HomeMy WebLinkAboutAppendix D ~ Technical Design SummaryPart 2 - Project Administration
Start (Page 2.1)
Engineering and Design Professionals Information
Engineering Firm Name and Address:
12-me CoNbiVT«tG FniCorWE.'�R,S
•oC 925'6
Coy -t-P• ( AS S l'A l ` °N, Tx -1?13 2-
Jurisdiction
City: Bryan
f, College Station
Date of Submittal:
t ° )Sill
Lad Engineer's Name and Contact Info.(phone, e-mail, fax):
ex+a A - In/ 1E.,.TC.Ac.F P. E.
'(ZA eti,.t @ R- w11 -,NCi i NE-eye.. C !1
Other:
Supporting Engineering / Consulting Firm(s):
Other contacts:
Developer / Owner / Applicant Information
Developer / Applicant Name and Address:
Phone and e-mail:
Property Qwner(s) if not Developer / Applicant (& address):
(V1% D , W l-kle •t. ( >t NC-
IctIct vJNt uwi -_ t-6vs Ty- -77 ot
Phone and e-mail:
Project Identification
Development Name: M. t,W. C — r —Ds. -c t1oN 1 Acct ..1i`j
Is subject property a site project, a single -phase subdivision, or part of a multi -phase subdivision?
If multi - phase, subject property is phase 2- of 3 .
Legal description of subject property (phase) or Project Area:
(see Section 11, Paragraph B-3a)
Loi 2. , oc..c. C re — Vnii}se . 2€t .>>stor\1, 14 Z.
If subject property (phase) is second or later phase of a project, describe general status of all
earlier phases. For most recent earlier phase Include submittal and review dates.
General Location of Project Area, or subject property (phase):
I( 7og_ �p■zc4v.sr.. -S't Co2NF� Tt s. 1►s m..c.. ..- f+0,.1 pp
j- % NcoLy.) Ave. • O ON I N) SYL.Srr y }pe,.
In City Limits?
Bryan: acres.
Extraterritorial Jurisdiction (acreage):
Bryan: College Station:
Acreage Outside ETJ:
College Station: Co -fi acres.
•
SECTION IX
STORMWATER DESIGN GUIDELINES Page 3 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
Effective February 2007
APPENDIX D - TECHNICAL DESIGN SUMMARY
Part 2 — Project Administration
Continued (page 2.2)
Project Identification (continued)
Roadways abutting or within Project Area or
subject property:
ONws25rv-t P'-
L4 r tco r✓ i•1 PN'E- UE.i
Abutting tracts, platted land, or built
developments:
gee. Lo --cr d'L,
I- t r sc ∎...) e APQtezrnt S
Amasqz 'et_
Named Regulatory Watercourse(s) & Watershed(s):
t) O .byte .o -rev .o-r V 'i of
(L.-itma G2.Fa.
Tributary Basin(s):
Plat Information For Project or Subject Property (or Phase)
Preliminary Plat File #:
Final Plat File #: Date:
Status and Vol /Pg: 1 j` .. t ° I b / ZCo
Name:
If two plats, second name: File #:
Status: Date:
Zoning Information For Project or Subject Property (or Phase)
Zoning Type: C 1 wlb\! Existing or Proposed? Case Code:
Case Date Status:
Zoning Type: Existing or Proposed? Case Code:
Case Date Status:
Stormwater Management Planning For Project or Subject Property (or Phase)
Planning Conference(s) & Date(s):
Participants:
Preliminary Report Required? Submittal Date Review Date
Review Comments Addressed? Yes No In Writing? When?
Compliance With Preliminary Drainage Report. Briefly describe (or attach documentation
explaining) any deviation(s) from provisions of Preliminary Drainage Report, if any.
SECTION IX
STORMWATER DESIGN GUIDELINES Page 4 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
APPENDIX D — TECHNICAL DESIGN SUMMARY
Effective February 2007
Part 2 — Project Administration
Continued (page 2.3)
Coordination For Project or Subject Property (or Phase)
Note: For any Coordination of stormwater matters indicated below, attach documentation
describing and substantiating any agreements, understandings, contracts, or approvals.
Coordination
With Other
Departments of
Jurisdiction
City (Bryan or
College Station)
Dept.
Contact:
Date:
Subject:
Coordination With
Non jurisdiction
City Needed ? /
Yes No
Summarize need(s) & actions taken (include contacts & dates):
Coordination with
Brazos County
Needed?
Yes No (/
Summarize need(s) & actions taken (include contacts & dates):
Coordination with
TxDOT Needed?
Yes No ✓
Summarize need(s) & actions taken (include contacts & dates):
Coordination with
TAMUS Needed?
