Loading...
HomeMy WebLinkAboutWater and Wastewater Capacity Letterr p Bury +Partners ENGINEERING SOLUTIONS November 17, 2009 Mr. Alan Gibbs, P.E. City of College Station Department of Development Engineering 1101 Texas Avenue College Station, Texas 77840 Re: HEB College Station No. 2 Retail Project Lots 13A and 13C, Block 3, Phase 3 Tower Point Subdivision West Quadrant State Highways 6 and 40, College Station Texas 77845 Water and Wastewater Capacity Letter Dear Mr. Gibbs: Project No.: 50001 -504 We submit this letter as a component of the Site Plan and Development Permit Applications for the College Station Retail Project proposed within the Tower Point Subdivision. Review of the Waterline and Sanitary Sewer Reports as prepared by Walter P. Moore & Associates, Inc. for the Tower Point Infrastructure Development dated November 11, 2009, indicates that there will be sufficient capacity to support development of Lots 13A and 13C as proposed within this submittal. Further review of the water report indicates that the looped water main within Lots 12 and 13C provides sufficient pressure and capacity for the HEB store including the adjacent retail spaces. The proposed sanitary sewer system for the development is designed for a peak capacity of 34.5 acres of land including the lots associated with this project. Should you have any questions, do not hesitate to contact this office. Sincerely, Michael E. Sharp Project Manager I: \001 \504 \Letters \111809 Gibbs.doc.mes.mm Austin • Dallas • Houston • San Antonio • Temple, Texas Fairfax • Williamsburg, Virginia BURY +PARTNERS -SA, INC. 922 Isom Road, Suite 100 San Antonio, Texas 78216 TEL (210) 525 -9090 FAX (210) 525 -0529 www.burypartners.com Witness Aaron Matthews Location William D Fitch Nozzle size 2.5 Flow hydrant R -036 Pitot reading 65 G.P.M. 1350 Static hydrant R -014 Static PSI 88 Residual PSI 88 Comments College Station Utilities Reliable, Affordable, Community Owned Date Tuesday Sept. 22, 2009 Time 1:00 p.m. Test completed by Justin Tamplin Date Time Test completed by Justin Tamplin Witness Location Nozzle size Flow hydrant R -030 Pitot reading 90 G.P.M. Static hydrant R -029 Static PSI Residual PSI 100 Comments falf College station Utilities Re liable, Affordable, Community Owned Tuesday Sept. 22, 2009 1:15 p.m. Aaron Matthews William D. Fitch Pkwv 2.5 1590 100