Staff reviewed the above - mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information for further staff review:
One (1) revised site and landscaping plan;
Parkland Dedication fees are due prior to the issuance of a building
permit;
Easement Dedication Sheet and required documents.
Please note that the Easement Dedication Sheet and the necessary documents are
required prior to the issuance of a building permit. If there are comments that you are
not addressing with the revised site plan, please attach a letter explaining the details. If
you have any questions or need additional information, please call Jennifer Prochazka
at 979.764.3570.
Attachments: Staff review comments
Easement Dedication Sheet
cc: Hill & Frank; Via fax 713.877.1276
Kim Foutz; Economic Development, Via fax 764.6377
Case file #03- 00500241
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 1
Project: CROSS STREET WAREHOUSE (SDSP) — 03- 00500241
PLANNING
1. All plans must include the following in the title block:
• Name, address, location and legal description of project.
• Name address and telephone number of applicant / developer / owner / architect
/ engineer
• Total site area
• Date of submittal
2. Please provide the ownership and current zoning of parcel and all abutting parcels
on the site plan.
3. If the property is not within the 100 year flood plain, please note this on the site plan
and provide the FEMA / FIRM map number that verifies this.
4. Please show location of all meters, including irrigation and locate building
transformer location. All utility connection points and transformers must be
screened from the right -of -way and adjacent properties.
5. Please show color and design specs of proposed gates.
6. Please show the location of the closest fire hydrants.
7. Where is the Fire Department Connection (FDC) located?
8. Please state the density and Floor Area Ratio (FAR) of the proposed project on the
site plan.
9. Please provide a sanitary sewer and water legend to include water demands and
sewer loading on the site plan.
10. Please indicate the material of the proposed sidewalks. The Northgate Design
Guidelines encourage the use of stamped dyed concrete that resembles brick
pavers. (There are City specs available)
11.1 show a larger right -of -way than 50 ft. on College Main. I also show a slightly
different right -of -way width on Tauber. Can you please verify.
12.An end island is required at the end of every parking row. The plan is currently not
showing an end island at the northern end of the parking row adjacent to the pool.
This island needs to be 180 sf minimum. You may loose a parking space because
of this.
13. Please dimension a typical parking space (including length) and any that are not
typical. (including those shown to be located on adjacent property.)
14. Please provide more information on the site plan for the off site parking area.
Please insure that all minimum parking lot standards are met including drive aisle
width requirements, driveway width, etc. The off -site parking may need to be 90
degree parking to eliminate backing maneuvers onto Tauber.
15.Three dumpsters will be required for this project (1/16 units). Please dimension the
dumpster pads (12' x12' minimum) and provide a detail for the enclosure. Include
information regarding dimensions and approach areas for sanitation.
16.A private access and parking easement will be required for the proposed shared
access and off site parking.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 5
17. Please dimension the drive aisle width to show where this measurement is taken
from.
18. Please dimension the driveway width to show if you are measuring face of curb or
back of curb.
19. Please call out the driveway radius. (should be between 20' and 30' for multi - family
residential.)
20.Any parking island that does not include grass must include enhanced paving.
Please provide a detail of the enhanced paving for any island that is not grass.
Please also clearly call out all sodded areas.
21.A PIP will be required for all plantings and architectural details located in the ROW.
22. Please call out the size of all existing and proposed utilities.
23.Are any signs proposed at this time? Any future sign proposed will need to be
approved by the Design Review Board.
24. Please show the distance from the proposed curb cut to all existing adjacent and
opposite drive way cuts and streets.
25. Please provide the overall height of the building on the site plan.
26. Please provide details for any streetscape elements such as benches, trash
receptacles, decorative railings, etc.
27. Please show in the concrete paving detail that the concrete is at least 5" thick,
except in all sanitation truck approaches, which must be 6" thick. The concrete curb
detail (in the upper left corner of the page) is not acceptable. Please contact our
department for the approved concrete curb details.
28. Please show the parking lot entrance / exits as one way out to College Main. As
discussed in the Pre Application Conference, there is not enough throat depth off of
College Main for this to be a gated ingress. The College Main curb cut, if gated, will
have to be the egress.
29. Provide a general note that all roof and ground- mounted mechanical equipment
shall be screened from view or isolated so as not to be visible from any public right -
of -way or residential district within 150' of the subject lot, measured from a point five
feet above grade. Such screening shall be coordinated with the building
architecture and scale to maintain a unified appearance.