Yes No t/
Summarize need(s) & actions taken (include contacts & dates):
Permits For Project or Subject Property (or Phase)
As to stormwater management, are permits required for the proposed work from any of the entities
listed below? If so, summarize status of efforts toward that objective in spaces below.
Entity
Permitted or
Approved ?
Status of Actions (include dates)
US Army Crops of
Engineers
No ✓ Yes
US Environmental
Protection Agency
No Yes ✓
14(1Z
6:>rt1 f L -.:-[ fz)
Texas Commission on
Environmental Quali
No Yes
N I vi
Cam 9 � - c
Brazos River
Authority
No ✓ Yes
SECTION IX
APPENDIX D - TECHNICAL DESIGN SUMMARY
Part 3 — Property Characteristics
Start (Page 3.1)
Nature and Scope of Proposed Work
Existing: Land
proposed for development currently used, including extent of impervious cover?
2N' 1 buS Cenriza2 4 Ps-es l + PereAcAN --
71 % l vvnPS
Site
Development
Project
(select all
applicable)
V Redevelopment of one
platted
platted lot, or two or more
adjoining
undeveloped
proposed
platted lots.
Building on a single
lot of undeveloped land.
land.
plat will not form
Building on two or more
include
platted adjoining lots of
Building on a single lot,
or adjoining lots, where
ROW dedication to
a new street (but may
Other (explain):
existing streets).
Subdivision
Development
Project
Construction of streets
and utilities to serve one
and utilities to serve one
pending plats.
or
or
more platted lots.
Construction of streets
more proposed lots on
lands represented by
Describe
Nature and
Size of
Proposed
Site projects: building use(s),
approximate floor space, impervious cover ratio.
by general type of use, linear feet of streets and
�X1ST\r`tG� — (re.." — (kwJ 1 1:NC1L1T1
Subdivisions: number of lots
drainage easements or ROW.
1MODtFt0t- 1 tatNiS — C 4
Project
Is any work planned
or on land for which
V No
on land that is not platted
If yes, explain:
platting is not pending?
Yes
FEMA Floodplains
is any part of subject property abutting a Named Regulatory Watercourse
(Section II, Paragraph B1) or a tributary thereof?
No Yes
Is any part of subject property in floodplain
area of a FEMA - regulated watercourse?
No
Yes
Rate
Map ot�t Z C..
Encroachment(s)
into Floodplain
areas planned?
No
Encroachment purpose(s):
Utility crossing(s)
Building site(s) Road crossing(s)
t/ Other (explain):
F&' - ry .
c tAi marl w+■ 6F 'FIX PLAN
Yes t/
If floodplain areas not shown on Rate Maps, has work been done toward amending the FEMA-
approved Flood Study to define allowable encroachments in proposed areas? Explain.
SECTION IX
APPENDIX D — TECHNICAL DESIGN SUMMARY
STORMWATER DESIGN GUIDELINES Page 6 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
Effective February 2007
As Revised February 2009
Part 3 — Property Characteristics
Continued (Page 3.2)
Hydrologic Attributes of Subject Property (or Phase)
Has an earlier hydrologic analysis been done for larger area including subject property?
Ye s i
�/
Reference the study (& date) here, and attach coy if not already in City files.
�t. J`1 � � - P ZAA ts.AC - F�^.�Pd2''7 — k 1231 O LP
1 I.-1 ern E. Co t.- t\�c -- c .
Is the stormwater
earlier study?
manag�nt plan for the property in substantial
Yes No If not, explain how
conformance with the
it differs.
No
If subject property
plan for the property
is not part of multi -phase project, describe
stormwater management
in Part 4.
If property is part of multi -phase project, provide overview of stormwater management plan
for Project Area here. In Part 4 describe how plan for subject property will comply
therewith.
Do existing topographic features on subject property store or detain
Describe them (include approximate size, volume, outfall, model, etc).
�Xt'(t rat G[' Dt?. 9..ert tort �c�t1A
runoff? No r/ Yes
Any known drainage or flooding problems in areas near subject property?
Identify:
✓ No Yes
Based
(see Table
on location of
B-1 in Appendix
Detention is required.
study property in a watershed, is Type 1 Detention (flood control) needed?
B)
Need must be evaluated. Detention not required.
If the need for
Type 1 Detention ala a
must be evaluated:
What decision has been reached? By whom?
- FO E.- Cot45∎SL F 1 .sca- kr..E.To2..S
How was determination made? '-r
(�oGPf't to .t op- t o ? I Z$. I " YV 11't12)Q�S}�tt�p
-4- 17CtS-t tic -- 'Fog 0.
SECTION IX
STORMWATER DESIGN GUIDELINES Page 7 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
APPENDIX D — TECHNICAL DESIGN SUMMARY
Effective February 2007
Part 3 - Property Characteristics
Continued (Page 3.3)
Hydrologic Attributes of Subject Property (or Phase) (continued)
Does subject property straddle a Watershed or Basin divide?
describe splits below. In Part 4 describe design concept
EZ No Yes If yes,
for handling this.
