HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced •roject. 1, The one -year warranty is hereby affirmed and agreed to by and by their subcontractors as indicated by signatures below. WORK COMPLETED Svwe fl t Owner: c C-S Irvelvrmen + Phone Number: 97 y- (AO 122z Address: 40 g0 • &A,..N1� r Signature: ACCEPTA APPROVAL 'Ci y Representative ity ' ngineer Revised 1/31/07 T - 17.84-5 DATE: /c/ RE: COMPLETION OF ..t,/t) v 141 t 1 s 3 Address: Signature: WARRANTY DATE / / / /c) J/ // /6// Contractor: \\ tP) \\ (1'1 &kJ\L1S Phone Number: TALI) \ 1 qNv\ KfroA V1/4kk,,IL-\ PLAT FILED VI r ��) ^� OFFSITE ESMTS FILED '`� F 'TEMP BLANKET ESMT FILED � r NO OTHER ESMTS NEEDED 2 Earthwork for Street Construction ( +/- 5 ,280 CY Excavation/Embankment) (item includes topsoil stripping and replacement in ROW and easements) L.S. 1 31,000.00 $31,000 3 6" Lime Stabilized Subgrade (6% by weight) S.Y. 11,395 4.00 $45,580 4 6" Crushed Limestone Base S.Y. 7,495 9.00 $67,455 5 8" Crushed Limestone Base S.Y. 1,009 12.00 $12,108 6 2" HMAC Surface Course (including prime coat) S.Y. 8,504 9.50 $80,788 7 Concrete Curb and Gutter (all types) L.F. 5,353 10.50 $56,207 8 6" Reinforced Concrete Pavement S.Y. 344 40.00 $13,760 9 4" Reinforced Concrete Sidewalk S.F. 10,566 4.00 $42,264 10 6" PVC Conduit LF -100 12.00 $1,200 11 Colored Sidewalk Ramps EACH 8 750.00 56,000 Paving Subtotal $356,362 12 18" RCP Pipe, (ASTM C -76, CL Ill) (Structural Backfill) L.F. 82 53.00 $4,346 13 18' HDPE Pipe, (ADS, N -12 or approved equal w /water -tight joints) L.F. 116 38.00 $4,408 14 24" RCP Pipe, (ASTM C -76, CL HI) (Structural Backfill) L.F. 292 60.00 $17,520 15 24" HDPE Pipe, (ADS, N -12 or approved equal w /water -tight joints) L.F. 25 40.00 $1,000 16 30" HDPE Pipe, (ADS, N -12 or approved equal w /water -tight joints) L.F. 41 50.00 $2,050 17 48" RCP Pipe, (ASTM C -76, CL III) (Structural Backfill) L.F. 213 175.00 $37,275 18 18" HDPE 4:1 Sloped Headwall EACH 1 1,000.00 $1,000 19 30" RCP 4:1 Sloped Headwall EACH 1 1,500.00 $1,500 20 48" RCP 4:1 Sloped Headwall EACH 6 1,800.00 $10,800 21 Construct Top of Existing Inlet EACH 4 750.00 $3,000 22 Standard 10' Recessed Inlet EACH 2 3,250.00 $6,500 23 Standard 5' Recessed Inlet EACH 5 2,750.00 $13,750 24 Standard Junction Box EACH 1 2,500.00 $2,500 25 Rock Rip -Rap Channel Lining, on Filter Fabric S.Y. 117 75.00 $8,775 Drainage System Subtotal $114,424 26 24" ANSIJAW WA C 151/A21.5, CL 200 DIP Water Line (Non -Str. Backfill) L.F. 1,577 85.00 $134,045 27 8" PVC, C909 C1 200, Water Line, Non -Str. Backfill L.F. 744 14.00 $10,416 28 8" PVC, C909 CI 200, Water Line, Str. Backfill L.F. 880 35.00 $30,800 29 6" PVC, C909 C1 200, Water Line, Non -Str. Backfill L.F. 478 18.00 $8,604 30 6" PVC, C909 CI 200, Water Line, Str. Backfill L.F. 68 25.00 $1,700 30 4" PVC, C909 Cl 200, Water Line, Non -Str. Backfill L.F. 641 14.00 $8,974 31 36" Steel Casing (includes spacers and structural backfill) L.F. 60 250.00 $15,000 32 Fire Hydrant Assembly EACH 3 3,150.00 $9,450 33 24 "x45 deg Bend EACH 4 2,025.00 $8,100 34 24 "x11.25 deg Bend EACH 2 2,025.00 $4,050 35 24" Butterfly Valve EACH 1 6,000.00 56,000 36 6" Blow -off Valve EACH 1 3,000.00 $3,000 37 8 "x8" M.J. Tee EACH 2 450.00 $900 38 8 "x6" M.J. Tee EACH 2 450.00 8900 39 8" M.J. Gate Valve EACH 6 900.00 $5,400 40 8 "x24" M.J. Anchor Coupling 8 "x45 deg. Bend EACH EACH 9 18 175.00 400.00 $1,575 $7,200 41 42, 8 "x4" Reducer EACH 1 350.00 $350 43 6'x4" Reducer EACH 1 350.00 $350 Bern # SONOMA, PHASE 3 MBESI PROJ #: 10530015 Engineer's Estimate of Construction Costs November 23, 2009 Description Site Preparation Paving Construction Drainage System Construction Water System Construction 1 of 2 1 Unit 1 Quantity 1 Unit Price Total Clearing and Grubbing Ac. 7.3 2,000.00 Site Preparation Subtotal $14,600 $14,600 Item # Description Unit