Loading...
HomeMy WebLinkAboutCopy of SP Application (10-02)CITY Of COLLEGE STATION Home ofTexasA6M University' Oglg Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ISIp Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Notice of Intent (NOI) if disturbed area is greater than five (5) acres cumulatively. Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). I Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of approval (if applicable). The attached Site Plan Non - Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. El El MINIMUM SUBMITTAL REQUIREMENTS: $668 Site Plan Application Fee. $250 Non - Residential Architectural Standards Building Review Application Fee (if applicable). $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 0.75% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Fourteen (14) folded copies of site plan. One (1) folded copy of the landscape plan. One (1) copy of the following for Non - Residential Architectural Standards building review or Northgate Building Review (if applicable). Building elevations for all buildings. A list of building materials for all facade and screening. Color samples for all buildings or list colors to be used from the approved color palette. El Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT Valley Park Center Phase 2 ADDRESS LEGAL DESCRIPTION (Lot, Block, Subdivision) Valley Park Center Phase 2, APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Steve Duncan E -mail sduncan ©jonescartercom Street Address City Bryan Phone Number PROPERTY OWNER'S INFORMATION: Name Titan Valley Park, Limited Partnership E -mail dhillman ©southcorprealty.com Street Address C/O Southcorp Realty Advisors, Inc., 3401 Allen Parkway, Suite 200 City Houston State Tx Zip Code 77019 Phone Number (713) 960 -1880 10/09 1716 Briarcrest Drive, Suite 160 (979) 731 -8000 SITE PLAN APPLICATION GENERAL FOR OFFICE E Ob CASE NO.: rr�� DATE SUBMITTED: TIME: ` LQ STAFF: State Tx Zip Code 77802 Fax Number ( 846 -2893 Fax Number (713) 355 -4275 Page 1 of 9 ARCHITECT OR ENGINEER'S INFORMATION: Name same as applicant Street Address City State Zip Code Phone Number Fax Number OTHER CONTACTS (Please specify type of contact): Name Derek Walton Street Address Same as applicant State City Phone Number Current zoning C -1 Present use of property Vacant Land Proposed use of property Commercial office Number of parking spaces required 100 Number of parking spaces proposed 100 Fax Number Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? 10/09 MULTI - FAMILY RESIDENTIAL Total Acreage Floodplain Acreage Housing Units # of 1 Bedroom Units # of 2 Bedroom Units # of 3 Bedroom Units # of 4 Bedroom Units FOR 2 BEDROOM UNITS ONLY # Bedrooms = 132 sq. ft. # Bedrooms < 132 sq. ft. PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) # of Multi - Family Dwelling Units X $1646 = $ # of acres in floodplain # of acres in detention # of acres in greenways Date dedication approved by Parks & Recreation Advisory Board COMMERCIAL Total Acreage 2.240 Building Square Feet 25000 Floodplain Acreage 0 * Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. / /rf Signature an:`itle gvL G 17414 ru N Date f L 7 / 4 E -mail E -mail dwalton @jonescarter.com Zip Code r Yes (X No Page 2 of 9 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no work is commenced within 24 months of issuance. 6. Applicant is hereby informed that other permits may be required to fulfill local, state, and federal regulator requirements. 7. Applicant hereby gives consent to the City representatives to make reasonable inspections required to verify compliance. 8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 9. I, THE OWNER, CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. 10/09 4, Property Owner(s) GENERAL PROVISIONS FOR DEVELOPMENT PERMIT ACKNOWLEDGMENTS (required for all development): Date ,s( (714 44 c , the owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. Property Owner(s) Date /47/ 2. 1, -1 j/ N //.[^ prior to construction. Property Owner(s) Date , certify that all necessary State and Federal permits will be obtained 3. I, ,A 1.4 (ir6 , the Owner, authorize release of plans to for bidding purposes only. I understand that final approval and release of plans for construction is contingent on contractor signature on approved Development Permit. Property Owner(s) Date Page 2 of 9 A. I, Steve E. Duncan , certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 -year storm. / '7/( -Y*------------ Engineer Date B. I, Steve E. Duncan , certify that the finished floor elevation of the lowest floor including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and map, as amended. 7/61 Engineer Date // C. I, Steve E. Duncan , certify that the alterations or development covered by this permit shall not diminish the flood - carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodway fringes. -- ' /0;7/4 _ Engineer Date /( D. I, Steve E. Duncan , certify that the proposed alterations do not raise the level of the 100 -year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. ,�°- -- ----- // 7,0 Engineer Date ENGINEERING CERTIFICATIONS (required for development in Special Flood Hazard Areas): 10/09 Conditions or comments as part of approval: Page 3 of 9