Watershed or Basin
Larger acreage
Lesser acreage
Above - Project Areas(Section II, Paragraph B3 -a)
Does Project Area (project or phase) receive runoff from upland areas?
Size(s) of area(s) in acres: 1) (Q - 1 LP 2) 3)
No Yes
4)
Flow Characteristics (each instance) (overland sheet, shallow
concentrated, recognizable
Watercourse or tributary);
12.,cGc_ 0Q . , zt4Ct41
'FAC t Li'7y 0 11--
' S-IS %GVV1 a i LA m
concentrated section(s), small creek (non - regulatory), regulatory
tni1Prt,t._ o \ma -I vim- })E.rr( ov.D -- io
c FLo� - c% - i' Hq..- - cF.�rt.o>..1
NP OP,`- s S.1.6. .l- - t NF•...t '" i L
Flow determination: Outline hydrologic methods and assumptions:
39.... c.xeArn 7
, g4,- ( ( a-+ L. , -rt -lop uJ \t - Ct vv\€
GPtLco %P1 x of .
Does storm runof);drain from public easements or ROW
No v/ Yes If yes, describe facilities in easement
onto or across subject property?
or ROW:
V ov`1 of (. tNc.ot...c.) A4E .,
Are changes in runoff characteristics subject to change in future? Explain
Conveyance Pathways (Section II, Paragraph C2)
Must runoff from study property drain across lower properties before reaching a Regulatory
Watercourse or tributary? I/ No Yes
Describe length and characteristics of each conveyance pathway(s). Include ownership of
property(ies).
pal gi r CtLI-cy DlscA- W-exg> ID‘e-E- C-1 " 1/4 1 iNt1s - c
Zc - it+ 2 of '[r1E oNN A-rnf z - Tres CNI - mey of= tkee
SECTION IX
STORMWATER DESIGN GUIDELINES Page 8 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
APPENDIX D — TECHNICAL DESIGN SUMMARY
Effective February 2007
Part 3 — Property Characteristics Continued (Page 3.4)
Hydrologic Attributes of Subject Property (or Phase) (continued)
Conveyance Pathways (continued)
Do drainage
easements
exist for
part of
pathyvay(s)?
No
any
If yes, for what part of length? % Created by? plat, or
instrument. If instrument(s), describe their provisions.
Yes
Pathway
Areas
Where runoff must cross lower properties, describe characteristics of abutting lower
property(ies). (Existing watercourses? Easement or Consent aquired ?)
DSG t.)Pre-c�� -S re- 'F� -cr-ri -1 ) NCO u tA"T O�."4
W P e-- C ovese ,
Nearby
Drainage
Facilities
Describe any built or improved drainage facilities existing near the property (culverts,
bridges, lined channels, .buriedconduit, swales, detention ponds, etc).
O I A b v . . ) C i c � e s ' z Y2... c 1 dc q . . - W - J s r i k 0 N 1 c L 1 'VI
• & Srt ' cc2 S-i s-t D L r 4C.c - N I .
Do any of
design?
-roc, L_
t,JtN.
EA CAL-
- .W,
these have hydrglogic or hydraulic influence on proposed stormwater
No ✓ Yes If yes, explain:
1 VF s,/Pr'1 LAIN1 OF — rile— — - )'Ct • FicC.t Lt T1
`a,G- - T: v..1. of (... I iv Cot_ IN S o2.rv1 5 p )6.4 ,
D F- U Wo- IM 12..r.S7 '1 \Q-.1Ii •rr 3'(-"1 W t t. L
oe- jl,-T t Rt.)p ev'7LZ f.
SECTION IX
STORMWATER DESIGN GUIDELINES Page 9 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
APPENDIX D = TECHNICAL DESIGN SUMMARY
Effective February 2007
Part 4 - Drainage Concept and Design Parameters
Start (Page 4.1)
Stormwater Management Concept
Discharge(s) From Upland Area(s)
If runoff is to be received from upland areas, what design drainage features will be used to
accommodate it and insure it is not blocked by future development? Describe for each area,
flow section, or discharge point.
-r -wi St- YWl- 4.s
Discharge(s) To Lower Property(ies) (Section I1, Paragraph El)
Does project include drainage features (existing or future) proposed to become public via
platting? No Yes Separate Instrument? �/ No Yes
Per Guidelines reference above, how will
runoff be discharged to neighboring
property(ies)?