Quantity Unit Price Total 44 6" M.J. Gate Valve EACH 2 800.00 $1,600 45 6 "x45 deg Bend - EACH 4 350.00 _ $1400 46 6 "x24" M.J. Anchor Coupling EACH 2 250.00 8500 47 4 "x45 deg Bend EACH 5 150.00 $750 48 4 "x11.25 deg Bend EACH 2 150.00 $300 49 2" Blow Off Valve Assembly EACH 3 950.00 $2,850 50 Connect to Ex. Water Line EACH 4 500.00 $2,000 51 Water Service, 1.5" type K Copper, short side (<20') EACH 16 800.00 $12,800 52 Water Service, 1' type K Copper, short side (< 20') EACH 6 550.00 $3,300 53 Water Service, 1.5" type K Copper, long side (> 20') EACH 17 1,600.00 $27,200 54 Water Service, 1" type K Copper, long side (> 20) EACH 4 1,400.00 $5,600 Water System Subtotal $315,114 55 6" PVC, D -3034 SDR 26 L.F. 965 7.00 $6,755 56 Str. Backfill (8' -10' Depth) L.F. 391 33.00 $12,903 57 Non -Str. Backfll (5' -8' Depth) L.F. 500 14.25 $7,125 58 Non -Str. Backfill (8' -10' Depth) L.F. 74 16.25 $1,203 59 Standard 4' Diam Manhole, 0 -6 ft. deep EACH 5 2,000.00 810,000 60 Standard 5' Diam. Manhole, 0-6 ft. deep EACH 1 2,500.00 52,500 61 Connect to Ex. Sewer Line EACH 2 750.00 $1,500 62 Extra Depth (> 6'), 4' Diam. Manhole V.F. 10 275.00 $2,750 63 Extra Depth (> 6), 5' Diam. Manhole V.F. 7 300.00 $2,100 64 Short Side 4" Sewer Service (< 20') EACH 5 400.00 $2,000 65 Long Side 4" Sewer Service ( >20') EACH 10 1,200.00 $12,000 66 Extend Existing Sewer Service EACH 11 750.00 $8,250 67 Trench Safety (sewer) L.F. 965 1.00 $965 Sewer System Subtotal 870,051 68 Erosion Control Plan & Sedimentation Control (per Item 106) (includes monitoring, record keeping, grass seeding, and cleanup) Y L.S. 1 5,000.00 $5,000 69 Silt Fence (Type 1) L_F. 150 3.00 $450 70 Silt Fence (Type 2) L.F. 1,141 5.00 $5,705 71 Silt Fence (Type 3) L.F. 3,333 3.00 $9,999 72 Inlet Protection L.F. 10 250.00 $2,500 73 Headwall Protection L.F. 1 250.00 $250 74 Entrance/Exit L.F. 1 1,800.00 $1,800 SONOMA, PHASE 3 MBESI PRO.' #: 10530015 Engineer's Estimate of Construction Costs November 23, 2009 r 2 of 2 Erosion Control Subtotal $25,704 Total Construction Cost' $896,254 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. OF 7.6-,N1 i > co mil° x �s�` tl r� JEFFERY L. ROBERTSON ......... ° 4. ...E 1� p.` ■ ,_.. p 1-1 s SOP: Filing of Final Plats - Letters of Completion 07/16/10 Engineering Inspector /Date: Kz (-K� i .�kv Project Engineer /Date: �l, : DP Number: 09 , 5 � - Inspectors shall acquire written (i.e. email) punchlist comments and subsequently written confirmation from the following contacts before forwarding Letter of Completion to development review engineer: sion /Drainage: Donnie Willis (0: 764 -6375, C: 229 -7632) CS Water Services - General: Charles "Butch" Willis (0: 764 -3435, C: 777 -1202) • Water - coordinate fire flow analyses (or the design engineer for non -city utilities) and confirm test results meets min requirements with the dev review engineer (specific hydrants to test, if simultaneous, and min allowable flow) • Sanitary CS Water Service — Liftstation: Doug Wallace (0: 764 -6333) ;00V Electric and Streetlights: Gilbert Martinez (0: 764 -6255) TU Electric and Streetlights: Tom Brent (0: 821 -5773) John Fontinoe or Randy Trimble (0: 821 -5728) irm with development review engineer that service agreement is in place with BTU Non -City Utility Service Providers: (Wellborn Water SUD, Brushy Creek SUD, Wickson Creek SUD, etc) confirm with development review engineer that infrastructure is complete zer for outstanding issues, la! Constrution Pictures: From contractor on CD -R, Inspector to confirm and file ecord Drawings: (2 Red -Lined Copies) for all Public Infrastructure with the following attestation: "I, , General Contractor for development, certify that the improvements shown on this sheet were actually built, and that said improvements are shown substantially hereon. I hereby certify that