Loading...
HomeMy WebLinkAboutBond Information PEBBLE CREEK January 6, 2010 City of College Station Attention: Deborah Grace Post Office Box 9960 1101 Texas Avenue College Station, TX 77842 -9960 Dear Ms. Grace, Please find enclosed a check from the Pebble Creek Development Company, for a total of Two Thousand Six Hundred Twenty -Eight and No /100 ($2,628.00). These funds are good for 180 days and draws under check must relate to expenses incurred on Pebble Creek Center Phase 1, Lot 1, Block 1 for the following reasons: • The sidewalk on Lakeway Dr. Following is the "Engineer's Opinion of Probable Cost" for Phase 1 from McClure & Browne Engineering /Surveying , Inc: Item Description Unit Quantity Unit Price Amount (1) 4" Reinforced Concrete Sidewalk S.F. 657 $400.00 $2,628.00 Stamped Engineer's Estimate is attached Total Cost $2,628.00 Please accept this check by Pebble Creek Development Company for sidewalk guarantee on work to be performed in Pebble Creek Center Phase 1, Lot 1, Block 1. Sincerely, PEBBLE CREEK DEVELOPMENT COMPANY Q.A.t% Davis M. Young President .. . _ . .. -6 0 -0996 M � PEBBLE CREEK CENTER SIDEWALK MBESI PROJ #: 1065-0009 Engineer's Opinion of Probable Construction Costs August 3, 2009 Item # Description Unit Quantity Unit Price I Total Paving Construction 1 4" Reinforced Concrete Sidewalk 1 S.F. 6571 4.00 2,628 Paving Subtotal $2,628 Total Construction Cost $2,628 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. ' F- 1 ' g d 'I l .. o *: ' b `• * i JEFFERY L. ROBERTSON • -0 94745 :cc 'f 90 < / L'ENSeO •: khdONAL 1 of 2 Page l of 1 61MCL 6tiega{ Brittany Caldwell - Re: Refund for Pebble Creek From: Erika Bridges NI To: Caldwell, Brittany Date: 2/28/2012 11:09 AM Subject: Re: Refund for Pebble Creek Brittany, We have a Letter of Completion for the sidewalk along Lakeway required for the Pebble Creek Center final plat. At this time we can issue a refund of the surety for the sidewalk. Please let me know if you have any questions. Thanks, Erika t f`LC�:� iy l Erika Bridges, EIT, CFM 1t1 kd\ C X- C t s' < A �7 g i t Graduate Civil Engineer Department of Public Works 1101 Texas Ave. College Station, TX 77842 Phone: 979.764.3570 Fax: 979.764.3496 ebridges * * * * * * * * * * * * * * * * * * ** City of College Station Home of Texas A &M University »> Brittany Caldwell 2/28/2012 10:34 AM »> Can you send me an email stating that we need to refund the money for the sidewalk on Lakeway Drive? I just want to have some sort of documentation to put in the file. file: / /C: \Documents and Settings \bcaldwell \Local Settings \Temp \XPgrpwise \4F4CB5EBCi... 2/28/2012