Establishing Easements (Scenario 1)
i/ Pre - development Release (Scenario 2)
Combination of the two Scenarios
Scenario 1: If easements are proposed, describe where needed, and provide status of actions
on each. (Attached Exhibit # )
Scenario 2: Provide general description of how release(s) will be managed to pre - development
conditions (detention, sheet flow, partially concentrated, etc.). (Attached Exhibit # )
Ni p -t ro Fug Pe-1 r. - t td.s iPo.1 P
Combination: If combination is proposed, explain how discharge will differ from pre -
development conditions at the property line for each area (or point) of release.
If Scenario 2, or Combination are to be used, has proposed design been coordinated with
owner(s) of receiving property(ies)? No Yes Explain and provide
documentation.
SECTION IX
STORMWATER DESIGN GUIDELINES
Effective February 2007
APPENDIX D - TECHNICAL DESIGN SUMMARY
Page 10 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.2)
Stormwater Management Concept (continued)
Within Project Area Of Multi -Phase Project
Will project result
in shifting runoff
between Basins or
between
Watersheds?
✓ No
Identify gaining Basins or Watersheds and acres shifting:
What design and mitigation is used to compensate for increased runoff
from gaining basin or watershed?
Yes
How will runoff from Project
Area be mitigated to pre-
development conditions?
Select any or all of 1, 2,
and/or 3, and explain below.
1. With facility(ies) involving other development projects.
2. ✓ Establishing features to serve overall Project Area.
3. On phase (or site) project basis within Project Area.
1. Shared facility (type & locabon of facility; design drainage area served; relationship to size of
Project Area): (Attached Exhibit # )
2. For Overall Protect Area (type & location of facilities): (Attached Exhibit # )
Pe:"1 - R , X 4 / 1 tr -K l'...1 f%1410 uJ r( t4 YX 024 F1 Ll=
5e. 2.r 1 rt (A- , rh9-- - (•rz.. -- See 91-Negri 0:2A .
3. By phase (or site) project: Describe planned mitigation measures for phases (or sites) in
subsequent questions of this Part.
Are aquatic echosystems proposed? No Yes In which phase(s) or
project(s)?
Are other Best Management Practices for reducing stormwater pollutants proposed?
No Yes Summarize type of BMP and extent of use:
If design of any runoff - handling facilities deviate from provisions of B -CS Technical
Specifications, check type facility(ies) and explain in later questions.
Detention elements Conduit elements Channel features
Swales Ditches Inlets Valley gutters Outfalls
Culvert features Bridges Other
SECTION IX
APPENDIX D - TECHNICAL DESIGN SUMMARY
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.3)
Stormwater Management Concept (continued)
Within Project Area Of Multi -Phase Project (continued)
Will Project Area include bridge(s) or culvert(s)? V No Yes Identify type and
general size and In which phase(s).
If detention /retention serves (will serve) overall Project Area, describe how it relates to subject
phase or site project (physical location, conveyance pathway(s), construction sequence):
T s-rs CI-2A 4 e2.1
Within Or Serving Subject Property (Phase, or Site)
If property part of larger Project Ayea, is design in substantial conformance with earlier analysis
and report for larger area? L,/ Yes No, then summarize the difference(s):
Identify whether each of the types of drainage features listed below are included, extent of use,
and general characteristics.
Typical shape?
Surfaces?
ditches use
Yes
Steepest side slopes:
Usual front s opes:
Usual back slopes:
Flow line slopes: least
Typica distance from travelway:
(Attached Exhibit # )
typical greatest
Are longitudinal culvert ends in compliance with B -CS Standard Specifications?
Yes No, then explain:
At intersections or otherwise, do valley gutters cross arterial or collector streets?
No Yes If yes explain:
Are streets with cI.
and gutter used'
!/No
Are valley gutters proposed to cross any street away from an intersection?
No Yes Explain: (number of locations ?)
SECTION IX
STORMWATER DESIGN GUIDELINES
Effective February 2007
APPENDIX D - TECHNICAL DESIGN SUMMARY
Page 12 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.4)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Are streets with curb and gutter used?
(continued)
Gutter line slopes: Least Usual Greatest
Are inlets recessed on arterial and collector streets? Yes No If "no ",
identify where and why.
Will inlets capture 10 -year design stormflow to prevent flooding of intersections (arterial
with arterial or collector)? Yes No If no, explain where and why not.
Will inlet size and placement prevent exceeding allowable water spread for 10 -year
design storm throughout site (or phase)? Yes No If no, explain.
Sag curves: Are inlets placed at low points? Yes No Are inlets and
conduit sized to prevent 100 -year stormflow from ponding at greater than 24 inches?
Yes No Explain "no" answers.
Will 100 -yr stormflow be contained in combination of ROW and buried conduit on
whole length of all streets? Yes No If no, describe where and why.
Do designs for curb, gutter, and inlets comply with B -CS Technical Specifications?
Yes No If not, describe difference(s) and attach justification.
Is storm drain system used?
No !/Yes
Are any 12 -inch laterals used? / No Yes Identify length(s) and where
used.
