazos County Rainfall - TxDOT.IDF Asc/Rec limb fact = 1/1
Q (cfs)
12.00
10.00
8.00
6.00
4.00
2.00
0.00
E -3 Church
Hyd. No. 2 — 2 Year
Hyd No. 2
5
Q (cfs)
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 3
P -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0
2
4
Hyd No. 3
= Rational
= 2 yrs
= 1 min
= 9.430 ac
= 5.283 in/hr
= Brazos County
6
8
10
Rainfall- TxDOT.IDF
12
P -1
Hyd. No. 3 — 2 Year
14
16
18
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by TR55
Asc/Rec limb fact
20 22
24 26 28
6
Monday, Jan 16, 2012
= 33.38 cis
= 15 min
= 30,043 cult
= 0.67
= 15.00 min
= 1/1
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 4
Total In -Flows
Hydrograph type
Storm frequency
Time interval
Inflow hyds.
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
0 2
Hyd No. 4
= Combine
= 2 yrs
= 1 min
= 2, 3
Hyd No. 2
Total In -Flows
Hyd. No. 4 — 2 Year
Hyd No. 3
Peak discharge =
Time to peak =
Hyd. volume =
Contrib. drain. area =
7
Monday, Jan 16, 2012
40.92 cfs
15 min
45,985 cuft
14.030 ac
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 5
Pond Routing
Hydrograph type
Storm frequency
Time interval
Inflow hyd. No.
Reservoir name
Storage Indication method used.
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
0
10
Hyd No. 5
= Reservoir
= 2 yrs
= 1 min
= 4 - Total In -Flows
= Existing Detention Pond
20
30
Hyd No. 4
Pond Routing
Hyd. No. 5 — 2 Year
Peak discharge
Time to peak
Hyd. volume
Max Elevation
Max. Storage
40
50
60
70
Total storage used = 19,491 cuft
= 21.72 cfs
= 25 min
= 45,984 cult
= 316.49 ft
= 19,491 cuft
8
Monday, Jan 16, 2012
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
80
Time (min)
Pond Report
Hydraflow Hydrographs by Intelisohre v9.22
Pond No. 1 - Existing Detention Pond
Pond Data
Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 313.51 ft
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 313.51 00 0 0
0.49 314.00 1,421 232 232
1.49 315.00 8,531 3,886 3,898
2.49 316.00 11,778 9,026 12,923
3.49 317.00 15,211 13,457 26,380
4.49 318.00 18,802 16,876 43,256
5.49 319.00 27,581 22,933 66,189
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in) = 36.00 37.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00
Span (in) = 36.00 14.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00
No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33
Invert El. (ft) = 313.51 313.52 0.00 0.00 Weir Type = -- __ -_ _-
Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = No No No No
Slope (%) - 1.00 0.00 0.00 n/a
N -Value = .013 .013 .013 We
Orifice Coeff. = 0.83 0.80 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area)
Multi -Stage = Ns Yes No No TW Elev. (ft) = 0.00
Stage (ft)
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0.00
4.00
Total 0
8.00
Note: CuNert/OrlIce outflows are analyzed under Inlet (ic) and outlet (oc) control Wet risers checked for (Aloe condlbons (lc) and submergence (s).
1200
Stage / Discharge
1800
20 00
24 00
2800
32 00
9
Monday, Jan 16, 2012
Elev (ft)
319.51
318.51
317.51
316.51
315.51
314.51
313.51
36 00
Discharge (cfs)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
description
1
Rational
2121
1
28
35,630
--
- --
- --
E -1
2
Rational
13.98
1
23
19,294
--
- --
- --
E -3 Church
3
Rational
40.28
1
15
36,254
--
- --
- --
P -1
4
Combine
49.40
1
15
55,548
2, 3
--
- --
Total In -Flows
5
Reservoir
24.37
1
26
55,547
4
316.88
24,744
Pond Routing
SUKKAWALA -1.gpw
Retum Period: 5 Year
Monday, Jan 16, 2012
Hydrograph Summary Report
1 0
Hydraflow Hydrographs by Intefsolve v9.22
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 1
E -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
0.00
0
Hyd No. 1
= Rational
= 5 yrs
= 1 min
= 9.400 ac
= 4.512 in/hr
= Brazos County
10
20
Rainfall- TxDOT.IDF
E -1
Hyd. No. 1 — 5 Year
30
Peak discharge =
Time to peak =
Hyd. volume =
Runoff coeff. =
Tc by TR55 =
Asc/Rec limb fact =
40
50
21.21 cfs
28 min
35,630 cuft
0.5
28.00 min
1/1
11
Monday, Jan 16, 2012
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
0.00
60
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 2
E -3 Church
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q(cfs)
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0 2
Hyd No. 2
= Rational
= 5 yrs
= 1 min
= 4.600 ac
= 5.066 in/hr
= Brazos County Rainfall - TxDOT.IDF
E -3 Church
Hyd. No. 2 — 5 Year
Peak discharge =
Time to peak =
Hyd. volume =
Runoff coeff. _
Tc by TR55 =
Asc/Rec limb fact =
12
Monday, Jan 16, 2012
13.98 cfs
23 min
19,294 cuft
0.6
23.00 min
1/1
4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Q (cfs)
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 3
P -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
0
2
4
Hyd No. 3
= Rational
= 5 yrs
= 1 min
= 9.430 ac
= 6.376 in/hr
= Brazos County
6
8
10
Rainfall- TxDOT.I DF
P -1
Hyd. No. 3 — 5 Year
12
14
16
18 20
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by TR55
AsclRec limb fact
22
24 26
Monday, Jan 18, 2012
= 40.28 cfs
= 15 min
= 36,254 cult
= 0.67
= 15.00 min
= 1/1
28
13
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 4
Total In -Flows
Hydrograph type
Storm frequency
Time interval
Inflow hyds.
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
0 2 4 6
Hyd No. 4
= Combine
= 5 yrs
= 1 min
= 2, 3
Hyd No. 2
Total In -Flows
Hyd. No. 4 -- 5 Year
-- Hyd No. 3
Peak discharge =
Time to peak =
Hyd. volume =
Contrib. drain. area =
14
Monday, Jan 16, 2012
49.40 cfs
15 min
55,548 cult
14.030 ac
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v922
Hyd. No. 5
Pond Routing
Hydrograph type
Storm frequency
Time interval
Inflow hyd. No.
Reservoir name
Storage Indication method used.
Q (cfs)
0
10
Hyd No. 5
= Reservoir
= 5 yrs
= 1 min
= 4 - Total in -Flows
= Existing Detention Pond
20
30
Hyd No. 4
Pond Routing
Hyd. No. 5 — 5 Year
40
50
Peak discharge
Time to peak
Hyd. volume
Max. Elevation
Max. Storage
60
Total storage used = 24,744 cult
Monday, Jan 16, 2012
= 24.37 cfs
= 26 min
= 55,547 cult
= 316.88 ft
= 24,744 cult
70
15
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
80
Time (min)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cuft)
inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
description
1
2
3
4
5
Rational
Rational
Rational
Combine
Reservoir
24.16
15.88
45.45
55.81
25.87
1
1
1
1
1
28
23
15
15
26
40,595
21,911
40,907
62,818
62,817
--
--
--
2, 3
4
- --
--
- --
- --
317.16
- --
---
--
---
29,134
E -1
E - 3 Church
P-1
Total In -Flows
Pond Routing
SUKKAWALA -1.gpw
Retum Period: 10 Year
Monday, Jan 16, 2012
Hydrograph Summary Report
16
Hydraflow Hydrographs by lntelisolve v9.22
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 1
E -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
28.00
24.00
20.00
16.00
12.00
8.00
4.00
0.00
0
Hyd No. 1
= Rational
= 10 yrs
= 1 min
= 9.400 ac
= 5.141 in/hr
= Brazos County
10
20
Rainfall- TxDOT.IDF
E -1
Hyd. No. 1 — 10 Year
30
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by TR55
Asc/Rec limb fact
40
50
17
Monday, Jan 16, 2012
= 24.16 cfs
= 28 min
= 40,595 cult
= 0.5
= 28.00 min
= 1/1
Q (cfs)
28.00
24.00
20.00
16.00
12.00
8.00
4.00
0.00
60
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jan 16, 2012
Hyd. No. 2
E -3 Church
Hydrograph type = Rational Peak discharge = 15.88 c fs
Storm frequency = 10 yrs Time to peak = 23 min
Time interval = 1 min Hyd. volume = 21,911 cult
Drainage area = 4.600 ac Runoff coeff. = 0.6
Intensity = 5.753 in/hr Tc by TR55 = 23.00 min
IDF Curve = Brazos County Rainfall- TxDOT.IDF Asc/Rec limb fact = 1/1
Q (cfs)
18.00
15.00
12.00
9.00
6.00
3.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hyd No. 2
E -3 Church
Hyd. No 2 —10 Year
18
0 (cfs)
18.00
15.00
12.00
9.00
6.00
3.00
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 3
P -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
0
2
4
Hyd No. 3
= Rational
= 10 yrs
= 1 min
= 9.430 ac
= 7.194 in/hr
= Brazos County
6
8
10
Rainfall- TxDOT.IDF
P -1
Hyd. No. 3 —10 Year
12
14
16
18
Peak discharge =
Time to peak =
Hyd. volume =
Runoff coeff. =
Tc by TR55 =
Asc/Rec limb fact =
20 22
24 26 28
Monday, Jan 16, 2012
45.45 cfs
15 min
40,907 cult
0.67
15.00 min
1/1
19
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by 1n101130lva v9.22
Hyd. No. 4
Total In -Flows
Hydrograph type
Storm frequency
Time interval
Inflow hyds.
