HomeMy WebLinkAboutCost EstimateENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST 6" Fire Service Line HEB College Station 2 Retail Project Bury+Partners Project No.: 50871 -03 Date Prepared: Contractor: Engineer: Location: DESCRIPTION 6" Fire Service Line TOTAL ESTIMATED COST 04/28/10 SpawGlass Bury+Partners, Inc. San Antonio, Texas 1 6" C -900 Pipe 2 6" Isolation Valve 3 D.I. Fittings 6" - 1/8 Bend (45 degree) 6" - 1/32 Bend (11.25 degree) 4 Trench Excavation Protection Date NO. OF UNIT OF UNITS MEAS. 80 LF 1 EA 0.27 TON 4 1 80 LF $60 $1,300 $2,500 srC "d :*; ••: *� ��. rg * MARK ROBERT JOHNSON t' �� .1:).• 82680 rye UNIT TOTAL COST COST Note: The above "Opinion of Probable Construction Cost" is made by an engineer, not a professional construction estimator. The accuracy of estimates cannot be guaranteed. $3 $4,800 $1,300 $675 $240 $7,015