HomeMy WebLinkAboutBond Information PEBBLE CREEK
January 6, 2010
City of College Station
Attention: Deborah Grace
Post Office Box 9960
1101 Texas Avenue
College Station, TX 77842 -9960
Dear Ms. Grace,
Please find enclosed a check from the Pebble Creek Development Company, for a total of Two
Thousand Six Hundred Twenty -Eight and No /100 ($2,628.00). These funds are good for 180
days and draws under check must relate to expenses incurred on Pebble Creek Center Phase 1,
Lot 1, Block 1 for the following reasons:
• The sidewalk on Lakeway Dr.
Following is the "Engineer's Opinion of Probable Cost" for Phase 1 from McClure & Browne
Engineering /Surveying , Inc:
Item Description Unit Quantity Unit Price Amount
(1) 4" Reinforced Concrete Sidewalk S.F. 657 $400.00 $2,628.00
Stamped Engineer's Estimate is attached Total Cost $2,628.00
Please accept this check by Pebble Creek Development Company for sidewalk guarantee on
work to be performed in Pebble Creek Center Phase 1, Lot 1, Block 1.
Sincerely,
PEBBLE CREEK DEVELOPMENT COMPANY
Q.A.t%
Davis M. Young
President
.. . _ . .. -6 0 -0996
M �
PEBBLE CREEK CENTER SIDEWALK
MBESI PROJ #: 1065-0009
Engineer's Opinion of Probable Construction Costs
August 3, 2009
Item # Description Unit Quantity Unit Price I Total
Paving Construction
1 4" Reinforced Concrete Sidewalk 1 S.F. 6571 4.00 2,628
Paving Subtotal $2,628
Total Construction Cost $2,628
The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This
estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor
or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During
construction, additional features may become apparent as the work progresses, which will result in an increase in cost.
' F- 1 ' g d 'I l
..
o *: ' b `• *
i JEFFERY L. ROBERTSON
•
-0 94745 :cc
'f 90 < / L'ENSeO •:
khdONAL
1 of 2
Page l of 1
61MCL 6tiega{
Brittany Caldwell - Re: Refund for Pebble Creek
From: Erika Bridges NI
To: Caldwell, Brittany
Date: 2/28/2012 11:09 AM
Subject: Re: Refund for Pebble Creek
Brittany,
We have a Letter of Completion for the sidewalk along Lakeway required for the Pebble Creek Center final plat.
At this time we can issue a refund of the surety for the sidewalk.
Please let me know if you have any questions.
Thanks,
Erika
t f`LC�:� iy l
Erika Bridges, EIT, CFM 1t1 kd\ C X- C t s' < A �7 g
i t
Graduate Civil Engineer
Department of Public Works
1101 Texas Ave.
College Station, TX 77842
Phone: 979.764.3570
Fax: 979.764.3496
ebridges
* * * * * * * * * * * * * * * * * * **
City of College Station
Home of Texas A &M University
»> Brittany Caldwell 2/28/2012 10:34 AM »>
Can you send me an email stating that we need to refund the money for the sidewalk on Lakeway Drive? I just
want to have some sort of documentation to put in the file.
file: / /C: \Documents and Settings \bcaldwell \Local Settings \Temp \XPgrpwise \4F4CB5EBCi... 2/28/2012