Pipe runs between system
access points (feet):
Typical (02. Longest Cot
Are junction boxes used at each bend? V Yes No If not, explain where
and why.
Are down tream soffits at or below upstream soffits?
Yes V No If not, explain where and why:
Least amount that hydraulic
grade line is below gutter line
(system - wide):
2.I 1 1 60 —` F -ANC.)
SECTION IX
STORMWATER DESIGN GUIDELINES
Effective February 2007
APPENDIX D - TECHNICAL DESIGN SUMMARY
. • (I - Mite c)
Page 13 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.5)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Storm drain system (continued)
(on separate sheet provide same info. for more instances)
(s)IieAno
Describe watercourse(s), or system(s) receiving system discharge(s) below
(include design discharge velocity, and angle between converging flow lines).
1) Watercourse (or system), velocity, and angle?
- 1 %Ai rani Pc D — to - \ , P S -
2) Watercourse (or system), velocity, and angle?
3) Watercourse (or system), velocity, and angle?
For each outfall above, what measures are taken to prevent erosion or scour of
receiving ei/__and all facilities at juncture? ,
1 ) (�t� 2.' - (f: -'� L L -i C.► -}i3 NW �i V e l .-r-1
2) plPrePrtk ez--
3)
Are swales used to drain streets?
!/ Yes
Are swale(s) situated along property lines between properties? No Yes
Number of instances: For each instance answer the following questions.
Surface treatments (including low -flow flumes if any):
Flow line slopes (minimum and maximum):
Outfall characteristics for each (velocity, convergent angle, & end treatment).
Will 100 -year design storm runoff be contained within easement(s) or platted drainage
ROW in all instances? Yes No If "no" explain:
SECTION IX
STORMWATER DESIGN GUIDELINES
Effective February 2007
APPENDIX D — TECHNICAL DESIGN SUMMARY
Page 14 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
Part 4 — Drainage Concept and. Design Parameters
Continued (Page 4.6)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Are roadside ditches used? No Yes If so, provide
the following:
? Yes No
Is 25 -year flow contained with 6 inches of freeboard throughout
Are top of banks separated from road shoulders 2 feet or more?
Are all ditch sections trapezoidal and at least 1.5 feet deep?
Yes No
Yes No
For any no answers provide location(s) and explain:
ional instances)
If conduit is beneath a swale, provide the following information (each instance).
Instance 1 Describe general location,
approximate length:
Is 100 -year design flow contained in conduit/swale combination?
If "no" explain:
Yes No
Space for 100 -year storm flow? ROW Easement Width
Swale Surface type, minimum
Conduit Type and size, minimum
and maximum
and maximum slopes:
slopes, design storm:
SECTION IX
APPENDIX D - TECHNICAL DESIGN SUMMARY
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.7)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Will swales without buried con it receive runoff from
public ROW or easements? 17 No Yes. Explain
If "yes" provide the following information for each instance:
Instance 1 Describe general location, approximate length, surfacing:
Is 100 -year design flow contained in swale? Yes No Is swale wholly
within drainage ROW? Yes No Explain "no" answers:
Access Describe how maintenance access is provide:
Instance 2 Describe general location, approximate length, surfacing:
Is 100 -year design flow contained in swale? Yes No Is swale wholly
within drainage ROW? Yes No Explain "no" answers:
Access Describe how maintenance access is provided:
Instance 3, 4, etc. If swales are used in more than two instances, attach sheet
providing all above information for each instance.
Channel improvements proposed?
r/ No Yes Explain
"New" channels: Will any area(s) of concentrated flow be channelized (deepened,
widened, or straightened) or otherwise altered? No Yes If only slightly
shaped, see "Swales" in this Part. If creating side banks, provide information below.
Will design replicate natural channel? Yes No If "no ", for each instance
describe section shape & area, flow line slope (min. & max.), surfaces, and 100 -year
design flow, and amount of freeboard:
Instance 1:
Instance 2:
Instance 3:
SECTION IX
STORMWATER DESIGN GUIDELINES
Effective February 2007
APPENDIX D — TECHNICAL DESIGN SUMMARY
Page 16 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.8)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Channel Improvements (continued)
Existing channels (small creeks): Are these used? No Yes
If "yes" provide the information below.
Will small creeks and their floodplains remain undisturbed? Yes No How
many disturbance instances? Identify each planned
location:
For each location, describe length and general type of proposed improvement
(including floodplain changes):
For each location, describe section shape & area, flow line slope (min. & max.),
surfaces, and 100 -year design flow.
Watercourses (and tributaries): Aside from fringe changes,
are Regulatory
Explain below.