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 2
4
= Combine
= 10 yrs
= 1 min
= 2, 3
Hyd No. 4 Hyd No. 2
Total In -Flows
Hyd. No. 4 —10 Year
Hyd No. 3
Peak discharge =
Time to peak =
Hyd. volume =
Contrib. drain. area =
Monday, Jan 16, 2012
55.81 cfs
15 min
62,818 cuft
14.030 ac
WINE
RIMEL
OE&
20
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.
0.00
6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 5
Pond Routing
Hydrograph type
Storm frequency
Time interval
Inflow hyd. No.
Reservoir name
Storage Indication method used.
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00
i
0
10
Hyd No. 5
= Reservoir
= 10 yrs
= 1 min
= 4 - Total In -Flows
= Existing Detention Pond
20
30
Hyd No. 4
Pond Routing
Hyd. No. 5 —10 Year
40
50
Peak discharge
Time to peak
Hyd. volume
Max. Elevation
Max. Storage
60
Total storage used = 29,134 cuft
Monday, Jan 18, 2012
= 25.87 cfs
= 26 min
= 62,817 cult
= 317.16 ft
= 29,134 cult
70
21
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00
80
Time (min)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
description
1
2
3
4
5
Rational
Rational
Rational
Combine
Reservoir
27.77
1822
52.02
63.91
27.53
1
1
1
1
1
28
23
15
15
27
46,847
25,145
46,820
71,985
71,964
--
--
--
2, 3
4
- --
--
- --
- --
317.51
---
E-1
E -3 Church
P -1
Total In -Flows
Pond Routing
---
- --
--
34,970
SUKKAWALA -1.gpw
Retum Period: 25 Year
Monday, Jan 16, 2012
Hydrograph Summary Report
22
Hydraflow Hydrographs by Intelisolve v9.22
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 1
E -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
28.00
24.00
20.00
16.00
12.00
8.00
4.00
0.00
0
Hyd No. 1
= Rational
= 25 yrs
= 1 min
= 9.400 ac
= 5.908 in/hr
= Brazos County
10
20
Rainfall- TxDOT. I DF
E -1
Hyd. No. 1 — 25 Year
30
Peak discharge = 27.77 cfs
Time to peak = 28 min
Hyd. volume = 46,647 cuft
Runoff coeff. = 0.5
Tc by TR55 = 28.00 min
Asc/Rec limb fact = 1/1
40
50
23
Monday, Jan 16, 2012
Q (cfs)
28.00
24.00
20.00
16.00
12.00
8.00
4.00
0.00
60
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 2
E -3 Church
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
21.00
18.00
15.00
12.00
9.00
6.00
3.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hyd No. 2
= Rational
= 25 yrs
= 1 min
= 4.600 ac
= 6.602 in/hr
= Brazos County Rainfall - TxDOT.IDF
E-3 Church
Hyd. No. 2 — 25 Year
Peak discharge =
Time to peak =
Hyd. volume =
Runoff coeff. =
Tc by TR55 =
Asc/Rec limb fact =
18.22 cfs
23 min
25,145 cult
0.6
23.00 min
1/1
24
Monday, Jan 16, 2012
Q (cfs)
21.00
18.00
15.00
12.00
9.00
6.00
3.00
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v922
Hyd. No. 3
P -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0
2
4
Hyd No. 3
= Rational
= 25 yrs
= 1 min
= 9.430 ac
= 8.234 in/hr
= Brazos County
6
8
10
Rainfall- TxDOT.IDF
P -1
Hyd. No. 3 — 25 Year
12
14
16
18 20
Peak discharge =
Time to peak =
Hyd. volume =
Runoff coeff. =
Tc by TR55 =
Asc/Rec limb fact =
22
24
26
25
Monday, Jan 16, 2012
52.02 cfs
15 min
46,820 cult
0.67
15.00 min
1/1
28
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 4
Total In -Flows
Hydrograph type
Storm frequency
Time interval
Inflow hyds.
Q (cfs)
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 2
Hyd No. 4
= Combine
= 25 yrs
= 1 min
= 2, 3
Total In -Flows
Hyd. No. 4 — 25 Year
Hyd No. 2 Hyd No. 3
Peak discharge =
Time to peak =
Hyd. volume =
Contrib. drain. area =
26
Monday, Jan 18, 2012
63.91 cfs
15 min
71,965 cuft
14.030 ac
Q (cfs)
70.00
60.00
50.00
40.00
30.00
20.00
10.
0.00
4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisotva v9.22
Hyd. No. 5
Pond Routing
Hydrograph type
Storm frequency
Time interval
Inflow hyd. No.
Reservoir name
Storage Indication method used.
Q (cfs)
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.0
0
1 0
= Reservoir
= 25 yrs
= 1 min
= 4 - Total In -Flows
= Existing Detention Pond
20
30
Hyd No. 5 Hyd No. 4
Pond Routing
Hyd. No. 5 — 25 Year
40
50
Peak discharge
Time to peak
Hyd. volume
Max. Elevation
Max. Storage
60
70
Total storage used = 34,970 cuft
Monday, Jan 16, 2012
= 27.53 cfs
= 27 min
= 71,964 cult
= 317.51 ft
= 34,970 cult
1
1
1
■
80
27
Q (cfs)
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
90
Time (min)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(nun)
Hyd.
volume
(cut)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cam)
Hydrograph
description
1
Rational
31.58
1
28
53,055
—
--
--
E -1
2
Rational
20.70
1
23
28,561
--
--
--
E -3 Church
3
Rational
58.93
1
15
53,041
--
—
--
P -1
4
Combine
72.43
1
15
81,602
2, 3
--
- --
Total In -Flows
5
Reservoir
29.09
1
27
81,601
4
317.89
41,456
Pond Routing
SUKKAWALA -1.gpw
Retum Period: 50 Year
Monday, Jan 16, 2012
Hydrograph Summary Report
28
Hydraflow Hydrographs by Intelsolve v9.22
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 1
E -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0
Hyd No. 1
= Rational
= 50 yrs
= 1 min
= 9.400 ac
= 6.719 in/hr
= Brazos County
10
20
Rainfall- TxDOT.IDF
E -1
Hyd. No. 1 -- 50 Year
30
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by TR55
AsclRec limb fact
40
50
29
Monday, Jan 16, 2012
= 31.58 cfs
= 28 min
= 53,055 cult
= 0.5
= 28.00 min
= 1/1
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
60
Time (min)
Hydrograph Report
Hydraflow Hydrographs by IntelisoWe v922
Hyd. No. 2
E -3 Church
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
21.00
18.00
15.00
12.00
9.00
6.00
3.00
0.00
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hyd No. 2
= Rational
= 50 yrs
= 1 min
= 4.600 ac
= 7.499 in/hr
= Brazos County Rainfall- TxDOT.IDF
E -3 Church
Hyd. No. 2 — 50 Year
Peak discharge =
Time to peak =
Hyd. volume =
Runoff coeff. =
Tc by TR55 =
Asc/Rec limb fact =
20.70 cfs
23 min
28,561 cult
0.6
23.00 min
1/1
30
Monday, Jan 18, 2012
Q (cfs)
21.00
18.00
15.00
12.00
9.00
6.00
3.00
Hydrograph Report
Hydraflow Hydrographs by Intel'solve v9.22
Hyd. No. 3
P -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00
Hyd No. 3
= Rational
= 50 yrs
= 1 min
= 9.430 ac
= 9.328 in/hr
= Brazos County
Rainfall- TxDOT.IDF
P -1
Hyd. No. 3 -- 50 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by TR55
Asc/Rec limb fact
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28
31
Monday, Jan 16, 2012
= 58.93 cfs
= 15 min
= 53,041 cuft
= 0.67
= 15.00 min
= 1/1
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intel'solve v9.22
Hyd. No. 4
Total In-Flows
Hydrograph type
Storm frequency
Time interval
Inflow hyds.
