HomeMy WebLinkAboutEngineer's Cost EstimateFebruary 2, 2011 Ms. Erika Bridges City of College Station 1101 Texas Avenue College Station, Texas 77842 Re: Engineering Cost Estimate Southside Plaza Phase 2 4081 State Highway 6 South College Station, Texas Gessner Engineering Job No.: 10 -0548 Dear Ms. Bridges: Based on current estimations for direct material and direct labor costs, the prime cost of the public infrastructure for the above referenced project is estimated to be $42,813.00. Values used to determine this estimate are included in the attached table. This estimate does not include indirect costs due to overhead or indirect manufacturing expenses. Please contact us if you have any questions or if we can be of further assistance. Sincerely, GESSNER ENGINEERING, LLC F -7451 (e Melissa P. Thomas, P. Attached: Estimated Cost Table 4 F? . OF T F -4 ,*_: ,, ....d$ * • �0 G Gessner Engineering 2501 Ashford Drive Suite 102 College Station, Texas 77840 P.O. Box 10763, 77842 979.680.8840 fax 979.680.8841 2204 S. Chappell Hill Street Brenham, Texas 77833 979.836.6855 fax 979.836.6847 WATER '' Item Quantity Units Unit Cost Total 4" PVC Water 20 LF $ 32.00 $ 640.00 6" PVC Water 185 LF $ 45.00 $ 8,325.00 6" Gate Valve 2 EA $ 920.00 $ 1,840.00 4" Gate Valve 1 EA $ 600.00 $ 600.00 2" Blow -off Valve Assembly 1 EA $ 1,800.00 $ 1,800.00 18" x 18" x 6" Tapping Sleeve 1 EA $ 6,000.00 $ 6,000.00 Cast Iron Fittings 0.15 TON $ 5,200.00 $ 780.00 Pressure Testing and Disinfecting 1 LS $ 7,200.00 $ 7,200.00 Trench Safety 205 LF $ 1.00 $ 205.00 Sub Total - Water $ 27,390.00 SANITARY SE _ Item Quantity Units Unit Cost Total 8" SDR 23.5 PVC SS 113 LF $ 70.00 $ 7,910.00 Trench Safety 113 LF $ 1.00 $ 113.00 4' SS MH 2 EA $ 3,700.00 $ 7,400.00 Sub Total - Paving $ 15,423.00 Total Construction Cost 1 $ 42,813.00 GE Job # : 10 -0548 Probable Estimate of Public Sitework Construction Costs Southside Plaza Phase 2 Gessner Engineering, LLC G Gessner Engineering