Loading...
HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and■ specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one -year warranty is hereby affirmed and agreed to by ELLIOTT CONSTRUCTION, LTD and by their subcontractors as indicated by signatures below. WORK COMPLETED WARRANTY DATE Fire Hydrant 11/1/2010 1,5" Service 8X6 Tap Sleeve & Valve RE: COMPLETION OF Valley Park Phase 2 11/1/2010 11 /1 /201D DATE: 11/01 /2010 ELLIOTT JOB NO. 648 Owner: CLLVP Phase II, LP Contractor: Elliott Construction, Ltd. Phone Number: 713 - 9 6 0 -118 0 Phone Number: (979) 69Q -7071 Address: 3401 Allen Pkwy Address: P.O. Box 510 Suite 200 Wellborn. TX 7788I Houston, Texas 19 Signature: -- Signature: ��� , a vJ0024.) P dl PLAT PILED worm guns sum TEMP NO NOT OME NEEDED Illegible or i>womp r rtsw `n #0-Pp Backflow Assembly Information Please Print Serial Number://,„?</O // Manufacturer: lcde Model: T_ Size: Type of Assembly: ❑ RP cieDCA ❑ PVB ❑ RP D ❑ DCA -D ❑ SRPVB Resident / Business Name: A/b t 4r ki kiv7'Ar Physical Address: f Assembly location on the property: />i wa..4 rlz4.r Reason the assembly is installed: Fireline: ❑ Domestic: 0 Irrigation:] 1 Other: Is the assembly recommendations Initial Test installed in accordance and/or local 4 Rg . `�, .,,t "E ivti �..3+ •-- - e §��'.2 -- with manufacturer codes? S .d� x 1�f.. ,cif `3:_s`'d Ed Yes ❑ No _ t. va F Pj , '" "Pr R lief Val e -1 Opened at . PSID 1 s ` Check Held at ,2 ' 2 Check Held at 2. Opened at PSID Did Not Open ❑ Held at PSID Leaked ❑ PSID Closed Tight '= Leaked ❑ PSID Closed Tight liL Leaked ❑ Did Not Open ❑ Repairs and material used ,_ te -_ -_ � : 3 _� s � -� - ,_ 1 { - ._ f . � ' Test After Repairs Held at Held at Opened at - PSI Opened at PSI Held at PSI PSID PSID Closed Tight ❑ Closed Tight ❑ The backflow prevention assembly listed has been tested and maintained by TCEQ Regulations and is certified to be operating .tees ❑ No within acceptable parameters. Forward This Original Report Upon completion to: College Station Utilities Backflow Prevention Public Water System ID: 0210002 P.O. Box 9960 College Station, TX 77842 U College Station Utilities Reliable, Affordable, Community Owned Backflow Prevention Assembly Test and Maintenance Report I certify that all information on this report is true and correct at the time of testing. Gauge Test Date: </ • 1d Gauge Serial #: 4' 3g''7 G/ ) Firm Name: ,le- i on J .4 Firm Address: /Z4R4,,ei ("ro % l Firm Phone Number: ( ) l') - /pig Date: o7 / // / // Signature: Gauge Model: /2>rk/ Certification #: 1 / Date Backflow Technician: PLEASE PRINT Date Time 8:45 A.M. Test completed by Justin Tamplin Witness Vincent Rodriquez Location Valley Park Ph. 2 Nozzle size 2.5 Flow hydrant 0 -139 Pitot reading 47 G.P.M. 1160 Static hydrant 0 -106 Static PSI 87 Residual PSI 82 Comments For Initial af College station Utilities Reliable, Affordable, Community Owned Tuesday January 25, 2011 ESTIMATE OF PROBABLE COSTS VALLEY PARK CENTER, PHASE 2, COLLEGE STATION, TX JC JOB NO.: 0009 -011 April 8, 2010 ITEM NO. ESTIMATED QUANTITY DESCRIPTION UNIT PRICE AMOUNT GENERAL 1 1 LS General Overhead for all Work Including Mobilization, Bonds, Insurance, Traffic Control, Construction Layout, Erosion Control, and Related Items $ 2,800.00 $ 2,800.00 FIRE LINE SUB -TOTAL GENERAL $ 2,800.00 2 15 LF 6" Water Line, AWWA C900 Class 200 PVC with Detector Tape and Tracer Wire in Trench, cement stabilized sand backfill $ 165.00 $ 2,475.00 3 1 EA 6" DI 22 BENDS $ 285.00 $ 285.00 4 1 EA 8 "x6" Tapping Sleeve and Valve $ 2,000.00 $ 2,000.00 5 1 EA 6" Isolation Valve and Box $ 700.00 $ 700.00 6 50 SF Sawcut, Repair, and Replace Existing Asphalt Pavement $ 12.00 $ 600.00 7 15 LF Trench Safety System for Water Line $ 5.00 $ 75.00 FIRE HYDRANT SUB -TOTAL FIRE LINE $ 6,135.00 8 1 EA Fire Hydrant Assembly with Lead, Gate Valve, and Box $ 2,800.00 $ 2,800.00 9 1 EA 8" x 6" DI TEE $ 275.00 $ 275.00 10 1 EA 6" DI 90 BEND $ 225.00 $ 225.00 SUB -TOTAL FIRE HYDRANT $ 3,300.00 t0 4 ,9 (o • tb 4 :40 ESTIMATE TOTAL $ 12,235.00 ESTIMATE OF PROBABLE COST PAGE 1 OF 1 PLANS DATED 04/05/2010 S S � E OF T E,`, '9S+I It * I, , , 83252 •• : i • i • / l � 0 • • 4!CE NS I 9 r STEVE E. DUNCAN tters of Completion SOP: Filing of Final Plats - Engineering Inspector /Date: Project Engineer /Date: DP Nurnia<r) - Inspectors shall acquire written (i.e. email) punchlist comments and subsequently written confirmation from the following contacts before forwarding Letter of Completion to development review engineer: sew 2 PO/ /16 / 10/01/10 ,d osion /Drainage: Donnie Willis (0: 764 -6375, C: 229 -7632) S Water Services - General: Charles "Butch" Willis (0: 764 -3435, C: 