Q (cfs)
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0
Hyd No. 4
= Combine
= 50 yrs
= 1 min
= 2, 3
Hyd No. 2
Total In -Flows
Hyd. No 4 — 50 Year
Hyd No. 3
Peak discharge =
Time to peak =
Hyd. volume =
Contrib. drain. area =
Monday, Jan 16, 2012
72.43 cfs
15 min
81,602 cuft
14.030 ac
32
Q (cfs)
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 5
Pond Routing
Hydrograph type
Storm frequency
Time interval
Inflow hyd. No.
Reservoir name
Storage Indication method used.
Q (cfs)
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0
10
Hyd No. 5
= Reservoir
= 50 yrs
= 1 min
= 4 - Total In -Flows
= Existing Detention Pond
20
30
Hyd No. 4
Pond Routing
Hyd. No. 5 — 50 Year
40
50
Peak discharge
Time to peak
Hyd. volume
Max Elevation
Max. Storage
60
70
80
Total storage used = 41,456 cuft
33
Monday, Jan 16, 2012
= 29.09 cfs
= 27 min
= 81,601 cuft
= 317.89 ft
= 41,456 cult
I
■
■
Q (cfs)
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
90
Time (min)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cult)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(curt)
Hydrograph
description
1
Rational
32.07
1
28
53,876
--
- --
--
E -1
2
Rational
20.99
1
23
28,960
—
- --
- --
E -3 Church
3
Rational
59.58
1
15
53,625
--
- --
--
P -1
4
Combine
73.27
1
15
82,585
2, 3
- --
- --
Total In -Flows
5
Reservoir
29.21
1
27
82,584
4
317.93
42,123
Pond Routing
SUKKAWALA -1.gpw
Retum Period: 100 Year
Monday, Jan 16, 2012
Hydrograph Summary Report
34
Hydraflow Hydrographs by Intellsolve v9.22
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 1
E -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
E -1
Q () Hyd. No. 1 —100 Year Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0
Hyd No. 1
= Rational
= 100 yrs
= 1 min
= 9.400 ac
= 6.823 in/hr
= Brazos County
10
20
Rainfall- TxDOT.IDF
30
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by TR55
Asc/Rec limb fact
40
50
= 32.07 cfs
= 28 min
= 53,876 cult
= 0.5
= 28.00 min
= 1/1
35
Monday, Jan 16, 2012
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
60
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisoive v9.22
Hyd. No. 2
E -3 Church
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
21.00
18.00
15.00
12.00
9.00
6.00
3.00
0.00
0 2
Hyd No. 2
= Rational
= 100 yrs
= 1 min
= 4.600 ac
= 7.603 in/hr
= Brazos County
Rainfall- TxDOT.IDF
E -3 Church
Hyd No. 2 —100 Year
Peak discharge =
Time to peak =
Hyd. volume =
Runoff coeff. =
Tc by TR55 =
Asc/Rec limb fact =
20.99 cfs
23 min
28,960 cuft
0.6
23.00 min
1/1
Monday, Jan 16, 2012
4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
36
Q (cfs)
21.00
18.00
15.00
12.00
9.00
6.00
3.00
0.00
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisowe v9.22
Hyd. No. 3
P -1
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
60.00
50.00
40.00
30.00
20.00
10.00
0.00
Hyd No. 3
= Rational
= 100 yrs
= 1 min
= 9.430 ac
= 9.431 in/hr
= Brazos County
Rainfall- TxDOT.IDF
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by TR55
Asc/Rec limb fact
0 2 4 6 8 10 12 14 16 18 20 22 24
= 59.58 cfs
= 15 min
= 53,625 cult
= 0.67
= 15.00 min
= 1/1
37
Monday, Jan 16, 2012
P -1
() Hyd. No. 3 —100 Year Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00
26 28 30
Time (min)
Hydrograph Report
Hydratbw Hydrographs by Intelisolve v9.22
Hyd. No. 4
Total In -Flows
Hydrograph type
Storm frequency
Time interval
Inflow hyds.
Q (cfs)
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
= Combine
= 100 yrs
= 1 min
= 2, 3
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46
Time (min)
Hyd No. 4
Hyd No. 2
Total In -Flows
Hyd. No. 4 —100 Year
Hyd No. 3
Peak discharge =
Time to peak =
Hyd. volume =
Contrib. drain. area =
Monday, Jan 16, 2012
73.27 cfs
15 min
82,585 cuft
14.030 ac
38
Q (cfs)
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
Hydrograph Report
Hydraflow Hydrographs by Intelisoke v9.22
Hyd. No. 5
Pond Routing
Hydrograph type
Storm frequency
Time interval
Inflow hyd. No.
Reservoir name
Storage Indication method used.
Q (cfs)
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
/ /,
■
7
■
■
0
10
Hyd No. 5
= Reservoir
= 100 yrs
= 1 min
= 4 - Total In -Flows
= Existing Detention Pond
20
30
Hyd No. 4
Pond Routing
Hyd. No. 5 —100 Year
40
50
Peak discharge
Time to peak
Hyd. volume
Max Elevation
Max. Storage
60
70
80
Total storage used = 42,123 cult
39
Monday, Jan 16, 2012
= 29.21 cfs
= 27 min
= 82,584 cult
= 317.93 ft
= 42,123 tuft
Q (cfs)
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
90
Time (min)
ATTACHMENT #7
Storm Sewer Layout,
Hydraulic Analysis & Results
100 Year Storm Sewer Profiles
ROCK PRAIRIE PROFESSIONAL OFFICE -12 - GATTIS ENGINEERING
Yr -1993 STORM SEWER
HYDRAULIC DATA & 100 yr PROFILES
ROCK PRAIRIE PROFESSIONAL OFFICE / GATTIS ENGINEERING
k
T
2
W
z
g
4 c
1
m
i
D
M
0
S
g
8
R
e
1
g
F
e
1i
E
� c
0
E_
� a
0
P) () 1) Cr) M
o 8 8 0
of of ao co ao
J N kg N V N
0 C! m (o A 1: (O
lrf M M (r) (o)
W 8 8 2 2
C 1 • ) a) () O) ( )
m g ^ g 2
j < (6 10 IA a
c (+) ao a 2 (o ( )
aE a O v v
r — in CO CO CO (0
g' ^c m m O O
(V .- 0 0 0
C ▪ E C O O O O O
E O p C O C
r r r
• U 0 0 0 0 0
re
o * r 2 8 8 8 0
E - < •�- v .- O
g v ( 8 F. 8 m
Q '— 0 0 0
E _ 8 8 � p 8 8 p 8 p
J j Q N I, N M
CO
N (V) Nt 111
0
w
W >
W a
0
c E'
8?
cc
o
to co
m
co
U I U
GO re a Ce
• c c
Q 05 Q
8 ° 8 8
ao of of o
co a') c) !�')
co
N 10
J
0
o)
lh
. 883888
C fh 1[i In In V
O) 1'') O) R) lh
8� 8; 88 8
IA In In V
l+) () Ih () /r)
n
6 0 0 o g o
E� X8888 °8
$2 . 8 ;7 8 Po' 4
z .Vi N W aD o) a i
.i F O N N N N
c— z
cc
IC) 6 .- O O
8 E N — 0 0 0
O O O
0 o o
8
O 0 o O
2 8 8 3
F Q :a v •- o
�1 7A8S8�m
Q o o 0
�g �888 88
H N IO r
a
0
p
H 0
g
E •
CO
2 U as U
• a re w aD
co c 0 c as
Q 4 Q
8 °880
od o) o) a0 of
M M M
2 2 8 8 O IA
of o) a; 0 ad
J
8 ° 4
m n (al
M M M M M
I t C,
co co co M co
0
CO CO M CO CO
M M M M
M CO M M M
o
S 8
t7 N () N
S N U
o) of vt
N f0 m (O
co co co CD
O
E N. 0 0 0
C O 0 0 O O
E, 0 0 0 0 0
8 P P 8
0 0 0 0
o 74 8888
gI g38 ;82
zz, < s - 0 0 0
E 8 8 8 8 p 8
J " N
c.;
g
7 5 • N M v-
0
N M CO
J
J o.'