Watercourses proposed to be altered? No Yes
Submit full report describing proposed changes to Regulatory
existing and proposed section size and shape, surfaces, alignment,
length affected, and capacity, and provide full documentation
and data. Is full report submitted? Yes No
Watercourses. Address
flow line changes,
of analysis procedures
If "no" explain:
All Proposed Channel Work: For all proposed channel work,
provide information
requested in next three boxes.
If design is to replicate natural channel, identify location and length here, and describe
design in Special Design section of this Part of Report.
Will 100 -year flow be contained with one foot of freeboard? Yes No If
not, identify location and explain:
Are ROW / easements sized to contain channel and required
Yes No If not, identify location(s) and explain:
maintenance space?
SECTION IX
STORMWATER DESIGN GUIDELINES
Effective February 2007
APPENDIX D - TECHNICAL DESIGN SUMMARY
Page 17 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
Part 4 - Drainage Concept and Design Parameters
Continued (Page 4.9)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
I
How many facilities for subject property project? 1 For each provide info. below.
For each dry-type facilitiy:
Faci ity 1
Faci ity 2
Acres served & design volume + 10%
az OS-
15 S1
100 -yr volume: free flow & plugged
in
Design discharge (10 yr & 25 yr)
6›,ejO
(
Spillway crest at 100 -yr WSE?
yes V
yes no
Berms 6 inches above plugged WSE?
V yes no
yes no
Explain any "no" answers:
A ID Ot to S (1.k ce 'P'eDJ
Goa -ester +goo - yam- 'Pont_
tCirrxo Cu- W-
f�L:c- L.
Set U.- .4
For each facility what i - 25 -yr design Q, and design of outlet structure?
Facility 1: (J 7 2 cQ5 — 1r 04 Pt Pt.
Facility 2:
Do outlets and spillways discharge into a public facility in easement or ROW?
Facility 1: Yes ✓ No Facility 2: Yes No
If "no" explain:
Di `7GA 1 .a''i` 1 et UNrt 1L vv v •.)O T2A N. , - rat Ne
For each, what is velocity of 25 -yr design discharge at outlet? & at spillway?
Facility 1: '"�j, & Facility 2: &
Are energy dissipation measures used? No (/ Yes Describe type and
location:
. X∎ e'E t i.i G W-. ere- r�-,p
For each, is spillway surface treatment other than concrete? Yes or no, and describe:
Facility 1: �x.\L fiR44 - gp,f
Facility 2:
For each, what measures are taken to prevent erosion or scour at receiving facility?
Facility 1: 'R)c _- Rk P - tea
Facility 2:
If berms are used give heights, slopes and surface treatments of sides.
Facility 1: G Q F _ Tpok. oN 51E€ CZ- t
Facility 2:
SECTION IX
STORMWATER DESIGN GUIDELINES
Effective February 2007
APPENDIX D — TECHNICAL DESIGN SUMMARY
Page 18 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
SECTION IX
Part 4 — Drainage Concept and Design Parameters
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
rn
c
Continued (Page 4.10)
Do structures comply with B -CS Specifications? Yes or no, and explain if 'no":
Facility 1;
Facility 2:
For additional facilities provide all same informatioryon a separate sheet.
Are parking areas to be used for detention?
maximum depth due to required design storm?
Yes What is
Roadside Ditches: Will culverts serve access driveways at roadside ditches?
No Yes If "yes ", provide information in next two boxes.
Will 25 -yr. flow pass without flowing over driveway in all cases? Yes No
Without causing flowing or standing water on public roadway? Yes No
Designs & materials comply with B-CS Technical Specifications? Yes No
Explain any "no" answers:
v,
2
0 N
APPENDIX D - TECHNICAL DESIGN SUMMARY
Are culverts parallel to public roadway alignment?
Yes
No Explain:
Part 4 - Drainage Concept and Design Parameters
Continued (Page 4.11)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
(for more instances of any type describe location and same information on separate sheet)
Named Regulatory Watercourses (& Tributaries): Are culverts
proposed on these
assumptions,
support proposed
", explain:
facilities? No Yes, then provide full
report documenting
that
If "no
criteria, analysis, computer programs, and study findings
design(s). Is report provided? Yes No
Arterial or Major Collector Streets: Will culverts
serve these
types of roadways?
For each identify the
No Yes How many instances?
location and provide the information below.
Instance 1:
Instance 2:
Instance 3:
Yes or No for the 100 -year design flow:
1
2
3
Headwater WSE 1 foot below lowest curb top?
Spread of headwater within ROW or easement?
Is velocity limited per conditions (Table C -11)?
Explain any "no" answer(s):
Minor Collector or Local Streets: Will culverts serve
these
types of streets?
for each identify the
No Yes How many instances?
location and provide the information below:
Instance 1:
Instance 2:
Instance 3:
For each instance enter value, or "yes" / "no" for:
1
2
3
Design yr. headwater WSE 1 ft. below curb top?