777 -1202) • Water - coordinate fire flow analyses (or the design engineer for non -city utilities) and confirm test results meets min requirements with the dev review engineer (specific hydrants to test, if simultaneous, and min allowable flow) • Sanitary 1.11 CS Water Service — Liftstation: Doug Wallace (0: 764 -6333) S Electric and Streetlights: Gilbert Martinez (0: 764 -6255) it BTU Electric and Streetlights: Sonia Creda (0: 821 -5770) d X111 John Fontinoe or Randy Trimble (0: 821 -5728) nfirm with development review engineer that service agreement is in place with BTU on -City Utility Service Providers: (Wellborn Water SUD, Brushy Creek SUD, Wickson Creek SUD, etc) confirm with development review engineer that infrastructure is complete and for outstanding issues, o Di ital Constrution Pictures: From contractor on CD -R, Inspector to confirm and file Record Drawings: (2 Red -Lined Copies) for all Public Infrastructure with the following attestation: "I, , General Contractor for development, certify that the improvements shown on this sheet were actually built, and that said improvements are shown substantially hereon. I hereby certify that to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any are stated correctly hereon." General Contractor L.,,p-- Drawings: (2 Red -Lined Copies) for Public Drainage Infrastructure including Private Detention Facilities with the following attestations: "I hereby attest that I am familiar with the approved drainage plan and associated construction drawings and furthermore, attest that the drainage facilities have been constructed within dimensional tolerances prescribed by the Bryan & College station Unified Stormwater Design Guidelines and in accordance with the approved construction plans or amendments thereto approved by the City of College Station." (affix seal) Licensed Professional Engineer State of Texas No. "I certify that the subdivision improvements shown on this sheet were actually built, and that said improvements are substantially as shown hereon. I further certify, to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any, are stated correctly hereon." General Contractor Inspectors to review Red -lined Record Drawings, upon acceptable confirmation of drawings, inspector to: - Inspectors should forward Letters of Completion to the development review engineer that reviewed and stamped the construction plans after confirming: o the date on the Letter of Completion Warranty should reflect the date when all associated punchlist items are completed, and o the Owner is shall be listed as the one affirming the one -year warranty Development review engineer to: . Deborah Grace - Rosier (Planning) to file the Final Plat utilizes a coversheet to confirm: o infrastructure is accepted by Letter of Completion —or- Surety is provided and acceptable, o signed and notarized mylar of final plat, o parkland dedication has been paid, o digital file of final plat is provided, a current paid tax certificate has been submitted, and o file one set of Record Drawings in Public Works files, and o forward one set of Record Drawings to Jeffery Speed (CSU) o Add Dev Permit Number to Letter of Completion o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar is ready to be filed), all necessary easements (including offsite) have been filed, and blanket easement issues are resolved, and o initial and route the Final Plat mylar for filing. (Note if the developer provided surety the plat it may have been filed ahead of construction.) Development review engineer, upon the filing of Final Plat, stamp the Letter of Completion with the new stamp and verify- initial -n /a the Final Plat was filed, offsite easements have been filed, we have all necessary easements, etc - and then forward the Letter of Completion to Alan Gibbs (City Engineer) for final signature. - Carol (Sr. Asst. City Engineer) to: o enter the engineer's estimate and Letter of Completion date into Inspection List o forward hard original of finalized Letter of Completion to Mandi Alford (P &DS). - Mandi to: verify o signatures on the Letter of Completion, o forward scanned copy of Letter of Completion and associated Engineers Estimate to the owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Janet Dudding (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Diane Broadhurst (CSU), Charles "Butch" Willis (CSU), Sue Hosea (CSU), Carol Cotter (Engineering), Alan Gibbs (Engineering) and Deborah Grace - Rosier (Planning), o if don't have email addresses, mail copies to the owner and contractor, and o place the original in Development Permit file. - Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file.