S
c
m
off
ud 0 0 0 N
a ix M rx m
o c o c o
a a _ a
8 K g 880
o ai o f co of
co M co co M
▪ j 0
J 8 O 8
_ C O o W O
el M M
8 8
co I- is
M r)
10 (0
CO M Cr) M CO
• g 8 8 s.
4 ila on a
> co co co co co
8. ytg O
o o o — o
8
3g R,`8 d v 8 (0.
2-' o �' o ;
r r �
E E Q E )n • o 9
I- E N • 0 0 0
CE C O 0 0 0 0
F E o 0 0 0 0
r r r
sig 6P8PP8
0 0 0 0 0
r
T : 2 8 8
• Q v .- -
cI �. 8 8
a o
O 0)100)
o) of o 0 o)
o)
0
8
co
0
0
m
8 8 8 8 8
0
cc tz
. 0
E� 8 ° 88 °
o 0 oi oi
0 M cc> M 01
° 8 8 3 8
1 j of o) co co 0
U , o) co C ) Rf co
8 o O I O
i € r vi n: m a P
F) l+) CO CO P)
0 0- C co ,- co o
V) P) 0) 0 M
W lh O 8 8. mt
;6 0 C a 0) l+) lh M
8 & 8 2
0.1 j ' ai 10 1
P) PI Cr) 07 0)
s g 8 8 o g 8
y 0 0 0 .- o
a g 8 8 8 g
Ip 0) N V N
0
at a
LL v
O
8
Sg e 8 8 8 3
0 � in m
c
..■•■•
O O
N
C 't. 'a -. O O
8 E N .- 0 0 0
® 0O 0 0 0 o
EF E o 0 0 0 0
V 0 0 0 0 0
et
3° 8 8 8 8
gal a .- . o
azt
e 8 7:7) a:! _< .- 0 0 0
gy = p C 8 8 ,� 8 8
J J & § N N 8
H E
1 N M 1-
0
.- N M nt LL)
J
8
• 8 1 8 8
ao
ai aA ao of
O
M co M M M
° 8 8 0
M M M M Cr)
8 8 0 1 8
ai ai ai
CI VI 011 Po
_a a N N g C
o5 r co (p P: t0 P:
W
5 co M M CO M
Zs" M N N N
o
4L
� a $
g' v ai ai ic) v
0 0 s N fh oi
C
E N
O
s O O O
C O O 0 0 0
CE I O o O C O
✓ r r
oQ 8 88 8
•r o
g D., 8 8 0) 8 0
Q a d o
• 8 8 X 88 8 8 8
J < N N N lh
C .- N
•• N
1nO Z9•9I-E 13 'AUI
00"66£ 13 W!2!
Z :u - 00'90 +9 BIS
UI 00•96£ '13 'AUI
InO 69176E '13 'AUI
06'66£ '13 W!2i
6 :Ul - 00'00+tV els
UI 6E E6£ 13 'AU/
00136£ 13 'pule
Ile o - 00'00 +0 eiS
0 0
O
co
co
O
O
N
CO
0
M
0
0
co
8
N
N
M
0
0
CO
()
0
CO
M
8
c)
0
0
o_
co O
1
(D
0
(
0
1)
0
0
t()
O
I0
0
O
M
dl
O ce
0
1)
N
0
0
N
O
O
O
0
0
0
0
M
;nO 68'S1,E 13 "AU
1,0'81,£ 13 W!a
"ul - 00 9Z +Z e:s
ul 99'91,£ '13 'AU!
3nO ZL'SIE 13 'nut
S0'8LE "I3 W!2i
c :ul - 00'90 +Z EIS
Ul LS'S1,E 'I3 'AU!
O Z9 "91,E "19 "Aul
00'61,£ 13 W!a
00'00+0 BIS
0
GCS
0
N
0
0
oci
co
0
0
tri
N
co
0
0
tr)
M
o
0
(V
N
M
0
('l
M
0
0
O)
M
0
0
0)
0
0
o
0
(D
M
0
0
M
N
N
8
N
0
LO
e
0
0
e
1.0
0
to
to
N
0
1nO £9 I I•£ '13 'nil
95'81•£ '13 w21
S • it - 00'0E+0 BIS
it 99176E '13 'AUI
�nO
6917 1.£ 13 'MI
01'61.E 13 w!a
00'00 +0 elS
O
O
N
M
O
O
1
6
D
1
O
O
M
O
O
Ty
e)
O
O
N
Co)
O
O
O
O
0
0
1
T
M
O
O
0
0
•
_
M
O
0
O
O
N
M _
O
O)
0
O
O
O
O
0
O
M
O
O
0
Yr -2012 STORM SEWER
HYDRAULIC DATA & 100 yr PROFILES
ROCK PRAIRIE PROFESSIONAL OFFICE R GATTIS ENGINEERING
V
as
as
a
0
•
i
•
P$
1
8 ° 8 .- .- N 8 °
co co co co co co co P)
8 1 O 8 N 8 O IA
y j O1 O) 6 CO O) co o6 6
C7 P) P) l+) M P) P) M
CD C
-
CD a
0
8 LL
O IE
H
— C
J3 E
o cc
go
H0
c
H g
d
C
5
o 2� 0 0 0 0 /`(0
ig
S X
L
Pi O W O O ° 8
O m m A A A A m
P) P) CO Cr) P) 07 P) P)
P) P) C7 C■) P) Cr) P) P')
W +K $ 8 8 0 . $ $ 8.
C P) P) P7 P) P) P) P) P)
u! j C v O O m O to O
P) M P) P) Ch P) Cr) Cr)
n 0 g. g. 8 3 N 8 8 8 c
o_ co �- 0 0 0 0 0 0 0
A 8 /h r CO • 8
s3 1P) pi M "' V $ r
.V... 8 N 0 6 r O� O pp TI
A N N O
• • v v 0 P) co N lC)
r B100) leP i s
. (4 v v O Pi C+i 0i 10
• r P> ra v m ' • 10
✓ v v v v v v v
C, P7 Cr
of — 0 704 00
• V Pi N 0 v- 0 0 0
c O o O o O o 0 0
E 0 0 0 0 0 0 0 0
gm f 8 8 8
g8-00(000000
o 1 S) 1[1 S A • 8 8 m
< .
F w�pp 8 .- 0 •- 0 0 •-
g C) lh 8 8 N • N m
Q O O O O O O
• 8 O 8
•
0
10 cc n: v:
8 8 r' 8 8 V- 8
O V O
ri CC
N P) P) 1L) CO I-
r N P) ver 10 CO A CO
cercrececz
re � v o 8 8 .. 0 CO O
1 Co a 0 0 ) Q 0) o) co C) Cr) Ih CO M t ) l+) M
E
°8r -8R8S8
of o) o) 0 of m 0 a
VI r) a) r) F) c4 r) c0
M co o) m t7 M CO
r V I. 4) �
(9 a r u m P- rP- ( (0 0
) c') l+) 0, 0) l+) o) co
W g 8 8 tD $ $
t0 M /h th t'7 el VI VI)
s t0 t0 F S. S. 2
j C 4 In O t0 to 4) I 4
s C C O o O C - C
O. N
el P) CO t+) N M
c 8 8 th 8 8 8
ao 3 8 8 R 8
N r r r tV r
N 4)
N o
ttv) fG
P)
C
N
N
CO
N In ( Ps 4 8 N N
It) It) r V () N IC)
7 . � 1 r I 8 R O)
v .0 4) 16 N Y7
$ F a0 0) . v. N V vl vt
— v In 4) In In In In
)=U
cF
•
g' 0 8 3 8 F ffi
0 0 0 0 0 0 0
� 0
tp t� p� p
11 1 8 2 4) N r' S 8 m
F Q V rr p o i� .- a 0 r
0 N !h O O N N (O m
Q O O O O O O r
1 — 88 8- 88888
V N N O n tD N
t7
E
o
E
r
0
r O O O N O O
M N O r O O O
o O o o O O o
0 0 0 0 0 0 0
N P7 t`') b t0
r N t+) V ID t0 P CO
s ao of of of of ai (D ai
M CO CO M M M M M
re S ' IA N S O 1
j C Ol O) Ol C0 O) OD 0 W
M M M M M M M
J N M M M 4
= C C 10 60 rs. A IA
M M M M M M M M
= j Cl (G IA 1": n. (0
Ce
M M M M M M M M
. r (h O 2 O fD /0 (O $ Iti
C M M M M M M M M
S S (O 8 (O I� 8 S
ais. �... t6 1I) (0 I() M 16
M M M M M M CO M
� 0 6'. C C O o C O
— (V r r r r ( r
$ M i$ v g
....: M N co M r O r (D (V
1 C O O O O O O O O
c= E O o 0 0 0 0 0 0
r r r r r
gI 6g8I�8ggf8
0 0 0 0 0 0 0 0
et
F , Q v 4 r p r y p 0 � �
R.
