October 21, 2003
TO: Craig Browne, North Forest, LLC, Via fax 846.7924 ✓
FROM: Bridgette George, Assistant Development Manager
SUBJECT: NORTH FOREST (PP) - Preliminary Plat
Staff reviewed the above - mentioned preliminary plat as requested. The following page
is a list of staff review comments detailing items that need to be addressed. If all
comments have been addressed and the following information submitted by Monday,
October 27, 10:00 a.m., your project will be placed on the next available Planning and
Zoning Commission meeting scheduled for November 6, 2003, 7:00 p.m. in the City
Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised preliminary plat; and,
One (1) Mylar original of the revised preliminary plat.
One (1) copy of the digital file of the preliminary plat on diskette or e-mail
to nmanhart@ci.college - station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed, your project will be pulled from the scheduled
Planning & Zoning Commission agenda. Your project may be placed on a future
agenda once all the revisions have been made and the appropriate fees paid. If you
have any questions or need additional information, please call Carol Cotter or myself at
764.3570.
Attachments: Staff review comments
cc: Henry Kapchinski, 846.7924
Joe Schultz, P.E., Texcon, Via fax 979.764.7759
Case file #03- 00500248
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 1
Project: NORTH FOREST EAST (PP) - 03- 00500248
ENGINEERING
1. Please provide copy of access easement 308/906.
2. The blanket easements that exist on the property will have to be released prior to
construction of infrastructure and filing of the final plat.
3. You will need a variance for driveway spacing. The proposed Alison Avenue will not
meet the opposite right spacing requirement with the planned St. Thomas Aquinas
driveway on to North Forest Drive.
4. The proposed sewer relocation redirects against the flow at too great an angle.
Please revise.
Reviewed by: Carol Cotter Date: October 17, 2003
ELECTRICAL
1. Developer installs conduit as per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser pole(s). Developer installs first
10'. City installs remainder.
3. Developer installs pull boxes as per city specs and design. (pull boxes provided by
the city).
4. Developer provides digital AutoCAD 2002 version of plat and /or site plan. Email to
rbolin(a�cstx.gov.
5. Developer installs street lighting per city specs and design.
6. Developer provides temporary blanket easement for construction purposes.
7. Developer provides easements for electric infrastructure as installed for electric lines
(including street lighting).
8. Developer is responsible for obtaining a 10' PUE along North Forest Parkway on the
Stephen M. Swetish track. Electric service will be provided from electric overhead
line extension from the East at Emerald Forest.
Reviewed by: Ronnie Bolin Date: 10 -20 -03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
2 of 2
Th(N
General Contractors
Div. of CDS Enterprises, Inc.
1707 Graham Rd. • College Station, TX 77845 • 979 - 690 -7711 • Fax: 979 - 690 - 9797
October 27, 2003
Bridgette George
Asst. Development Coordinator
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: Revised Preliminary Plat
North Forest Subdivision
College Station, Texas
Dear Ms. George:
Attached are 10 copies of the revised Preliminary Plat, the mylar original of the revised
Preliminary Plat, an explanation of the Variance Request, and a $100 check for the
Variance Request Fee for the above - mentioned project. A digital copy of the revised
Preliminary Plat will be emailed to Nanette Manhart. Revisions have been made per your
comments dated October 22, 2003. Please refer to the attached response to the Staff
Comments for additional information regarding revisions.
If you have any questions or need additional information, please do not hesitate to give
me a call at (979) 764 -7743.
Sincerely Yours,
•
�)' 4
Joe Schultz, P.E.
Engineering Manager
Attachments
North Forest Subdivision
Response to Staff Review Comments No. 1
Engineering:
1. A copy of the easement has been included with this resubmittal.
2. The blanket easements will be released as requested.
3. Attached are 10 copies of the Variance Request explanation, as well as a
check for $100 to cover the Variance Request Fee.
4. The proposed sewer line relocation alignment has been revised.
Electrical:
Notes have been included on the plat, including the addition of Note #8.
** *Other Revisions:
1. The storm sewer has been revised due to further drainage analysis.
2. The fire hydrant locations have been adjusted.