HomeMy WebLinkAboutCost EstimateENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
6" Fire Service Line
HEB College Station 2 Retail Project
Bury+Partners Project No.: 50871 -03
Date Prepared:
Contractor:
Engineer:
Location:
DESCRIPTION
6" Fire Service Line
TOTAL ESTIMATED COST
04/28/10
SpawGlass
Bury+Partners, Inc.
San Antonio, Texas
1 6" C -900 Pipe
2 6" Isolation Valve
3 D.I. Fittings
6" - 1/8 Bend (45 degree)
6" - 1/32 Bend (11.25 degree)
4 Trench Excavation Protection
Date
NO. OF UNIT OF
UNITS MEAS.
80 LF
1 EA
0.27 TON
4
1
80 LF
$60
$1,300
$2,500
srC "d
:*; ••: *� ��.
rg *
MARK ROBERT JOHNSON t'
�� .1:).• 82680 rye
UNIT TOTAL
COST COST
Note: The above "Opinion of Probable Construction Cost" is made by an
engineer, not a professional construction estimator. The accuracy of
estimates cannot be guaranteed.
$3
$4,800
$1,300
$675
$240
$7,015