V M S O l�l N (0 m
. � . r
0 0 0 0 0 0 . -
8 8
8 S ( 8 8 83
J
(O
N 8
N M M 10 f0 r
0
N a N (0 N S $
CO (0 r a v M (0
N Of N S (O
CO (0 r v M (0
0�00-00
r O O O
$ r N M 'Q 10 (0 P GO
0
$ E
U
wwwww
C M) (0 F- 1- N- I- l.
M M M M M M M M
J (D 1~A In
U a fD to Is ,. r A (O
2 8 8/7i 8 g $$
r) Ici ca (0 10 In Io v
C M M M Col CO l+) M
8°8
EC .51 n
8 V 8 c4i 1 8 0 8
of of of co or ad co oS
. 0. $gg88 88
ac;1omco t)1o..
MM M pp M P') M M (V) M
a M $ S N $ $ 8
CO 773. 8 < C
(ILL t gla
H
1- U
I: I: — If) v M I•
1 ' -
0 ) 0 ) 0 0 . - 0
04 — 0 0 0 0
I g :2:0c/000000
cp 0 0 0 0 0 0 0 0
6
c ' 0 0 0 0 0 0 0 0
oQ ,
gf
v
X
8
M M M M M CO M 0)
0) M M M M M M CO
M M M M CO CO M M
8 8
8 8
IA ad
(O l4l N
7 el f0
co M
IN v m Ol A o) o) O)
CO (0 (0 (0 (0 (0 (0 (0
R'►�$
0 .- 0 0
8 8 Iii — �i
0 0 0 0 0 0
8 0 8 8 8 8 8
N M M I[) (0
n M a IA (0 n CO
rererewie
alcccc
8 : O 8 a N 8
K cc; O) O) 17) Oi co a0 (6
(, en Cr) in CO M (r) (r)
E O O I 8 O 8 O S
g O) O) D) co O) a0 a0 a0
lr) 0 () (r) /r) co co (r) CO to
- ; m r- A 1- A (G
O C 1p
co a) co In Cr) (1) CO (n
fV N
- 1g- (O 10 ti !` aD (O
_ (0 n (D
co co Cr) M ( r) (r) CO CO
W r v a') ta to m to ID O (D (O I D (O
W — 2228 Dad 83
S a ID ID a0 ID ID ID a
(r) p) (r) p) Cr) lr) 0) 0
N .. O o 0 0 0 o -
I 'E 8221222V2
IS : �p in (°8, 4 8
(J LL 2' M ( N p O ; : � � p O N
3 p .R O! s 0) g (7 8 I
f.. r L N ti a0 i (0 (D 0) co
N n a0 - — (0 In 0) t0
.1 g CO ■ - Cr) P V CO n A
& — ( ): r: I: 1: 1: is 1:
F C aD aD O o .- o O
O E a c+i .- o — 0 0 0
7 c o o o o o o o 0
c i= E o 0 0 0 0 0 0 0
§1 6 83 • Sc !S
o 0 o 0 0 0 ci 0
FQ It .- o . - o o
_e(
8 8 8 R- 8 8
,
x 0 0 0 0 0
J C C! O 8 N 0 ^ f0 N oi
g
- J <
0 E .- N 0) 0) 10 CO
0
E .- 01 in V IA (0 A to
V
• O O 8 O 10) N 8 O
• E QQD OD Oi d 0) CD C0 Ol
co co M CO Cr) 0) M M
S 8 N 8 O 1n
▪ j C oA O) 0) 10 0) O co a0
to 00 F) M p M l+)
( )) (
J (N A 8 O 8$ O A
= 0 C 0 00 Is co a0 0 00 00
= j - (0 00 1 c p 00 00 00 00
W r 8 O I[ O f0 $ $ $
N IA 00 In LO In
0o l0 co 0r) 0) 0) 0) CO
Itl
Q.
0 `8 fr re CL re �
coccEccow
l ytggar48
O c .- o
ai 8 B 8 ! 8 8i : �8
p
; fff ppp � /// M A W O) V q N N v-
If) 0V
U LL v 0h N O o O o • ( N
g
pp
O j 0 N
�'
C
• J
0g
m
C
J
▪ a In In 00 0 0 1[) 'f
00 • 00 .- 00 0 O)
0) 0) 0+) 0) 0r) M VI 0)
0) 0) 0+) p) VI 0) CO Co)
0) CO 0+) CO 0) M 0) l+')
o
1 8 . - 0
1 - 4 v 1- 1 0
10) 1• O) • . • 0h • a
Ps Ps 1: /o co co co 0O
n N 8 8 N
00 00 .- 00 us v 0A
PO
C p
N 8 S tz N
0 0 o0 0 0 0 o c
c 0 O) c0 O O) r O
N 0 0 0 0 0
• O O O O O O O O
£ O p O O O O O O
°88
O 0
s 8 8 8 N N 8 0
.- O O O O O
8 $ $ O1
N O A 00 N N
N 0) 0) 10) (0 .�
. - N 0) CO CO n 00
;no Z9'SI•E '13 'AUI
00'61•£ 'I3 w!2J
Z :ul
ul 00'SI.£ 13 'AU!
flO 691.6E '13 'MI
06'66£ 13 wlel
L :U7 - 00'00 +b BIS
ul 6£'EL£ 13 'AUI
00'86£ 13 'Pule
IIeilnO - 00'00+0 BIS
8
O
m cY)
W
O
O
(O
Cr)
0
N
M
0
0
CV
N
c)
8
N
N
0
O
8
CD
( )
O
O
(
8
v
8
0
(h
O
O
(o
8
O
co
O
O
0
N
O
N
O
1()
O
t)
3
M M
M
M
M
M
OE"9LE 13 'nuI
09'9LE 13 M!2!
■
- 1.91-"0E +Z el<S
100 "9LE "13 AU I
■ Z9 "94.£ 13 'nul
9L"6LE "13 Pa
1
O
i
— ,'olL
i
1
- L9L "OZ +L els
1 L9 9L£ 13 'AU!
) Z9 "9L£ 13 'AUI
00'6LE 13 W!el
is
L.
0'0 (- .0C — lll'
i L'OZl
00'00+0 e4S
1 1 a
O
b:ul
u
In c
E ul
In
0
8
t0
0
0
0
O
of
0
0
co
0
0
ri
a
W
O
0
Cr) Oti
O
0
0
0
('1
N
M
0
O
of
M
0
O
co
M
P
0
0
N
O
1)
r
0
0
0
If)
0
3
Storm Sewer Profile boo %hi)
CV
c)
6996E 13'AUI
60"9•£ 13 wIa
CO
M
M
M
M
1 00'99 +6 EIS
199'96£ 13 . nuI
ZL'S6£ 13 "nuI
90 13 W
\
11117
1 - 00'9£ +6 B9
U 99 13 'AU/
)99"91.E 13 'AUI
OZ "66E 13 w!t1
C
J
a
11- 0010L +O BIS
JI Z9'S6E "13 'nuI
) Z9 "9I 13 'nuI
96'66£ 13 w!a
S
0 O
t
b
VI
4
i
00'00 +0 LIS
'1/4
Q
Q
v
47.
v
a
L
3
co
E
L
co
In
L :u
u
In
9 :u
3n
S:
In
8
O
to
8
(V
0
O
0)
e
0
W
O
O
co
csi
c)
0
Lo
N (
8
N
Cr)
0
Ci
M
O
O
6
O
O
O
O
M
0
M
M
0
N
1
O
0
r-
0
to
tn
N
O
e
t
1
cr
■ £819.E '13 'nuI c� M `) " in
in
9981.E 13 wl2i
•-�—•
-
- 686'6£ +b E1S
189"P1.£ 13 'AU!