100 -yr. max. depth at street crown 2 feet or less?
Product of velocity (fps) & depth at crown (ft) _ ?
Is velocity limited per conditions (Table C -11)?
Limit of down stream analysis (feet)?
Explain any "no" answers:
SECTION IX
APPENDIX D - TECHNICAL DESIGN SUMMARY
STORMWATER DESIGN GUIDELINES Page 20 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
Effective February 2007
As Revised February 2009
SECTION IX
STORMWATER DESIGN GUIDELINES
Effective February 2007
APPENDIX D - TECHNICAL DESIGN SUMMARY
Part 4 — Drainaue Concept and Design Parameters
Continued (Page 4.12)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
All Proposed Culverts: For all proposed culvert facilities (except driveway /roadside
ditch intersects) provide information requested in next eight boxes.
Do culverts and travelways intersect at 90 degrees? Yes No If not,
identify location(s) and intersect angle(s), and justify the design(s):
Does drainage way alignment change within or near limits of culvert and surfaced
approaches thereto? No Yes If "yes" identify Iocation(s), describe
change(s), and justification:
Are flumes or conduit to discharge into culvert barrel(s)? No Yes If yes,
identify location(s) and provide justification:
Are flumes or conduit to discharge into or near surfaced approaches to culvert ends?
No Yes If "yes" identify Iocation(s), describe outfall design treatment(s):
Is scour /erosion protection provided to ensure long term stability of culvert structural
components, and surfacing at culvert ends? Yes No If "no" Identify
locations and provide justification(s):
Will 100 -yr flow and spread of backwater be fully contained in street ROW, and /or
drainage easements/ ROW? Yes No if not, why not?
Do appreciable hydraulic effects of any culvert extend downstream or upstream to
neighboring land(s) not encompassed in subject property? No Yes If
"yes" describe location(s) and mitigation measures:
Are all culvert designs and materials in compliance with B -CS Tech. Specifications?
Yes No If not, explain in Special Design Section of this Part.
Page 21 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.13)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued) /
Bridge(s)
Is a bridge included in
If "yes" provide the following
plans for subject property project? �/ No Yes
information.
Name(s) and functional classification of the roadway(s)?
What drainage way(s) is to be crossed?
A full report supporting all aspects of the proposed bridge(s)
hydrologic, and hydraulic factors) must accompany this summary
provided? Yes No If "no" explain:
(structural, geotechnical,
report. Is the report
I4iienp aaleM
Is a Stormwater
Pollution Prevention
Plan (SW3P)
established for
project construction?
/
No /Yes
Provide a general description of planned techniques:
1 - 7 1 c ■s (� 1 ( 9-C v._ 12. i P -'(ZRP
(At■f-- 02A3C p n1 'r,..- tv 4
1- 1�,
{ p,e_o - rYI.1 uct.4 Sefiot NC�—
Special Designs — Non - Traditional Methods
Are any non - traditional methods
repli tion, BMPs for water quality,
No Yes If "yes" list
(aquatic echosystems, wetland -type detention, natural stream
etc.) proposed for any aspect of subject property project?
general type and location below.
Provide full report about the proposed
expected benefits. Report must
be compromised, and that maintenance
solution(s). Is report provided?
0■S?Pc
special design(s) including rationale
substantiate that stormwater management
cost will not exceed those of
Yes No If no explain:
for use and
objectives will not
traditional design
SECTION IX
APPENDIX D - TECHNICAL DESIGN SUMMARY
STORMWATER DESIGN GUIDELINES Page 22 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
Effective February 2007
As Revised February 2009
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.14)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Special Designs — Deviation From B-CS Technical Specifications N f R
If any design(s) or material(s) of traditional runoff - handling facilities deviate from provisions of
B-CS Technical Specifications, check type facility(ies) and explain by specific detail element.
Detention elements Drain system elements Channel features
Culvert features Swales Ditches Inlets Outfalls
Valley gutters Bridges (explain in bridge report)
In table below briefly identify specific element, justification for deviation(s).
Specific Detail Element
Justification for Deviation (attach additional sheets if needed)
1)
2)
3)
4)
5)
Have elements been coordinated with the City Engineer or her /his designee? For each item
above provide "yes" or "no ", action date, and staff name:
1)
2)
3)
4)
5)
Design Parameters
Hydrology /
Is a map(s) showing all Design Drainage Areas provided? 1/ Yes No
Briefly summarize the range of applications made of the Rational Formula:
ol(LtCprk NiPrk_ *' MAA9 eF �Pons'Z u`t t, l Z. "TOE_ ` 1 1 oN R L
What is the size and location of largest
has been applied? (PA acres
Design Drainage Area to which the Rational Formula
Location (or identifier):
SECTION IX
STORMWATER DESIGN GUIDELINES Page 23 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2009
APPENDIX D - TECHNICAL DESIGN SUMMARY
Effective February 2007
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.15)
Design Parameters (continued)
Hydrology (continued)
In making dete inations for time of concentration, was segment analysis used?
