Loading...
HomeMy WebLinkAboutCost EstimateBASE BID - WATERLINE 1 1 LS General Overhead for all Work Including Mobilization, Bonds, Insurance, and Related Items $2,450.00 $2,450.00 2 122 LF 6" Water Line, AWWA C900 Class 200 PVC with Detector Tape and Tracer Wire in Trench (48" Min Cover) $25.00 $3,050.00 3 1 EA 6 "X6" DI Tee $350.00 $350.00 4 I EA 6" Isolation Gate Valve wth AMPRO USE, LL526 Lockable Lid or Equivalent Approved by City $1,250.00 $1,250.00 5 1 EA Tie into Existing 8" PVC Waterline with 8 "X6" DI Tee; complete in place $2,000.00 $2,000.00 6 1 EA Tie into Existing 12" PVC Waterline with 6" Tapping Sleeve & Valve; complete in place $3,600.00 $3,600.00 7 2 EA Fire Hydrant Assembly $3,200.00 $6,400.00 ITEM NO. Estimated Quantity DESCRIPTION UNIT PRICE AMOUNT THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF: REVIEW 11/22/2011 45:;) UNDER THE AUTHORITY OF ADAM J. BRUMBAUGH, P.E. 108506 IT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING PRUPOSES. ESTIMATE OF PROBABLE COST Aerofit Wellness Center Public Waterline Improvements JC PROJECT NO. C0007 -001 TOTAL: NOTES: 1. This estimate represents my best judgment as a design professional familiar with the construction industry. Jones & Carter, Inc. has no control over the cost of labor, materials, or equipment; over the Contractor's methods of determining bid prices; or over competitive bidding or market conditions. Accordingly, we cannot and do not guarantee that bids will not vary from this cost estimate. $19,100.00