HomeMy WebLinkAboutCost Estimate08/07/03 THU 12:34 FAX 214 361 5573 HALFF ASSOC INC X1003
A A gob iy1 Ost c o � -t��
ENGINEER'S ESTIMATE OF PROBABLE COSTS OF PUBLIC INFRASTRUCTURE
FOR
CINEMARK MOVIES 16 EXPANSION
COLLEGE STATION, TEXAS
BY
HALFF ASSOCIATES, INC.
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT
DRAINAGE
1
18" RCP (CL. III)
148
LF
$53.50
$7,918.00
2
30" RCP (CL. III)
120
LF
$85.00
$10,200.00
3
STANDARD 10' CURB INLET
1
EA
$3,200.00
$3,200.00
4
STANDARD 4'X 4' JUNCTION BOX
1
EA
$1,400.00
$1,400.00
5
STANDARD 5'X 4' JUNCTION BOX
1
EA
$4,000.00
$4,000.00
6
CONNECT TO EXIST. 18" RCP
1
LS
$750.00
$750.00
WATER
7
8" PVC C900 PIPE
300
LF
$31.05
$9,315.00
8
8" BLOW OFF VALVE
1
EA
$475.00
$475.00
9
FIRE HYDRANT INSTALLATION + 6" PVC
1
EA
$2,100.00
$2,100.00
10
FIRE HYDRANT RELOCATION + 6" PVC
1
EA
$2,000.00
$2,000.00
11
CAST IRON FITTINGS (INCLUDES VALVES)
4
EA
$250.00
$1,000.00
12
DEMO 8" WATER LINE
202
LF
$9.20
$1,858.40
13
WET CONNECTIONS (TIE -IN TO EXISTING)
2
EA
$2,100.00
$4,200.00
SUBTOTAL $48,416.40
CONTINGENCY (10 %) $4,842.00
TOTAL $53,258.40
NOTES:
1. IT IS UNDERSTOOD AND AGREED THAT THIS IS AN ESTIMATE ONLY AND THAT ENGINEER SHALL
NOT BE LIABLE TO THE OWNER OR A THIRD PARTY FOR ANY FAILURE TO ACCURATELY
ESTIMATE THE COST OF THE PROJECT, OR ANY PART THEREOF.
2. ESTIMATE INCLUDES ONLY THE PUBLIC INFRASTRUCTURE THAT MUST BE CONSTRUCTED IN
COORDINATION WITH THE PROJECT. rjg� F )
_ me
DON AILLET
....................
sos42 a,
C: \Documents and Settings\ah1594\Local Settings \Temporary Internet Files \OLKA \CS - Permit Est.1&&2003