Loading...
HomeMy WebLinkAboutCERTIFICATE OF OCCUPANCY City of College Station 1101 TEXAS AVENUE COLLEGE STATION TX 77840 T E M P O R A R Y C O T E M P O R A R Y Issue Date 8/03/04 Expiration Date . . . 9/03/04 Parcel Number 144500 - 0004 -0010 Property Address . . 405 CROSS ST COLLEGE STATION TX 77840 Subdivision Name . . . BOYETT Legal Description . . . BOYETT, BLOCK 4, LOT 1 -3 & 14- 16 Property Zoning . . . HISTORIC NORTHGATE Owner Contractor CAMDEN 713 354 -2500 Application number . . 03- 00003629 000 000 Description of Work . . RESIDENTIAL, 5+ UNITS NEW Construction type . . . COMBUSTIBLE (PROTECTED) Occupancy type . . . . RESIDENTIAL - MULTI - FAMILY Flood Zone Special conditions . COMPLETE STREET REPAIRS NEED BACKFLOW REPORT ON DOMESTIC WATER NEED KNOX BOXES ON GATES / DOORS GATES ON PARKING AREA MAY NOT BE CLOSED UNITL KNOX BOXES ARE PROPERLY INSTALLED SITE CLEAN AND FREE OF CONSTRUCTION DEBRIS, EQUIPMENT, JOB, SHACKS, SAND DIRT, ETC. DUMPSTER ENCLOSURE CLEANED OF ALL CONSTRUCTION DEBRIS BIKE RACKS INSTALLED IN APPROVED LOCATION GRATES ON SIDEWALK OPENINGS NEED TO BE INSTALLED Approved C _A , � / C t_ �r•, nn Buil I.- in Official VOID UNLESS SIGNED BY BUILDING OFFICIAL `) 5 Checklist for C.O. P . lic Works: 1/4 �( � � o mplete sidewalks �� �`� S(- v\- v � Complete street repairs � < �� (Jd- Straighten fire hydrant \'� C, -place F/H valve box w/ adjustable box Remove and replace handicapped ramp and approx. 200 sf stamped walk, does not meet TAS .complete relocation and installation of sewer main cleanout (All of these items can be bonded and need not hold up the CO. Need cost estimate for these items so City Engineer can review to determine bond amount. After 2 weeks the City must be able to cash in the bond and contract for the remaining work to be completed.) San �Btr r�ipster enclosure gates must meet specs. Utilities: wed backflow reports on�omestic water fire sprinkler system, and lawn irrigation. " +oak_ ( cc( ' Fir rm system needs to be up and running & final tested '`Need final test and approval of dry sprinkler system 1%"1 ed final test and approval of wet sprinkler system Need knox boxes on gates / doors Fire lane through parking area Building: Final building inspection has not been requested or performed Need one designated Handicapped unit Pla Wing: 171,k landscape installed (can be bonded with 150% of bid) i e clean and free of construction debris, equipment, job shacks, sand, dirt, etc. Development, construction, finance signs removed One way traffic flow marked on pavement >ka •C 1 medil Cii 0-q -, ou.t_ I 0 a/td, 00" & �� ( �� Checklist for C.O. Public Works: Complete sidewalks Complete street repairs Straighten fire hydrant Replace F/H valve box w/ adjustable box Remove and replace handicapped ramp and approx. 200 sf stamped walk, does not meet TAS Complete relocation and installation of sewer main cleanout (All of these items can be bonded and need not hold up the Co. Need cost estimate for these items so City Engineer can review to determine bond amount. After 2 weeks the City must be able to cash in the bond and contract for the remaining work to be completed.) Sanitation: Dumpster enclosure gates must meet specs. Utilities: * *Need backflow reports on domestic water, fire sprinkler system, and lawn irrigation Fire: * *Alarm system needs to be up and running & final tested * *Need final test and approval of dry sprinkler system * *Need final test and approval of wet sprinkler system Need knox boxes on gates / doors Fire lane through parking area Building: Final building inspection has not been requested or performed Need one designated Handicapped unit Planning: Need landscape installed (can be bonded with 150% of bid) Site clean and free of construction debris, equipment, job shacks, sand, dirt, etc. Development, construction, finance signs removed One way traffic flow marked on pavement INSPECTION CHECKLIST — FOR CERTIFICATE OF OCCUPANCY Multi - Family and Commercial Projects Planning & Development Engineering Items (Exterior) • All pavement must be in — especially around perimeter. • All curbing must be installed, including edges of future phases. • All parking spaces must be striped, including handicap spaces. • Spot check dimensions of spaces and circulation aisles. (9'x18' with 2' overhang or 9'x 20' without overhang; 2 -way circulation aisles must be 23' wide; 1 -way can be 20'wide) • All islands must be curbed raised, and either planted or bricked (decorative pavers, stamped colored concrete O.K.) and located as shown on approved plans. • The Dumpster screening must be installed as shown on approved plans. • The landscaping must be installed and appear to be similar to approved plan. • The site must be clean and free of construction debris, equipment, job shacks, sand, dirt, etc. • The development, construction and finance signs must be removed. • The adjacent lots disturbed during construction must be returned to original conditions (graded, seeded or sodded, debris removed) . • Handicap ramps must be installed. • Handicap signs must be installed. • Fire lanes must be painted in