Reviewed by: Jennifer Prochazka Date: October 8, 2003
L DSCAPING /STREETSCAPING /BUFFER
✓ . Please include a landscape legend that differentiates between the different species
6o • lantings and states their size (in caliper inches for all trees and gallons for
hrubs).
Op . Please note on the site plan that all disturbed earth must be 100% covered with
A established grass or groundcover prior to C.O.
,+ Vi a . Please provide an irrigation plan or note on the site plan that an irrigation plan must
meet all requirements and be submitted to and approved by our department prior to
O.
. Live Oaks must be planted at a minimum of 30 feet behind the street curb. For any
i s 'I that do not currently meet this requirement, I would suggest replacing it with another R approved species of canopy tree. W� a az n , 1412,011±.._ 1 ,
, .0----i tuk sd
NOTE: Any changes made to the plans, that have not been requested by the City of College Stafion, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed ou
to the City, will constitute a completely new review.
Page 3 of 5
as/Please dimension the area between the parking spaces and the proposed
^ t J vegetation. 2 -feet is required between parking and landscape areas to ensure that
�wthe vehicles do not disturb plantings.
35. Please show that all utility connection points, dumpsters, any untreated concrete,
and any other visually offensive areas are properly screened.
Reviewed by: Jennifer Prochazka Date: October 8, 2003
ENGINEERING
1. Construction drawings show connection to an "existing 12 -in water line" along Cross
Street. That line is 2 -in. It appears this project must extend a water line from the
existing 12 -in line along College Main to the subject tract. Please note, a fire flow
calculation must be performed to ensure line size and capacity for this project.
Please contact this office for additional details if needed.
2. Please square sidewalk along Tauber and Cross Street.
3. This project should install a new sewer manhole at the north edge of property. A
private sewer can then be extended from that point on. If the existing sewer
remains, it is a part of the public system and would involve easement dedication
and, if replaced, would have to conform to TCEQ standards. Please ensure the 6"
has capacity for this project.
4. Please see the City's Drainage Policy and Design Standards. Is this Site Plan
accommodating compliance with regulations?
Reviewed by: Spencer Thompson Date: October 16, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2001 version of plat and /or site plan.
email to rbolin @cstx.gov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
9. Developer responsible for cost of relocation of existing overhead electric lines.
Reviewed by: Ronnie Bolin Date: 10 -20 -03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 4 of 5
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a
Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow
Device, and installed as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 5 of 5
(k0
Reply To Staff review Comments No. 1 2: g pnt
Planning E , 2-4/1
1. Title block added to sheets.
2. Added to site plan sheet A2.
3. Note added to A2.
4. Meter locations added to A2 and more to civil drawings plan and details. A backflow preventer
and meter for irrigation has been added.
5. Fence & Gate elevation added to A2. Colors to be submitted later.
6. Existing fire hydrants added to A2.
7. FDC added to A2 and civil drawings. See civil sheets 5 and 8 details.
8. FAR added to A2.
9. Legend added to El and P5.
10. Added to A2.
11. Added to A2 and civil. The surveyor has verified that the ROW's shown are correct.
12. End island is not desired - we are requesting a variance from this requirement.
13. Dimensions added to A2.
14. Off site parking area revised and details on Al and civil.
15. Two dumpsters added to one existing for a total of three.
16. Easement is in place for the shared off site parking.
17. Dimensions added to A2.
18. A2
19. A2
20. The walks in the islands will have enhanced paving. Note added to A2.
21. PIP to be provided.
22. Sizes are on civil drawings.
23. Signs to be approved before installation.
24. A2
25. Added to A2.
26. Details will be included on landscape plans.
27. Added to civil paving details.
28. Added to A2.
29. Added to A2.
Landscaping/Streetscaping/Buffer
30. Landscape design to be submitted at a later date.
34. Added to A2.
35. All utilities etc. will be screened.
Engineering
1. The water line serving the site is now the 12" water main along College Main. The fire flow
analysis will be forwarded to the City of College Station upon completion.
2. If the site plan were to "square" the sidewalk as requested, the sidewalk would encroach into
the paved travelway of Cross Street. The sidewalk presently follows the existing edge of
pavement along Cross Street as it was found by the surveyor. Without a definitive location for
the edge of pavement, given by the city, we are reluctant to arbitrarily realign the sidewalk.