1 65 '13 'AUI
01..61.E 'I3 wl2i
1 00'00 +V 2 S
1 16E "ELE 13 'Aul
008L£ 13 'Pi°
el
\
1 0 - 0000 +0 EIS
we
0
0
0
1
0
a
L.
0
d
E
L
O
1
3
8 :ill
u
In c
1. :
11
O
O
O
O
O
O
O
(0
N
CO
O
O
O
O
cci
0
0
M
O
O
0
sr
M
O
O
O
O
O
co
M
0
O
O
0)
0
O
M
O
O
O
O
N
0
It)
O
O
1
0
O
ATTACHMENT #8
Lots 1, 2, 3 & Area `C' Hydrographs
ROCK PRAIRIE PROFESSIONAL OFFICE -13 - GATTIS ENGINEERING
Hydraflow Table of Contents
Hydraflow Hydrographs by Intelisolve v9.22
Hydrograph Return Period Recap 1
2 - Year
Summary Report
Hydrograph Reports
Hydrograph No. 1, Rational,
Hydrograph No. 2, Rational,
Hydrograph No. 3, Rational,
Hydrograph No. 4, Rational,
5 - Year
Summary Report
Hydrograph Reports
Hydrograph No. 1, Rational,
Hydrograph No. 2, Rational,
Hydrograph No. 3, Rational,
Hydrograph No. 4, Rational,
10 - Year
Summary Report
Hydrograph Reports
Hydrograph No. 1, Rational,
Hydrograph No. 2, Rational,
Hydrograph No. 3, Rational,
Hydrograph No. 4, Rational,
25 - Year
Summary Report
Hydrograph Reports
Hydrograph No. 1, Rational,
Hydrograph No. 2, Rational,
Hydrograph No. 3, Rational,
Hydrograph No. 4, Rational,
50 - Year
Summary Report
Hydrograph Reports
Hydrograph No. 1, Rational,
Hydrograph No. 2, Rational,
Hydrograph No. 3, Rational,
Hydrograph No. 4, Rational,
100 - Year
Summary Report
Hydrograph Reports
Hydrograph No. 1, Rational,
Hydrograph No. 2, Rational,
Hydrograph No. 3, Rational,
Hydrograph No. 4, Rational,
Lot 1 - Yr 2012
Lot 2 - Projected
Lot 3 - Projected
Area 'C'
Lot 1 - Yr 2012
Lot 2 - Projected
Lot 3 - Projected
Area 'C'
Lot 1 - Yr 2012
Lot 2 - Projected
Lot 3 - Projected
Area 'C'
SUKKAWALA- aTTACH8.gpw
Tuesday, Jan 17, 2012
2
3
3
4
5
6
7
8
8
9
10
11
12
13
13
14
15
16
17
18
Lot 1 - Yr 2012 18
Lot 2 - Projected 19
Lot 3 - Projected 20
Area 'C' 21
22
23
Lot 1 - Yr 2012 23
Lot 2 - Projected 24
Lot 3 - Projected 25
Area 'C' 26
27
28
Lot 1 - Yr 2012 28
Lot 2 - Projected 29
Lot 3 - Projected 30
Area 'C' 31
Contents continued...
SU KKAWAIA- aTTACH8.gpw
IDF Report 32
t d
X
Hydrograph
type
(origin)
Inflow
Peak Outflow (cfs)
Hydrograph
description
Hyd(s)
1 -Yr
2 -Yr
3-Yr
5-Yr
10 -Yr
26-Yr
50 -Yr
100-Yr
1
Rational
--
4.193
- - --
5.047
5.665
6.470
7.314
7.377
Lot 1 - Yr 2012
—
2
Rational
----
4.006
----
4.823
5.413
8.183
6.989
7.049
Lot 2 - Projected
—
3
Rational
- --
- --
3.581
---- --
4.321
4.875
5.580
6.322
6.391
Lot 3 - Projected
4
Rational
--
0.367
—
0.442
0.496
0.566
0.640
0.645
Area 'C'
—
Proj. file: SUKKAWALA- aTTACH8.gpw
Tuesday, Jan 17, 2012
Hydrograph Return Period Recap
1
Hydraflow Hydrographs by Intelisolve v9.22
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
description
1
Rational
4.193
1
10
2,516
—
--
--
Lot 1 - Yr 2012
2
Rational
4.006
1
10
2,404
--
--
--
Lot 2 - Projected
3
Rational
3.581
1
15
3,223
--
- --
--
Lot 3 - Projected
4
Rational
0.367
1
10
220
--
--
--
Area 'C'
SUKKAWALA- aTTACH8.gpw
Retum Period: 2 Year
Tuesday, Jan 17, 2012
Hydrograph Summary Report
2
Hydraflow Hydrographs by Iitelisolve v9.22
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v8.22
Hyd. No. 1
Lot 1 - Yr 2012
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q(cfs)
5.00
4.00
3.00
2.00
1.00
0.00
0
2
Hyd No. 1
= Rational
= 2 yrs
= 1 min
= 0.810 ac
= 6.390 in/hr
= Brazos County
Rainfall- TxDOT.IDF
Lot 1 - Yr 2012
Hyd. No. 1 — 2 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
= 4.193 cfs
= 10 min
= 2,516 cult
= 0.81
= 10.00 min
= 1/1
3
Tuesday, Jan 17, 2012
Q(cfs)
5.00
4.00
3.00
2.00
1.00
0.00
4 6 8 10 12 14 16 18 20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v922
Hyd. No. 2
Lot 2 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q(cfs)
5.00
4.00
3.00
2.00
1.00
0.00
0
2
Hyd No. 2
= Rational
= 2 yrs
= 1 min
= 0.774ac
= 6.390 in/hr
= Brazos County Rainfall - TxDOT.IDF
Lot 2 - Projected
Hyd. No. 2 — 2 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
= 4.006 cfs
= 10 min
= 2,404 tuft
= 0.81
= 10.00 min
= 1/1
4
Tuesday, Jan 17, 2012
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00
4 6 8 10 12 14 16 18 20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 3
Lot 3 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
4.00
3.00
2.00
1.00
0.00
Hyd No. 3
= Rational
= 2 yrs
= 1 min
= 1.111 ac
= 5.283 in/hr
= Brazos County Rainfall- TxDOT.IDF
Lot 3 - Projected
Hyd. No. 3 — 2 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
0 2 4 6 8 10 12 14 16 18 20 22 24 26
= 3.581 cfs
= 15 min
= 3,223 cult
= 0.61
= 15.00 min
= 1/1
5
Tuesday, Jan 17, 2012
Q (cfs)
4.00
3.00
2.00
1.00
0.00
28 30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 4
Area 'C'
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
0
2
Hyd No. 4
= Rational
= 2 yrs
= 1 min
= 0.164 ac
= 6.390 in/hr
= Brazos County
Rainfall- TxDOT.IDF
Area 'C'
Hyd. No. 4 — 2 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
6
Tuesday, Jan 17, 2012
= 0.367 cfs
= 10 min
= 220 cuft
= 0.35
= 10.00 min
= 1/1
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
4 6 8 10 12 14 16 18 20
Time (min)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuff)
Hydrograph
description
1
2
3
4
Rational
Rational
Rational
Rational
5.047
4.823
4.321
0.442
1
1
1
1
10
10
15
10
3,028
2,894
3,889
265
--
--
--
--
- --
- --
--
--
- --
--
- --
- --
Lot 1 - Yr 2012
Lot 2 - Projected
Lot 3 - Projected
Area 'C'
SUKKAWALA- aTTACH8.gpw
Return Period: 5 Year
Tuesday, Jan 17, 2012
Hydrograph Summary Report
7
Hydraflow Hydrographs by Intelisolve v9.22
Hydrograph Report
Hydraflow Hydrographs by IntelisoWe v9.22
Hyd. No. 1
Lot 1 - Yr 2012
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0
2
Hyd No. 1
= Rational
= 5 yrs
= 1 min
= 0.810 ac
= 7.693 in/hr
= Brazos County
4
6
Rainfall- TxDOT.IDF
8
Lot 1 - Yr 2012
Hyd. No. 1 — 5 Year
10
12
Peak discharge = 5.047 cfs
Time to peak = 10 min
Hyd. volume = 3,028 cuft
Runoff coeff. = 0.81
Tc by User = 10.00 min
Asc/Rec limb fact = 1/1
14
16
18
8
Tuesday, Jan 17, 2012
Q(cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00
20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisoke v9.22
Hyd. No. 2
Lot 2 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00
/
0
2
Hyd No. 2
= Rational
= 5 yrs
= 1 min
= 0.774 ac
= 7.693 in/hr
= Brazos County Rainfall - TxDOT.IDF
Lot 2 - Projected
Hyd. No. 2 — 5 Year
Peak discharge = 4.823 cfs
Time to peak = 10 min
Hyd. volume = 2,894 cult
Runoff coeff. = 0.81
Tc by User = 10.00 min
ASGRec limb fact = 1/1
9
Tuesday, Jan 17, 2012
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00
4 6 8 10 12 14 16 18 20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 3
Lot 3 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00
= Rational
= 5 yrs
= 1 min
= 1.111 ac
= 6.376 in/hr
= Brazos County Rainfall - TxDOT.IDF
Lot 3 - Projected
Hyd. No. 3 — 5 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
Tuesday, Jan 17, 2012
= 4.321 cfs
= 15 min
= 3,889 cult
= 0.61
= 15.00 min
= 1/1
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28
Hyd No. 3
10
Q(cfe)
5.00
4.00
3.00
2.00
1.00
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 4
Area 'C'
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
Hyd No. 4
= Rational
= 5 yrs
= 1 min
= 0.164 ac