to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any are stated correctly hereon." General Contractor d' Record Drawings: (2 Red -Lined Copies) for Public Drainage Infrastructure including Private Detention Facilities with the following attestations: "I hereby attest that I am familiar with the approved drainage plan and associated construction drawings and furthermore, attest that the drainage facilities have been constructed within dimensional tolerances prescribed by the Bryan & College station Unified Stormwater Design Guidelines and in accordance with the approved construction plans or amendments thereto approved by the City of College Station." (affix seal) Licensed Professional Engineer State of Texas No. "I certify that the subdivision improvements shown on this sheet were actually built, and that said improvements are substantially as shown hereon. I further certify, to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any, are stated correctly hereon." General Contractor X nspectors to review Red -lined Record Drawings, upon acceptable confirmation of drawings, inspector to: o file one set of Record Drawings in Public Works files, and ,00 forward one set of Record Drawings to Jeffery Speed (CSU) I nspectors should forward Letters of Completion to the development review engineer that reviewed and stamped the construction plans after confirming: o the date on the Letter of Completion Warranty should reflect the date when all associated punchlist items are completed, and the Owner is shall be listed as the one affirming the one -year warranty Development review engineer to: p 9 o Add Dev Permit Number to Letter of Completion o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar is ready to be filed), all necessary easements (including offsite) have been filed, and blanket easement issues are resolved, and o initial and route the Final Plat mylar for filing. (Note if the developer provided surety the plat it may have been filed ahead of construction.) ✓ Deborah Grace - Rosier (Planning) to file the Final Plat utilizes a coversheet to confirm: o infrastructure is accepted by Letter of Completion —or- Surety is provided and acceptable, o signed and notarized mylar of final plat, o parkland dedication has been paid, o digital file of final plat is provided, o a current paid tax certificate has been submitted, and o the final plat closes to acceptable standards. Development review engineer, upon the filing of Final Plat, stamp the Letter of Completion with the new stamp and verify- initial -n /a the Final Plat was filed, offsite easements have been filed, we have all necessary easements, etc - and then forward the Letter of Completion to Alan Gibbs (City Engineer) for final signature. Carol (Sr. Asst. City Engineer) to: o enter the engineer's estimate and Letter of Completion date into Inspection List o forward hard original of finalized Letter of Completion to Shelia Douglas (Public Works). Shelia to: verify o signatures on the Letter of Completion, o forward scanned copy of Letter of Completion to the owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Samuel Deal (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Diane Broadhurst (CSU), Charles "Butch" Willis (CSU), Sue Holcomb (CSU), Carol Cotter (Engineering), Alan Gibbs (Engineering) and Deborah Grace - Rosier (Planning), o mail copies to the owner and contractor, and o place the original in Public Works Development file. - Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file. Date Time 2:00 P.M. Test completed by Justin Tamplin Witness Vincent Rodriquez Location Sonoma Ph. 3 Nozzle size 2.5 Flow hydrant S -146 Pitot reading 65 G.P.M. 1350 Static hydrant S -144 Static PSI 85 Residual PSI 80 Comments For Initial Co llege Station Utilities Reliable, Affordable, Community Owned Thursday July 29, 2010