1 of 2 11/21/2003
Furthermore the present alignment of the sidewalk, while not being perfectly straight, should in
no way interfere with any future improvements of cross street.
3. A proposed sanitary manhole has been added at the north edge of the property.
4. A note has been added to the utility plan assuring compliance with the city's design standards.
Electrical
These notes have been added to the electrical site plan El
Miscellaneous
Backflow preventer added to civil
2 of 2 11/21/2003
• flJL
p rYk-
Reply To Staff review Comments No. 1
0 3
Plannin
i7 Title block added to sheets.
/ Added to site plan sheet A2.
3 •/ Note added to A2.
4,1 7 Meter locations added to A2 and more to civil drawings plan and details. A backflow preventer
/ ' and meter for irrigation has been added.
Fence & Gate elevation added to A2. Colors to be submitted later
6(/ Existing fire hydrants added to A2. — �,'� C' i t 5 � vt u� S `
• FDC added to A2 and civil drawings. See civil sheets 5 and 8 details. — C k((., V / �' kj"-
,,$• FAR added to A2.
9. / Legend added to El and P5.
46. Added to A2.
Added to A2 and civil. The surveyor has verified that the ROW's shown are correct. ?
End island is not desired — we are requesting a variance from this requirement. - g fl bad- d �.� •
. Dimensions added to A2. -- R/Azt Cc t S iciatcal CA ck5 .t o
G ., GC.f I Off site parking area revised and details on Al and civil._ � pa.A'Cd. S
Two dumpsters added to one existing for a total of three. luiliNAVA— ,n� t 17
�C1
Easement is in place for the shared off site parking. /7
L p C 1 Dimensions added to A2. ��
� � A2
8!� A2
p • The walks in the islands will have enhanced paving. Note added to A2.
Vc.7 IP to be provided.
Sizes are on civil drawings.
/ Signs to be approved before installation. (� U3ad L ��
24/ A2 U�
3f5. Added to A2. / 4 / Qa2 / i �
tip Details will be included on landscape plans. 0
�►. Added to civil paving details. —42d
4:.Z Added to A2.
Added to A2. -- V-e circ Unit •
Landscaping/StreetscapingBuffer
30. Landscape design to be submitted at a later date.
3> Added to A2.
35. All utilities etc. will be screened.
Engineering
1. The water line serving the site is now the 12" water main along College Main. The fire flow
analysis will be forwarded to the City of College Station upon completion.
2. If the site plan were to "square" the sidewalk as requested, the sidewalk would encroach into
the paved travelway of Cross Street. The sidewalk presently follows the existing edge of
pavement along Cross Street as it was found by the surveyor. Without a definitive location for
the edge of pavement, given by the city, we are reluctant to arbitrarily realign the sidewalk.
1 of 2 11/21/2003
Furthermore the present alignment of the sidewalk, while not being perfectly straight, should in
no way interfere with any future improvements of cross street.
3. A proposed sanitary manhole has been added at the north edge of the property.
4. A note has been added to the utility plan assuring compliance with the city's design standards.
Electrical
These notes have been added to the electrical site plan El.
Miscellaneous
Backflow preventer added to civil
2 of 2 11/21/2003
CITY OF COLLEGE STATION
‘j DEVELOPMENT SERVICES
1 101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
December 2, 2003
TO: Randy Klein, Via fax 713.782.2626
FROM: Bridgette George, Assistant Development Manager
SUBJECT: CROSS STREET WAREHOUSE (SDSP) - Site Plan
Staff reviewed the above - mentioned site plan as requested. The following page
is a list of staff review comments detailing items that need to be addressed. The
next submittal will be the third and final review by staff for this round of reviews.
If all items have not been addressed on the next submittal, another $200
processing fee will need to be submitted for the subsequent set of three (3)
reviews. Please address the comments and submit the following information for
further staff review:
One (1) complete set of civil construction documents for the
proposed development with the revised site and landscaping plans
attached; and
One (1) copy of the agreement for the offsite parking, access,
dumpster, and electrical transformer
If there are comments that you are not addressing with the revised site plan,
please attach a letter explaining the details. If you have any questions or need
additional information, please call Jennifer Prochazka or Spencer Thompson at
979.764.3570.
