HomeMy WebLinkAboutEngineer's Cost Estimate-Sanitary SewerFebruary 9, 2011
Ms. Erika Bridges
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Re: Engineering Cost Estimate — Sanitary Sewer
Southside Plaza Phase 2
4081 State Highway 6 South
College Station, Texas
Gessner Engineering Job No.: 10 -0548
Dear Ms. Bridges:
Based on current estimations for direct material and direct labor costs, the prime
cost of the public infrastructure for the above referenced project is estimated to
be $15,423.00. Values used to determine this estimate are included in the
attached table. This estimate does not include indirect costs due to overhead or
indirect manufacturing expenses.
Please contact us if you have any questions or if we can be of further assistance.
Sincerely,
GESSNER ENGINEERING, LLC F -7451
L4yi
Melissa P. Thomas, P.E.
Attached: Estimated Cost Table
l;`P .OFT 1
* /\ •: *,
*: ,I
MELISSA P. THOMAS /
,� , 39
988 i
1 % S S�ONALS* j
Gessner
Engineering
2501 Ashford Drive
Suite 102
College Station, Texas 77840
P.O. Box 10763, 77842
979.680.8840
fax 979.680.8841
2204 S. Chappell Hill Street
Brenham, Texas 77833
979.836.6855
fax 979.836.6847
GE Job # : 10 -0548
Probable Estimate of Public Sitework Construction Costs
Southside Plaza Phase 2
Gessner Engineering, LLC
SANITARY - SEWER`
Item
Quantity Units
Unit Cost
Total
8" SDR 23.5 PVC SS
Trench Safety
4' SS MH
113
113
2
LF
LF
EA
70.00
1.00
$ 3,700.00
$ 7,910.00
$ 113.00
$ 7,400.00
Total Construction Cost
1 $ 15,423.00
G
Gessner Engineering