Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Site Plan Application
jp 0," CITY OF COLLEGE STATION Home of Texas AcrM University' SITE PLAN APPLICATION GENERAL MINIMUM SUBMITTAL REQUIREMENTS: ( ' $668 Site Plan Application Fee. P $250 Non - Residential Architectural Standards Building Review Application Fee (if applicable). $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 0.75% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). V Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. V Fourteen (14) folded copies of site plan. V One (1) folded copy of the landscape plan. One (1) copy of the following for Non - Residential Architectural Standards building review or Northgate Building Review (if applicable). ©' Building elevations for all buildings. Rr A list of building materials for all facade and screening. [� Color samples for all buildings or list colors to be used from the approved color palette. g Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ]- Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). 17? Notice of Intent (NOI) if disturbed area is greater than five (5) acres cumulatively. Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). -H' Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of approval (if applicable). The attached Site Plan Non - Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT HEB Retail Project ADDRESS TBD LEGAL DESCRIPTION (Lot, Block, Subdivision) Lots 13A & 13C, Block 3, Phase 3 of Tower Point Subdivision APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Mark R. Johnson E -mail mjohnson@burvpartners.com Street Address 922 Isom Road. Suite 100 City San Antonio State Texas Zip Code 78216 Phone Number (210) 525 -9090 Fax Number (210) 525 -0529 PROPERTY OWNER'S INFORMATION: Name Mike Coontz / College Station Market Place, L.P. E -mail mcoontz @weinerdevelopment.com Street Address 520 Post Oak Blvd. Suite 880 city Houston State Texas Zip Code 77027 Phone Number (713) 554 -7608 Fax Number (713) 623 -0178 10/09 IA pDGUV S SU ttil RASTRUCVV t So t 4 I PS F Page 1 of 9 ARCHITECT OR ENGINEER'S INFORMATION: Name Kurt Vandewalle / HEB Grocery Company, L.P. Street Address 646 S. Main, South Bldg. 1st Floor city San Antonio State Texas Phone Number (210) 938 -8892 OTHER CONTACTS (Please specify type of contact): Name Kathy Strimple PE / HEB Grocery Company , L.P E -mail strimple.kathy @heb.com Street Address 646 South Main, South Bldg. City San Antonio Phone Number (210) 938 -8892 Current zoning C -1 Present use of property Vacant Proposed use of property Commercial Retail Number of parking spaces required 58 Number of parking spaces proposed Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? MULTI - FAMILY RESIDENTIAL Total Acreage Floodplain Acreage Housing Units # of 1 Bedroom Units # of 2 Bedroom Units # of 3 Bedroom Units # of 4 Bedroom Units FOR 2 BEDROOM UNITS ONLY # Bedrooms = 132 sq. ft. # Bedrooms < 132 sq. ft. * Projects that were vested prior to January 1 Code may be assessed a different amount. PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) # of Multi- Family Dwelling Units X $1646 = $ # of acres in floodplain # of acres in detention # of acres in greenways Date dedication approved by Parks & Recreation Advisory Board COMMERCIAL Total Acreage 3.87 Acres Building Square Feet 14,400 Sf Floodplain Acreage 0 , 2008, per Chapter 245 of the Texas Local Govemment Please contact city staff for additional information. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. Signature and title 10/09 Fax Number • State Texas Fax Number (210) 938 -8091 Date E -mail vandewalle.kurt @heb.com Zip Code 78204 (210) 938 -8091 Zip Code 78204 ‘) 180 �7j Yes El No Page 2 of 9 ENGINEERING CERTIFICATIONS (required for development in Special Flood Hazard Areas): A. I, 41/ ( 7 "Z J , certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 -year storm. � C. 10/09 Engineer Engineer B. I, l'i 1 `' j P . V �' /7 `1 J , certify that the finished floor elevation of the lowest floor including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and map, as amended. 1, f `Z °l i/f j A /"t s4 , certify that the alterations or development covered by this permit shall not diminish the flood - carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodway fringes. Date Date Date D. I, 4414 Q h 1 1 ei , certify that the proposed alterations do not raise the level of the 100 -year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Conditions or comments as part of approval: Date ///777 //o Page 3 of 9 10/09 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no work is commenced within 24 months of issuance. 6. Applicant is hereby informed that other permits may be required to fulfill local, state, and federal regulator requirements. 7. Applicant hereby gives consent to the City representatives to make reasonable inspections required to verify compliance. 8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 9. I, THE OWNER, CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. (-41A4, er,44; Property Owner(s) GENERAL PROVISIONS FOR DEVELOPMENT PERMIT ACKNOWLEDGMENTS (required for all development): Date 1. agolk � C 41A.�.t.s k- E l I i s w , thelowner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. Date 1 1-7. 2. I , 2 ((cS Vil■svv— , certify that all necessary State and Federal permits will be obtained prior to construction. ,/__ L ,.,? -09 �.'�'^• �`� A..y`�+� �.� l 1 perry Owner(s) Date 3' , e,\vY A. 1\ i s ue, fa. , the Owner, authorize release of plans toS PA w (a I-4s 5 for bidding purposes only. I understand that final approval and release of plans for construction is contingent on contractor signature on approved Development Permit. Pr perry Owner(s) Date Page / of 9