Attachments: Staff review comments
cc: Hill & Frank, Via fax 713.877.1276 V
Kim Foutz, Economic Development, Via fax 764.6377
Case file #03- 00500241
Home of Texas A &M University
( A I n \k. t {� I(e
STAFF REVIEW COMMENTS NO. 2
Project: CROSS STREET WAREHOUSE (SDSP) - 03- 00500241
PLANNING
,/ S ince landscape plans required for a complete submittal, a site plan may not
o� p p are re q
// e approved without approved landscape plans and the piptg Sw' t[
e / ,s ✓ ecause the dumpsters face the public right -of -way, screening gates are required.
Iso, a 12x12 space is required for each dumpster; this space m I"- a o erla each
rIGW-
�- - other. Can you move the transformer to get more room? 5 . e. ct.Cal- SU U'u.
,.jhe parallel parking spaces must be a minimum of 9X20 and m et all parking
requirements, including end island requirements (180 s.f. landscaped island at the
end of each parking row). End islands must be 6" raised curb and may not be just
striped. Because of this you may loose one or more of those spaces. (see attached
4 2 ' drawing of area for suggestion on meeting island requirements)
S S \V o request a waiver to the end island requirement (as stated in "Reply to Staff
6 Review Comments No. 1" comment 12) you must go back to the Design Review
Q Qg- ". Board. Is there a way to get the required 180 s.f. between the head -in space and
\Ppa the parallel space? (keep in mind the parallel space needs a 180 s.f. end island
also.) (See attached drawing of area for suggestion of meeting end island
quirements)
j)r(i , ' a will need a copy of a agreement for the offsite rking, cess, umpster, and
Y. onti + � ,/ �e . lectrical transformer. - LAk A' 1 j � (AZ
O� 'ou will find the "Cit of College Station Requirements for Electrical Service"
q
,P1`cfrae ttached. This is a reminder of the requirement for a blanket easement on the
properties. Ronnie Bolin from College Station Utilities has drawn in the approximate
location of the pole on the plans. A photocopy of the location is included in this
emo. A permanent easement will need to be provided for the electric pole,
ransformer, and the line. OIL, ALt. P_JQk,t't,_L-
5 -F/ hen head in parking spaces are only 18 feet in length and abut a sidewalk, the
P 1 !c sidewalk must be at least 6 feet. Parking spaces are measured to face of curb. The
l�.i y n,i ytSiQyis last submittal did not provide any dimensions in the parking area, but when I scaled
p r (,U cLt
e parking spaces and sidewalk it was ok. Did something change? The drive aisle
o has to be 23 feet if you want to play with some of the dimensions.
Line\ Scd r, a re the parking islands (and other unlabeled areas) sod? Please label.
rncv„ed , The site plan shows the irrigation meter on private property. It must either be in the
right -of -way or in an easement.
Reviewed by: Jennifer Prochazka Date: 11 -26 -03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
2 of 3
ENGINEERING
1. Staff can not approve the Site Plan without proper fire flow analysis. Line size,
number of hydrants, location of hydrants, etc must meet be verified by project
engineer and City Staff.
2. According to City data, the hydrant location along Tauber, shown as 46 ft, is
approximately 200 ft. Please note, this project is required to meet City Fire Code
regulations. The project engineer will have to sign and seal an engineering report to
that fact that hydrants provide coverage and flow according to code.
3. It is required of the project engineer to ensure downstream capacity for sanitary
sewage. No capacity information has been provided.
4. Concerning the City's drainage policy. This development project must submit for a
Development Permit as required in the Drainage Policy and Design Standards
(DSDP). The development project must comply with the requirements in the DPDS.
One of the requirements in this area of the City is 100 -yr detention in the Burton
Creek drainage basin. If detention is required by the DPDS the project engineer
must accommodate such on the Site Plan. The Site Plan can not be approved
without drainage analysis and an approved Development Permit.
5. Any and all extensions of public infrastructure (water, sewer, storm) must be
accompanied by a plan and profile engineering drawing meeting City specs. This
would be for the domestic /fire supply up to and including the back flow preventer.
Please see City details for backflow preventer, vault and other items.
Reviewed by: Spencer Thompson Date: December 1, 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
3 of 3
e •
I t_
c X
lU 4-1
11.1 •
, TTe..4 ri,a19 .b
! 1
! L\_.......4, _—
...) ... L ___ i ■ dip _ 1 ... _ .. _ ' ' 0 .3- -
\---r i f '
_ _ _ , i ..:1. j-- 7 /
1 6 ! ) 1...i - 11
-- s:a.., ir -
- ._...-
1 1:
, •i
,
. ,
1-
, 0
,..,9 ■ ,!