= 7.693 in/hr
= Brazos County
Rainfall- TxDOT.I DF
Area 'C'
Hyd. No. 4 — 5 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
11
Tuesday, Jan 17, 2012
= 0.442 cfs
= 10 min
= 265 cult
= 0.35
= 10.00 min
= 1/1
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
0 2 4 6 8 10 12 14 16 18 20
Time (min)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cuft)
inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
description
1
Rational
5.665
1
10
3,399
--
- --
--
Lot 1 - Yr 2012
2
Rational
5.413
1
10
3,248
--
--
--
Lot 2 - Projected
3
Rational
4.875
1
15
4,388
--
- --
- --
Lot 3 - Projected
4
Rational
0.496
1
10
297
--
--
--
Area 'C'
SUKKAWALA- aTTACH8.gpw
Retum Period: 10 Year
Tuesday, Jan 17, 2012
Hydrograph Summary Report
12
Hydraflow Hydrographs by Intelisolve v9.22
Hydrograph Report
Hydraflow Hydropraphs by IntelisoWe v9.22
Hyd. No. 1
Lot 1 - Yr 2012
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00
Hyd No. 1
= Rational
= 10 yrs
= 1 min
= 0.810 ac
= 8.635 in/hr
= Brazos County
Rainfall- TxDOT.IDF
Lot 1 - Yr 2012
Hyd. No. 1 —10 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
= 5.665 cfs
= 10 min
= 3,399 cult
= 0.81
= 10.00 min
= 1/1
13
Tuesday, Jan 17, 2012
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0 2 4 6 8 10 12 14 16 18 20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 2
Lot 2 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
(cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00
Hyd No. 2
= Rational
= 10 yrs
= 1 min
= 0.774ac
= 8.635 in/hr
= Brazos County Rainfall - TxDOT.IDF
Lot 2 - Projected
Hyd. No. 2 —10 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
14
Tuesday, Jan 17, 2012
= 5.413 cfs
= 10 min
= 3,248 cuft
= 0.81
= 10.00 min
= 1/1
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0 2 4 6 8 10 12 14 16 18 20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 3
Lot 3 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00
0
2
4
Hyd No. 3
= Rational
= 10 yrs
= 1 min
= 1.111 ac
= 7.194 in/hr
= Brazos County Rainfall - TxDOT.IDF
6
8
10
Lot 3 - Projected
Hyd. No. 3 —10 Year
12
14
16
18
20 22
24
15
Tuesday, Jan 17, 2012
Peak discharge = 4.875 cfs
Time to peak = 15 min
Hyd. volume = 4,388 cult
Runoff coeff. = 0.61
Tc by User = 15.00 min
Asc/Rec limb fact = 1/1
26 28
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 4
Area 'C'
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
0
2
Hyd No. 4
= Rational
= 10 yrs
= 1 min
= 0.164 ac
= 8.635 in/hr
= Brazos County
Rainfall- TxDOT.IDF
Area 'C'
Hyd. No. 4 —10 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
16
Tuesday, Jan 17, 2012
= 0.496 cfs
= 10 min
= 297 cult
= 0.35
= 10.00 min
= 1/1
/
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
4 6 8 10 12 14 16 18 20
Time (min)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cut)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cult)
Hydrograph
description
1
Rational
6.470
1
10
3,882
--
--
--
Lot 1 - Yr 2012
2
Rational
6.183
1
10
3,710
--
--
--
Lot 2 - Projected
3
Rational
5.580
1
15
5,022
--
- --
—
Lot 3 - Projected
4
Rational
0.566
1
10
340
--
- --
- --
Area 'C'
SUKKAWALA- aTTACH8.gpw
Return Period: 25 Year
Tuesday, Jan 17, 2012
Hydrograph Summary Report
17
Hydraflow Hydrographs by Intelisolve v9.22
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No, 1
Lot 1 - Yr 2012
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
•
0
2
Hyd No. 1
= Rational
= 25 yrs
= 1 min
= 0.810 ac
= 9.861 in/hr
= Brazos County Rainfall- TxDOT.IDF
4
Lot 1 - Yr 2012
Hyd. No. 1 — 25 Year
18
Tuesday, Jan 17, 2012
Peak discharge = 6.470 cfs
Time to peak = 10 min
Hyd. volume = 3,882 cuft
Runoff coeff. = 0.81
Tc by User = 10.00 min
Asc/Rec limb fact = 1/1
Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
8 10 12 14 16 18 20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 2
Lot 2 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q(cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
= Rational
= 25 yrs
= 1 min
= 0.774 ac
= 9.861 in/hr
= Brazos County Rainfall- TxDOT.IDF
Lot 2 - Projected
Hyd. No. 2 -- 25 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
Tuesday, Jan 17, 2012
= 6.183 cfs
= 10 min
= 3,710 cult
= 0.81
= 10.00 min
= 1/1
Hyd No. 2
19
Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0 0.00
0 2 4 6 8 10 12 14 16 18 20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by IntollsoNe v9.22
Hyd. No. 3
Lot 3 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00
Hyd No. 3
= Rational
= 25 yrs
= 1 min
= 1.111 ac
= 8.234 in/hr
= Brazos County Rainfall- TxDOT.IDF
Lot 3 - Projected
Hyd. No. 3 — 25 Year
Tuesday, Jan 17, 2012
0 2 4 6 8 10 12 14 16 18 20 22 24
Peak discharge = 5.580 cfs
Time to peak = 15 min
Hyd. volume = 5,022 cuft
Runoff coeff. = 0.61
Tc by User = 15.00 min
ASGRec limb fact = 1/1
26 28
20
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 4
Area 'C'
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0
Hyd No. 4
= Rational
= 25 yrs
= 1 min
= 0.164 ac
= 9.861 in/hr
= Brazos County
Rainfall- TxDOT. I DF
Area 'C'
Hyd. No. 4 — 25 Year
Peak discharge = 0.566 cfs
Time to peak = 10 min
Hyd. volume = 340 cuft
Runoff coeff. = 0.35
Tc by User = 10.00 min
Asc/Rec limb fact = 1/1
21
Tuesday, Jan 17, 2012
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
2 4 6 8 10 12 14 16 18 20
Time (min)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cult)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cult)
Hydrograph
description
1
Rational
7.314
1
10
4,388
--
- --
----
Lot 1 - Yr 2012
2
Rational
8.989
1
10
4,193
--
- --
- --
Lot 2 - Projected
3
Rational
6.322
1
15
5,689
--
- --
--
Lot 3 - Projected
4
Rational
0.840
1
10
384
--
--
Area 'C'
---
SUKKAWALA- aTTACH8.gpw
Return Period: 50 Year
Tuesday, Jan 17, 2012
Hydrograph Summary Report
22
Hydraflow Hydrographs by Intelisolve v9.22
Hydrograph Report
Hydraflow Hydrographs by IntelisoWo v9.22
Hyd. No. 1
Lot 1 - Yr 2012
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
8.00
6.00
4.00
2.00
0.00
0
2
Hyd No. 1
= Rational
= 50 yrs
= 1 min
= 0.810 ac
= 11.148 in/hr
= Brazos County
4
6
Rainfall- TxDOT.I DF
Lot 1 - Yr 2012
Hyd. No. 1 — 50 Year
8
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
= 7.314 cfs
= 10 min
= 4,388 cult
= 0.81
= 10.00 min
= 1/1
23
Tuesday, Jan 17, 2012
Q(cfs)
8.00
6.00
4.00
2.00
0.00
10 12 14 16 18 20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 2
Lot 2 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
= Rational
= 50 yrs
= 1 min
= 0.774 ac
= 11.148 in/hr
= Brazos County Rainfall - TxDOT.IDF
Lot 2 - Projected
Hyd. No. 2 — 50 Year
Tuesday, Jan 17, 2012
Peak discharge = 6.989 cfs
Time to peak = 10 min
Hyd. volume = 4,193 cult
Runoff coeff. = 0.81
Tc by User = 10.00 min
Asc/Rec limb fact = 1/1
Hyd No. 2
24
Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0 2 4 6 8 10 12 14 16 18 20
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 3
Lot 3 - Projected
Hydrograph type = Rational
Storm frequency = 50 yrs
Time interval = 1 min
Drainage area = 1.111 ac
Intensity = 9.328 in/hr
IDF Curve = Brazos County Rainfall - TxDOT.IDF
Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.