locations shown on approved plan. • Detention with groundcover must be installed and located as shown on approved plan. Look to see if water can get into and out of the pond per the approved plans. • If grass is the ground cover to be used for general landscape and detention requirements, the sod must be installed or there must be evidence that the area has been seeded or hydromulched. IF ANY OF THE ITEMS HAVE NOT BEEN COMPLETED, PLEASE CONTACT THE ASST. DEVELOPMENT MANAGER IN CHARGE OF THE PROJECT AT 979.764.3570 From: Mark Smith To: Natalie Ruiz Date: 7/29/2004 12:59:10 PM Subject: Cross Street Warehouse The following list was sent to me by John Logan. complete sidewalks complete street repairs straighten fire hydrant replace F/H valve box w/ adjustable box remove and replace handicapped ramp and approx. 200 sf stamped walk, does not meet TAS complete relocation and installation of sewer main cleanout All of these items can be bonded and need not hold up the CO. I would like for the developer to provide us with a cost estimate for these items so I can review it before the bond amount is determined. Also, I think that there should be a time limit on the completion of these items. 2 weeks seems reasonable to me. After 2 weeks the City must be able to cash in the bond and contract for the remaining work to be completed. Mark Smith Director of Public Works 979 - 764 -3690 CC: Glenn Brown; John Logan From: Anthony Hamilton To: Mandi Alford Date: 7/29/2004 10:38:48 AM Subject: Re: Cross Street Warehouse We will need the backflow reports on domestic water, fire sprinkler system, and lawn irrigation. The first two being the most important. »> Mandi Alford 7/29/2004 9:20:25 AM »> 405 Cross St Wants to be ok'd for there ribbon cutting on exterior and partial first floor. Any Issues??? Thanks Mandi Alford Customer Service Rep. Development Services City of College Station www.cstx.gov CC: Devel Service Front Counter; Jennifer Prochazka; Peter G Garcia Page 1 of 1 Jennifer Prochazka - Re: Cross Street Warehouse SSSr. "inESn`H & w'ti'm%. oYwm'Yad4Yb*vcS's °soh yfkwSa"d tP,` mal `5°.'i:% \i =x'R' N m_h:yx , ?s.- .t -, ?._` ' 1:.`. K .w.- ,+ ••.'... ..S ..as. ,; NMIIMINSOMTMOOPM From: Natalie Ruiz To: Mandi Alford Date: 7/29/2004 10:13 AM Subject: Re: Cross Street Warehouse CC: Jennifer Prochazka Jennifer P.'s working on this one. Natalie Thomas Ruiz, AICP Development Manager City of College Station Phone (979) 764 -3570 Fax (979) 764 -3496 nru iz @csbcgov www.cstx.gov College Station. Embracing the Past, Exploring the Future. »> Mandi Alford 7/29/2004 9:20:25 AM »> 405 Cross St Wants to be ok'd for there ribbon cutting on exterior and partial first floor. Any Issues ? ?? Thanks Mandi Alford Customer Service Rep. Development Services City of College Station www.csbc.gov file: / /C:\ Documents %20and %20Settings \jflanery \Local %20Settings \Temp \GW} 00002.HTM 7/29/2004 From: Bridgette George To: JProchazka Date: 7/29/2004 9:03:11 AM Subject: Fwd: Re: Cross Street Warehouse Apts in NG Bridgette George Asst. Development Manager City of College Station P.O. Box 9960 College Station, TX 77842 -9960 979.764.3570 bgeorge @cstx.gov www.cstx.gov »> Anthony Hamilton 7/28/2004 11:30:24 AM »> We will need three reports on backflow preventers !. Fire line 2. Domestic water 3. Irrigation I left info on general and fireline testers, they are working on the domestic and irrigation »> Bridgette George 7/27/2004 2:54:20 PM »> Good afternoon! They're getting close to requesting a CO, please let me know of any outstanding issues. Thanks! Bridgette George Asst. Development Manager City of College Station P.O. Box 9960 College Station, TX 77842 -9960 979.764.3570 bgeorge(a cstx.gov www.cstx.gov From: Bridgette George To: JProchazka Date: 7/29/2004 9:02:52 AM Subject: Fwd: Re: Cross Street Warehouse Apts in NG Bridgette George Asst. Development Manager City of College Station P.O. Box 9960 College Station, TX 77842 -9960 979.764.3570 bgeorge @cstx.gov www.cstx.gov »> John Logan 7/28/2004 7:47:41 AM »> Good Morning, at this time the contractor is placing sidewalks. The street needs repairing as the damage is getting worse. I estimate a week to finish the walks and 10 days total to finish all work needed for their letter of completion. From: Bridgette George To: JProchazka Date: 7/29/2004 9:02:39 AM Subject: Fwd: Cross Street Warehouse Apts in NG. Bridgette George Asst. Development Manager City of College Station P.O. Box 9960 College Station, TX 77842 -9960 979.764.3570 bgeorge @cstx.gov www.cstx.gov »> Wally Urrutia 7/27/2004 4:52:47 PM »> I met with the Superintendent at the location this morning to look at the enclosure gates. They are not up to spec. and discussed with him on what needs to be done. The enclosure gates are not wide enough for our vehicle, so they will be working on widening the gates for us. I will check back with them on Thursday and Friday this week and give you an update. thanks, "Keep Your Chin Up, Someone Cares About You" Wally Urrutia Solid Waste Foreman Public Works (979) 764 -3698 Fax (979) 764 -3489 W u rrutia (a� cstx. gov