4 v
..... I' i .
in r.,
7..... 11 1 ' '3%G14 la == 5 .b r •
1 ii t 1
4 v
........ :I P 1 I Rik is ,c
0
6 a. q e 1
tS
2
pt
/ 1
0
L o 1
6 • -wpm,:
9 1!' i
, I
---
/ t) .51 0 5a0s7
• 0 9
0 0 -
,r) 5
• CV CI •—
—
1 P x
Y c.
.A. .,,...6
in x ci
_
.
( ill .0„, f .C-.9 pp" /
‘).• 11 .o-,ri
. L L
;DE
0 --- • 0 a 0 . ' * _
_ _
GI) F
ill
--
11
P v
i
.;g
-0 ill1111111111111111111111111111111111 p c 11 . ..
._ z al
_ e
ii4M a. al
1 I
a) •i •
IIIIIIIIII I 1
) g •
if gz ,„ • . 1
, • - .
*! b
M z I- m .
'
. §
a. r i
r il g 1 L 6
* ci
— e 1 ;.(1 E
City of College Station
Requirements for Electric Service:
All electric service will be provided underground.
• Electric department personnel have the discretion to provide overhead service if
deemed appropriated.
Developer / Owner is responsible for providing and installing at developers cost:
• Conduits per Electrical Divisions spec and design.
• 30 ft. of rigid conduit for riser poles (install first 10 ft. city will install remainder)
provide weatherhead if secondary riser.
• Concrete transformer pads for commercial and apartment complex projects per city
specs and design.
• Concrete junction box pads per city specs and design.
• Subsurface pull boxes per city spec and design (pull boxes supplied by City).
• Street lighting per city spec and design.
• CT can on building if necessary per city spec and design.
Developer / Owner needs to provide the City of College Station Electric Division with:
• Plat and/or site plan
• Digital (Autocad version) of plat and/or site plan.
E -mail to rbolin @ci.college- station.tx.us
• Electric load data for project (need ASAP transformer delivery is currently 15 to
20 weeks)
40 emporary Blanket easement (see attached form, fill out and return with necessary
paperwork).
• Upon completion of project surveyed sealed meets & bounds descriptive
easements are necessary to release temporary blanket easement.
Electric service will not be energized unless easement form is on file in our
legal department.
Aus / IL 7 ' I /F_c C a 4/ 5* -.4✓ / ,��- G
5 -25-01
Cill WaterisLife
Power is Progress
Service is Pride
P.O. Box 9960 College Station
1601 Graham Road Community Owned Phone: 979 -764 -3660
College Station, TX 77842 FAX: 979 -764 -3452
College Station: Embracing the Past, Exploring the Future
Contacts: Date :
Ronnie Bolin
Electric Planning & Project Coordinator, 979 - 764 -6314 ph.
e -mail, rbolin @cstx.gov 979 -764 -3452 fax
Tony Michalsky
Electric T&D Superintendent, 979 -764 -3438 ph.
email, tmichalsTa?.cstx.gov 979 -764 -3452 fax
We the undersign hereby request the City of College Station Electric Division to:
Business Name
Location
Owner's Name
Billing Address
Phone # Fax #
Estimated Date Needed Complete
We further understand that we are to pay the City of College Station for the total cost (plus sales tax) of services
performed for the following project,
Thank you,
Owner Signature
Mail or Fax (see above for phone # or address)
Home of Texas A &M University
Home of the George Bush Presidential Library and Museum
•
EASEMENT DEDICATION SHEET
To be filled in and submitted with construcdon plans and specifications 6x prelimklary revlew
(Nd to be used where City Is purchasing property)
THIS SECTION TO BE COMPLETED syc.irt STAFF
PROC BY:
DEPT EXT.
REQUESTED BY:.
ACCOUNT NO. P tOJECT NO.
TYPE O 'E 1SEM :
PubIic Utilities.(PUE) Temporary Blanket PUE Electric Only
(prior to tx drug Permit) Water Only
SPECIAL INSTRUCT ON
REVIEW AND APP OVAL 2EQUIREDJGIVEN BY THE FOLLOWING ,Af MENTS
•-••,--
roval Required By , ,.�._..; c ARP i Sy: ' Electric
(please Initial) ; z _. W ter N ( pleease initfal) WaterIWW
,;�,.,...,� As I It gineer AssT City Engineer.
