Loading...
HomeMy WebLinkAboutSTAFF REVIEW COMMENTS CITY OF COLLEGE STATION ` SERVICES 1 101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 21, 2003 TO: Alton Ofczarzak, Oakwood Custom Home Group, Ltd., Via fax 690.2504✓ FROM: Bridgette George, Assistant Development Manager SUBJECT: BRIDLE GATE ESTATES PH 2 (PP) - Preliminary Plat Staff reviewed the above - mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 27, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for November 6, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. $400 Preliminary Plat fee Ten (10) copies of the revised preliminary plat; and, One (1) Mylar original of the revised preliminary plat. One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart @ci.college - station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 764 -3570. Attachments: Staff review comments cc: Michael G. Hester, P.E., Via fax 693.1075` Case file #03- 00500256 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: BRIDLE GATE ESTATES PH 2 (PP) - 03- 00500256 ENGINEERING 1. The property is currently zoned R -6 High Density Multi- family. Single family detached homes are no longer a permitted use in this zoning district. The plat may proceed under the current zoning, but the zoning will have to be in place prior to the issuance of any single family building permit. 2. You may be able to skip the preliminary plat and go straight to final plat in this case. All preliminary plat information must be submitted to our office. 3. North should be facing up on the plan. 4. Please call out the 20' P.U.E. shown along the southeastern property line. Reviewed by: Spencer Thompson & Jennifer Prochazka Date: 10 -20 -03 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer provides 30' of rigid conduit for riser pole(s). Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the city). 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. Email to rbolin(a cstx.gov. 6. Developer provides load data for project. 7. Developer installs street lighting per city specs and design. 8. Developer provides temporary blanket easement for construction purposes. 9. Developer provides easements for electric infrastructure as installed for electric lines (including street lighting). 10. Developer needs to clear up easements across drive in phase 1, before service will be provided. Contact College Station Utilities. Reviewed by: Ronnie Bolin Date: 10 -21 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2