HomeMy WebLinkAboutSTAFF COMMENTS t CITY OF COLLEGE STATION ;I DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 20, 2003 TO: Randy Klein, Via fax 713.782.2626 FROM: Bridgette George, Assistant Development Manager SUBJECT: CROSS STREET WAREHOUSE (SDSP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan; Parkland Dedication fees are due prior to the issuance of a building permit; Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Prochazka at 979.764.3570. Attachments: Staff review comments Easement Dedication Sheet cc: Hill & Frank; Via fax 713.877.1276 Kim Foutz; Economic Development, Via fax 764.6377 Case file #03- 00500241 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: CROSS STREET WAREHOUSE (SDSP) — 03- 00500241 PLANNING 1. All plans must include the following in the title block: • Name, address, location and legal description of project. • Name address and telephone number of applicant / developer / owner / architect / engineer • Total site area • Date of submittal 2. Please provide the ownership and current zoning of parcel and all abutting parcels on the site plan. 3. If the property is not within the 100 year flood plain, please note this on the site plan and provide the FEMA / FIRM map number that verifies this. 4. Please show location of all meters, including irrigation and locate building transformer location. All utility connection points and transformers must be screened from the right -of -way and adjacent properties. 5. Please show color and design specs of proposed gates. 6. Please show the location of the closest fire hydrants. 7. Where is the Fire Department Connection (FDC) located? 8. Please state the density and Floor Area Ratio (FAR) of the proposed project on the site plan. 9. Please provide a sanitary sewer and water legend to include water demands and sewer loading on the site plan. 10. Please indicate the material of the proposed sidewalks. The Northgate Design Guidelines encourage the use of stamped dyed concrete that resembles brick pavers. (There are City specs available) 11.1 show a larger right -of -way than 50 ft. on College Main. I also show a slightly different right -of -way width on Tauber. Can you please verify. 12.An end island is required at the end of every parking row. The plan is currently not showing an end island at the northern end of the parking row adjacent to the pool. This island needs to be 180 sf minimum. You may loose a parking space because of this. 13. Please dimension a typical parking space (including length) and any that are not typical. (including those shown to be located on adjacent property.) 14. Please provide more information on the site plan for the off site parking area. Please insure that all minimum parking lot standards are met including drive aisle width requirements, driveway width, etc. The off -site parking may need to be 90 degree parking to eliminate backing maneuvers onto Tauber. 15.Three dumpsters will be required for this project (1/16 units). Please dimension the dumpster pads (12' x12' minimum) and provide a detail for the enclosure. Include information regarding dimensions and approach areas for sanitation. 16.A private access and parking easement will be required for the proposed shared access and off site parking. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 5 17. Please dimension the drive aisle width to show where this measurement is taken from. 18. Please dimension the driveway width to show if you are measuring face of curb or back of curb. 19. Please call out the driveway radius. (should be between 20' and 30' for multi - family residential.) 20.Any parking island that does not include grass must include enhanced paving. Please provide a detail of the enhanced paving for any island that is not grass. Please also clearly call out all sodded areas. 21.A PIP will be required for all plantings and architectural details located in the ROW. 22. Please call out the size of all existing and proposed utilities. 23.Are any signs proposed at this time? Any future sign proposed will need to be approved by the Design Review Board. 24. Please show the distance from the proposed curb cut to all existing adjacent and opposite drive way cuts and streets. 25. Please provide the overall height of the building on the site plan. 26. Please provide details for any streetscape elements such as benches, trash receptacles, decorative railings, etc. 27. Please show in the concrete paving detail that the concrete is at least 5" thick, except in all sanitation truck approaches, which must be 6" thick. The concrete curb detail (in the upper left corner of the page) is not acceptable. Please contact our department for the approved concrete curb details. 28. Please show the parking lot entrance / exits as one way out to College Main. As discussed in the Pre Application Conference, there is not enough throat depth off of College Main for this to be a gated ingress. The College Main curb cut, if gated, will have to be the egress. 29. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right - of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Jennifer Prochazka Date: October 8, 2003 L DSCAPING /STREETSCAPING /BUFFER ✓ . Please include a landscape legend that differentiates between the different species 6o • lantings and states their size (in caliper inches for all trees and gallons for hrubs). Op . Please note on the site plan that all disturbed earth must be 100% covered with A established grass or groundcover prior to C.O. ,+ Vi a . Please provide an irrigation plan or note on the site plan that an irrigation plan must meet all requirements and be submitted to and approved by our department prior to O. . Live Oaks must be planted at a minimum of 30 feet behind the street curb. For any i s 'I that do not currently meet this requirement, I would suggest replacing it with another R approved species of canopy tree. W� a az n , 1412,011±.._ 1 , , .0----i tuk sd NOTE: Any changes made to the plans, that have not been requested by the City of College Stafion, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed ou to the City, will constitute a completely new review. Page 3 of 5 as/Please dimension the area between the parking spaces and the proposed ^ t J vegetation. 2 -feet is required between parking and landscape areas to ensure that �wthe vehicles do not disturb plantings. 35. Please show that all utility connection points, dumpsters, any untreated concrete, and any other visually offensive areas are properly screened. Reviewed by: Jennifer Prochazka Date: October 8, 2003 ENGINEERING 1. Construction drawings show connection to an "existing 12 -in water line" along Cross Street. That line is 2 -in. It appears this project must extend a water line from the existing 12 -in line along College Main to the subject tract. Please note, a fire flow calculation must be performed to ensure line size and capacity for this project. Please contact this office for additional details if needed. 