HomeMy WebLinkAboutEngineer's Cost EstimateFebruary 2, 2011
Ms. Erika Bridges
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Re: Engineering Cost Estimate
Southside Plaza Phase 2
4081 State Highway 6 South
College Station, Texas
Gessner Engineering Job No.: 10 -0548
Dear Ms. Bridges:
Based on current estimations for direct material and direct labor costs, the prime
cost of the public infrastructure for the above referenced project is estimated to
be $42,813.00. Values used to determine this estimate are included in the
attached table. This estimate does not include indirect costs due to overhead or
indirect manufacturing expenses.
Please contact us if you have any questions or if we can be of further assistance.
Sincerely,
GESSNER ENGINEERING, LLC F -7451
(e
Melissa P. Thomas, P.
Attached: Estimated Cost Table
4 F? .
OF T F -4
,*_: ,, ....d$
*
• �0
G
Gessner
Engineering
2501 Ashford Drive
Suite 102
College Station, Texas 77840
P.O. Box 10763, 77842
979.680.8840
fax 979.680.8841
2204 S. Chappell Hill Street
Brenham, Texas 77833
979.836.6855
fax 979.836.6847
WATER ''
Item Quantity Units Unit Cost Total
4" PVC Water
20
LF
$ 32.00
$ 640.00
6" PVC Water
185
LF
$ 45.00
$ 8,325.00
6" Gate Valve
2
EA
$ 920.00
$ 1,840.00
4" Gate Valve
1
EA
$ 600.00
$ 600.00
2" Blow -off Valve Assembly
1
EA
$ 1,800.00
$ 1,800.00
18" x 18" x 6" Tapping Sleeve
1
EA
$ 6,000.00
$ 6,000.00
Cast Iron Fittings
0.15
TON
$ 5,200.00
$ 780.00
Pressure Testing and Disinfecting
1
LS
$ 7,200.00
$ 7,200.00
Trench Safety
205
LF
$ 1.00
$ 205.00
Sub Total - Water
$ 27,390.00
SANITARY SE _
Item Quantity Units Unit Cost Total
8" SDR 23.5 PVC SS
113
LF
$ 70.00
$ 7,910.00
Trench Safety
113
LF
$ 1.00
$ 113.00
4' SS MH
2
EA
$ 3,700.00
$ 7,400.00
Sub Total - Paving
$ 15,423.00
Total Construction Cost
1 $ 42,813.00
GE Job # : 10 -0548
Probable Estimate of Public Sitework Construction Costs
Southside Plaza Phase 2
Gessner Engineering, LLC
G Gessner Engineering