0
2
4
Hyd No. 3
6
8
10
Lot 3 - Projected
Hyd. No. 3 -- 50 Year
12
14
16
18
Tuesday, Jan 17, 2012
Peak discharge = 6.322 cfs
Time to peak = 15 min
Hyd. volume = 5,689 cult
Runoff coeff. = 0.61
Tc by User = 15.00 min
Asc/Rec limb fact = 1/1
20 22
24
26 28
25
Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 4
Area 'C'
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q(cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0
Hyd No. 4
= Rational
= 50 yrs
= 1 min
= 0.164 ac
= 11.148 in/hr
= Brazos County
Rainfall- TxDOT.I DF
Area 'C'
Hyd. No. 4 — 50 Year
Peak discharge = 0.640 cfs
Time to peak = 10 min
Hyd. volume = 384 cuft
Runoff coeff. = 0.35
Tc by User = 10.00 min
Asc/Rec limb fact = 1/1
26
Tuesday, Jan 17, 2012
Q(cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
2 4 6 8 10 12 14 16 18 20
Time (min)
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Hyd.
volume
(cult)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuff)
Hydrograph
description
1
Rational
7.377
1
10
4,426
--
- --
- --
Lot 1 - Yr 2012
2
Rational
7.049
1
10
4,229
--
- --
- --
Lot 2 - Projected
3
Rational
6.391
1
15
5,752
--
- --
--
Lot 3 - Projected
4
Rational
0.645
1
10
387
--
--
Area 'C'
—
SUKKAWALA- aTTACH8.gpw
Retum Period: 100 Year
Tuesday, Jan 17, 2012
Hydrograph Summary Report
27
Hydraflow Hydrographs by Intelisolve v9.22
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 1
Lot 1 - Yr 2012
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
8.00
6.00
4.00
2.00
0.00
0.00
0 2 4 6 8 10 12 14 16 18 20
Time (min)
Hyd No. 1
= Rational
= 100 yrs
= 1 min
= 0.810 ac
= 11.243 in/hr
= Brazos County
Rainfall- TxDOT.IDF
Lot 1 - Yr 2012
Hyd. No. 1 —100 Year
28
Tuesday, Jan 17, 2012
Peak discharge = 7.377 cfs
Time to peak = 10 min
Hyd. volume = 4,426 cuft
Runoff coeff. = 0.81
Tc by User = 10.00 min
Asc/Rec limb fact = 1/1
Q (cfs)
8.00
6.00
4.00
2.00
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 2
Lot 2 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q(cfs)
8.00
6.00
4.00
2.00
0.00
0.00
0 2 4 6 8 10 12 14 16 18 20
Time (min)
Hyd No. 2
= Rational
= 100 yrs
= 1 min
= 0.774 ac
= 11.243 in/hr
= Brazos County Rainfall- TxDOT.IDF
Lot 2 - Projected
Hyd. No. 2 —100 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
29
Tuesday, Jan 17, 2012
= 7.049 cfs
= 10 min
= 4,229 cult
= 0.81
= 10.00 min
= 1/1
Q (cfs)
8.00
6.00
4.00
2.00
Hydrograph Report
Hydraflow Hydrographs by Intelisolve v9.22
Hyd. No. 3
Lot 3 - Projected
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
IDF Curve
Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0
2
4
Hyd No. 3
= Rational
= 100 yrs
= 1 min
= 1.111 ac
= 9.431 in/hr
= Brazos County Rainfall- TxDOT.IDF
6
8
10
Lot 3 - Projected
Hyd. No. 3 --100 Year
12
14
16
18
Tuesday, Jan 17, 2012
Peak discharge = 6.391 cfs
Time to peak = 15 min
Hyd. volume = 5,752 cuft
Runoff coeff. = 0.61
Tc by User = 15.00 min
Asc/Rec limb fact = 1/1
20
22 24
26 28
30
Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
30
Time (min)
Hydrograph Report
Hydraflow Hydrographs by Intefsolve v9.22
Hyd. No. 4
Area 'C'
Hydrograph type
Storm frequency
Time interval
Drainage area
Intensity
OF Curve
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0
Hyd No. 4
= Rational
= 100 yrs
= 1 min
= 0.164 ac
= 11.243 in/hr
= Brazos County
Rainfall - TxDOT. I DF
Area 'C'
Hyd. No. 4 —100 Year
Peak discharge
Time to peak
Hyd. volume
Runoff coeff.
Tc by User
Asc/Rec limb fact
= 0.645 cfs
= 10 min
= 387 cult
= 0.35
= 10.00 min
= 1/1
31
Tuesday, Jan 17, 2012
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
2 4 6 8 10 12 14 16 18 20
Time (min)
Return
Period
Intensity Values (in/hr)
1 -yr
2-yr
3 -yr
5-yr
10-yr
25-yr
50 -yr
100 -yr
SCS 24 -hour
0.00
4.50
0.00
(Yrs)
6 min
10
16
20
25
30
35
40
45
60
56
60
1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2
8.21
6.39
5.28
4.53
3119
3.57
3.24
2.97
2.75
2.56
2.40
2.26
3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
9.85
7.89
6.38
5.48
4.83
4.33
3.93
3.61
3.34
3.12
2.92
2.75
10
10.98
8.63
7.19
6.21
5.49
4.94
4.50
4.14
3.84
3.59
3.37
3.18
25
12.51
9.86
8.23
7.12
6.30
5.67
5.18
4.77
4.43
4.14
3.89
3.68
50
14.10
11.15
9.33
8.08
7.16
8.46
5.90
5.44
5.05
4.73
4.45
4.20
100
14.17
11.24
9.43
8.18
7.27
6.56
6.00
5.54
5.15
4.82
4.54
4.30
Storm
Distribution
Rainfall Precipitation Table (in)
1 -yr
2-yr
3 -yr
5-yr
10-yr
25-yr
50 -yr
100 -yr
SCS 24 -hour
0.00
4.50
0.00
6.20
7.40
8.40
9.80
11.00
SCS 6-Hr
0.00
3.33
0.00
0.00
0.00
0.00
0.00
7.90
Huff -1st
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Huff -2nd
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Huff -3rd
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Huff -4th
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Huff -Indy
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Custom
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Return
Period
Intensity-Duration- Frequency Equation Coefficients (FHA)
B
0
E
(N/A)
o 2or22222
0.0000
0.0000
- --
8.5000
0.7950
--
0.0000
0.0000
- --
5
8.5000
0.7850
10
8.5000
0.7630
- - --
25
8.5000
0.7540
- --
50
8.5000
0.7450
- --
100
8.5000
0.7350
- --
Hydraflow Rainfall Report
Hydraflow aphs by Intelisolve v9.22 Tuesday, Jan 17, 2012
File name: Brazos County Rainfall - TxDOT.IDF
Intensity = B / (Tc + D)AE
Tc = time in minutes. Values may exceed 60.
Precip. file name: Brazos County Rainfall.
32