Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DP Application
(* CITY or C01.1.,EG STATION Home of Texas A&M University' MINIMUM SUBMITTAL REQUIREMENTS: $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Date of Optional Preapplication or Stormwater Management Conference March 2011 SPECIAL FLOOD HAZARD AREA? ❑ Yes © No (Zone A or Zone AE on FEMA FIRM panels) NAME OF PROJECT ROCK PRAIRIE PROFESSIONAL OFFICE COMPLEX ADDRESS 1103 ROCK PRAIRIE ROAD Street Address 2010 Moses Creek Ct. City College Station 10/10 Street Address City Bryan Phone Number 3200 Crane Avenue 979 - 779 -3336 DEVELOPMENT PERMIT APPLICATION State Texas Phone Number 979- 575 -5022 Fax Number 979- 690 -6888 Phone Number 979- 450 -1116 Fax Number n/a ARCHITECT OR ENGINEER'S INFORMATION: Name Bill Scarmardo, AIA; WCS Architects E -mail bill @scarmardo.com State Texas Fax Number 979- 779 -3424 i I i FOR OFFICE 0 L 1 --�► CASE NO.: DATE SUBMITTED: TIME: STAFF: LEGAL DESCRIPTION (Lot, Block, Subdivision) TRACT 'A -1' SOUTHWOOD HOLDINGS, 2.763 ac (v7953/p025) APPLICANT / PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Joe Gattis, PE; GATTIS Engineering E -mail loe @gattisengineering.com Zip Code 77845 PROPERTY OWNER'S INFORMATION: Name NIVAS Holdings, LP E -mail sukkawala @gmail.com Street Address 17290 Eagle Pass Drive City College Station State Texas Zip Code 77845 Zip Code 77801 Page 1 of 4 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Reealation /� 12. Release of plans to /� S NS/7?�fC� or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMEN - )PERMIT APPLICATION, ARE, TO THE BEST OF MY K OWLE.GE, TRUE, AND ACCU TE. Pro' -erty Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., Project over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGIN ER, AGE E TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE D ELOP NT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURAT . AIMISTO Engine Date 10/10 Page 2 of 4