No /Yes In approximately what percent of Design Drainage Areas? I o0 %
As to intensity- duration - frequency and rain depth criteria for determining runoff flows, were any
criteria other than those provided in these Guidelines used? No Yes If "yes"
identify type of data, source(s), and where applied:
For each of the stormwater management features listed below identify the storm retum
frequencies (year) analyzed (or checked), and that used as the basis for design.
Feature
Analysis Year(s)
Design Year
Storm drain system for arterial and collector streets
M d
Z-?
Storm drain system for local streets
Open channels
Swale /buried conduit combination in lieu of channel
Swales
Roadside ditches and culverts serving them
Detention facilities: spillway crest and its outfall
1 0
2
Detention facilities: outlet and conveyance structure(s)
I (3
2'5
Detention facilities: volume when outlet plugged
I p
Z.S
Culverts serving private drives or streets
Culverts serving public roadways
Bridges: provide in bridge report.
Hydraulics
What is the range of design flow velocities as outlined below?
Design flow velocities;
Gutters
Conduit
Culverts
Swales
Channels
Highest (feet per second)
11,'g1
Lowest (feet per second)
S
Streets and Storm Drain Systems Provide the summary information outlined below:
Roughness coefficients used: For street gutters:
For conduit type(s) AO? / D.012.. Coefficients:
SECTION IX
APPENDIX D - TECHNICAL DESIGN SUMMARY
STORMWATER DESIGN GUIDELINES Page 24 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
Effective February 2007
As Revised February 2009
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.16)
Design Parameters (continued)
Hydraulics (continued)
Street and Storm Drain Systems (continued)
For the following, are assumptions other than allowable per Guidelines?
Inlet coefficients? No Yes Head and friction losses No Yes
Explain any "yes" answer:
In conduit is velocity generally increased in the downstream direction?
Are elevation drops provided at inlets, manholes, and junction boxes?
Explain any "no" answers:
✓ Yes
No
rYes
No
Are hydraulic grade lines calculated nd shown for design storm?
For 100 -year flow conditions? V Yes No Explain any
/Yes No
"no" answers:
.
What tailwater conditions were assumed at outfall point(s) of the storm
each location and explain:
drain system?
Identify
Open Channels If a HEC analysis is utilized, does it follow Sec VI.F.5.a?
Yes
No
Outside of straight sections, is flow regime within limits of sub - critical
If "no" list locations and explain:
flow? Yes
No
Culverts If plan sheets do not provide the following for each culvert, describe it here.
For each design discharge, will operation be outlet (barrel) control or inlet control?
Entrance, friction and exit losses:
Bridges Provide all in bridge report
SECTION IX
APPENDIX D - TECHNICAL DESIGN SUMMARY
STORMWATER DESIGN GUIDELINES Page 25 of 26 APPENDIX. D: E H. DESIGN IGN SUMMARY
2009 RY
Effective February 2007
Part 4 — Drainage Concept and Design Parameters
Continued (Page 4.17)
Design Parameters (continued)
Computer Software
What computer software has been used in the analysis and assessment of stormwater
management needs and /or the development of facility designs proposed for subject property
project? List them below, being sure to identify the software name and version, the date of the
version, any applicable patches and the publisher
14 — CF -. le- t os4 F c L1 e
4 11 1 beY,r1 jN-3F- &
Part 5 — Plans and Specifications •
Requirements for submittal of construction drawings and specifications do not differ due to use of a
Technical Design Summary Report. See Section III, Paragraph C3.
Part 6 — Conclusions and Attestation
Conclusions
Add any concluding information here:
Attestation
Provide attestation to the accuracy and completeness of the foregoing 6 Parts of this Technical
Design Summary Drainage Report by signing and sealing below.
"This report (plan) for the drainage design of the development named in
by me (or under my supervision) in accordance with provisions of the Bryan
Unified Drainage Design Guidelines for the owners of the property. All
required by any and all state and federal regulatory agencies fort
improvements have been issued or fall under applicable generall ls.
(A ffix lksto
c i V r, 1 G &1 fir, ••
Part B was prepared
/College Station
licenses and permits
sed drainage
° r
• •
• •
"�rLF i
• • •
Licensed Professional Engineer , . i • •
/ t
885[33 _�
•r BON
State of Texas PE No. • •. • •
SECTION IX
APPENDIX D — TECHNICAL DESIGN SUMMARY
'r ' : CE
S/ONAL
STORMWATER DESIGN GUIDELINES Page 26 of 26 APPEN .' . tfi SUMMARY
Effective February 2007
As Revised February 2009