„�,.,;.,�,_P is tllorks ' Public t orks
METES s3< BOUNDS DESC I ECKED FOR CLOSURE BY
ys
THIS SECTION TO BE COMPLETED BY APPLICANT
PROPERTY OWNER(S):
(Names must be exactly as they appea r deed)
ADDRESS: PHONE NUMBER:
LL LENDERS (Please furnish copies of all ken documents): (Names and Addresses)
IF OWNER IS A CORPORATION, PARTNERSHIP, OR JOINT VENTURE (also see #5 below):
1. State of Incorporation/Registration
2. Partners' Names (if applicable)
3. Person Authorized to Sign
(Name and Title)
LEGAL DEPARTMENT MUST BE PROVIDED WITH THE FOLLOWING:
(Please check items that are attached)
1. A copy of a recent (vdthin 90 days) deed or title insurance policy showing the names of the orslowners; and
— 2. For unplatted
property, a signed, sealed and dated metes and bounds description and a dam of the property showing
— the location of the easement; or
3. For property, a ply of the plat the lot, block subdlvieion, and recording Information.
— 4. For nket easements, a signed, sealed and ated metes and bounds deecxiption and :roof of the property.
— 5. Corporate or partnership owners must furnish a copy of a corporate resolution or other proof of authority to sign on behalf of
— the corporation, partnership, or joint venture.
_ 6. Name, address and phone number of person who is to receive the easement and be responsible for getting it executed:
City of' College Station
Transformer Pad Specifications
Concrete Pad F
D
onduit Entry V)
1 ---- - --i - t54,
—G ¢� i i�9 74. 1 61 6, A ttg A —G-- B
Prlrrory Secondary 1
E
1
A------
` C - MOTET All diminsions
are In Inches
1/2' Rebar 18' Center to
Center both ways.
4 1 • • • • • • 8'
' Class 'A' Concrete as
Per City of College
Station Specifications.
Xr MR A B C D E F G WEIGHT
KVA 1NCI -ES INCHES INCHES INCHES INCHES INCHES INCHES
lb.
100 24 11 52 70 10 49 14 1,775
Single •
Phase 167 24 11 54 70 10 49 15 2,205
250 24 11 54 70 10 49 15 2,500
112" 35 15 87 76 21 40 26 3,000
150 35 15 87 90 21 54 26 3,300
225 39 15 91 90 21 54 26 4,565
Three 300 46 15 91 91 21 55 22.5 4,915
Phase 500 46 15 110 105 21 69 32 5,800
750 53 15 110 105 21 69 28.5 8,000
1000 53 15 111 105 21 69 29 9,500
1500 58 15 114 109 25 69 28 11,600
2000 58 15 114 120 25 80 28 15,000
•
.1/ Y a
Cp
---- - - "— * a,
9 -4z ,/ .e.4 p` 9 -7
Sr n A -•_ ` _ . ` L
•
Eil
w
• •� _ �_ •'• •'''• zQ �•,
•
D Z O
G z
•
•
s
7
m
r
z
Mr rte• �1
E r--� (�
` .s. rtv 11 i •• G
c .-:::(#.
- 1
1, _._ v..
■
a
CO
J
O =
U>
a
M .—
Q
X
CO
O
J
N
c o
c v
V G 0.
>
a ,O
. . ..,__ _. E
O
rn
co
c ;o
ta c
p a 0 To
c ` /J 8 c 0
p 0 C
0 t - 0
0 §. N
O .1 0
Z' c
V O co
q 3 0)
Z v
2
Q.
. - - .°
2
c
a
0 0. d 0. .
O i.
J ,,- d N N N h N th to to N U) to to to N to O I-
.+ d 0 7= 0 0 7 0 7 0 0 0 7 0 po 0 p 0 0 O O
O 0 0 :t O d 0 a) O) N 0 0 0 0 0 0 0 d) N c O fn O >
t 2 › Y 0 ccccccccccccccc g > 2 tv
O tl V V ca 0 0 0 CO 0 0 0 0 CO 03 0 CO 0 0 U O C o
Cri ii
c 0 ' th V)� ' U)'E�� --- c a) v o
..i uJ
iiiw22 .- 2222 — 22 2 t- co m J Z