2. Please square sidewalk along Tauber and Cross Street. 3. This project should install a new sewer manhole at the north edge of property. A private sewer can then be extended from that point on. If the existing sewer remains, it is a part of the public system and would involve easement dedication and, if replaced, would have to conform to TCEQ standards. Please ensure the 6" has capacity for this project. 4. Please see the City's Drainage Policy and Design Standards. Is this Site Plan accommodating compliance with regulations? Reviewed by: Spencer Thompson Date: October 16, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2001 version of plat and /or site plan. email to rbolin @cstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 9. Developer responsible for cost of relocation of existing overhead electric lines. Reviewed by: Ronnie Bolin Date: 10 -20 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 4 of 5 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 5 of 5 (k0 Reply To Staff review Comments No. 1 2: g pnt Planning E , 2-4/1 1. Title block added to sheets. 2. Added to site plan sheet A2. 3. Note added to A2. 4. Meter locations added to A2 and more to civil drawings plan and details. A backflow preventer and meter for irrigation has been added. 5. Fence & Gate elevation added to A2. Colors to be submitted later. 6. Existing fire hydrants added to A2. 7. FDC added to A2 and civil drawings. See civil sheets 5 and 8 details. 8. FAR added to A2. 9. Legend added to El and P5. 10. Added to A2. 11. Added to A2 and civil. The surveyor has verified that the ROW's shown are correct. 12. End island is not desired - we are requesting a variance from this requirement. 13. Dimensions added to A2. 14. Off site parking area revised and details on Al and civil. 15. Two dumpsters added to one existing for a total of three. 16. Easement is in place for the shared off site parking. 17. Dimensions added to A2. 18. A2 19. A2 20. The walks in the islands will have enhanced paving. Note added to A2. 21. PIP to be provided. 22. Sizes are on civil drawings. 23. Signs to be approved before installation. 24. A2 25. Added to A2. 26. Details will be included on landscape plans. 27. Added to civil paving details. 28. Added to A2. 29. Added to A2. Landscaping/Streetscaping/Buffer 30. Landscape design to be submitted at a later date. 34. Added to A2. 35. All utilities etc. will be screened. Engineering 1. The water line serving the site is now the 12" water main along College Main. The fire flow analysis will be forwarded to the City of College Station upon completion. 2. If the site plan were to "square" the sidewalk as requested, the sidewalk would encroach into the paved travelway of Cross Street. The sidewalk presently follows the existing edge of pavement along Cross Street as it was found by the surveyor. Without a definitive location for the edge of pavement, given by the city, we are reluctant to arbitrarily realign the sidewalk. 1 of 2 11/21/2003 Furthermore the present alignment of the sidewalk, while not being perfectly straight, should in no way interfere with any future improvements of cross street. 3. A proposed sanitary manhole has been added at the north edge of the property. 4. A note has been added to the utility plan assuring compliance with the city's design standards. Electrical These notes have been added to the electrical site plan El Miscellaneous Backflow preventer added to civil 2 of 2 11/21/2003 • flJL p rYk- Reply To Staff review Comments No. 1 0 3 Plannin i7 Title block added to sheets. / Added to site plan sheet A2. 3 •/ Note added to A2. 4,1 7 Meter locations added to A2 and more to civil drawings plan and details. A backflow preventer / ' and meter for irrigation has been added. Fence & Gate elevation added to A2. Colors to be submitted later 6(/ Existing fire hydrants added to A2. — �,'� C' i t 5 � vt u� S ` • FDC added to A2 and civil drawings. See civil sheets 5 and 8 details. — C k((., V / �' kj"- ,,$• FAR added to A2. 9. / Legend added to El and P5. 46. Added to A2. Added to A2 and civil. The surveyor has verified that the ROW's shown are correct. ? End island is not desired — we are requesting a variance from this requirement. - g fl bad- d �.� • . Dimensions added to A2. -- R/Azt Cc t S iciatcal CA ck5 .t o G ., GC.f I Off site parking area revised and details on Al and civil._ � pa.A'Cd. S Two dumpsters added to one existing for a total of three. luiliNAVA— ,n� t 17 �C1 Easement is in place for the shared off site parking. /7 L p C 1 Dimensions added to A2. �� � � A2 8!� A2 p • The walks in the islands will have enhanced paving. Note added to A2. Vc.7 IP to be provided. Sizes are on civil drawings. / Signs to be approved before installation. (� U3ad L �� 24/ A2 U� 3f5. Added to A2. / 4 / Qa2 / i � tip Details will be included on landscape plans. 0 �►. Added to civil paving details. —42d 4:.Z Added to A2. Added to A2. -- V-e circ Unit • Landscaping/StreetscapingBuffer 30. Landscape design to be submitted at a later date. 3> Added to A2. 35. All utilities etc. will be screened. Engineering 1. The water line serving the site is now the 12" water main along College Main. The fire flow analysis will be forwarded to the City of College Station upon completion. 2. If the site plan were to "square" the sidewalk as requested, the sidewalk would encroach into the paved travelway of Cross Street. The sidewalk presently follows the existing edge of pavement along Cross Street as it was found by the surveyor. Without a definitive location for the edge of pavement, given by the city, we are reluctant to arbitrarily realign the sidewalk. 1 of 2 11/21/2003 Furthermore the present alignment of the sidewalk, while not being perfectly straight, should in no way interfere with any future improvements of cross street. 3. A proposed sanitary manhole has been added at the north edge of the property. 4. A note has been added to the utility plan assuring compliance with the city's design standards. Electrical These notes have been added to the electrical site plan El. Miscellaneous Backflow preventer added to civil 2 of 2 11/21/2003 CITY OF COLLEGE STATION ‘j DEVELOPMENT SERVICES 1 101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 2, 2003 TO: Randy Klein, Via fax 713.782.2626 FROM: Bridgette George, Assistant Development Manager SUBJECT: CROSS STREET WAREHOUSE (SDSP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) complete set of civil construction documents for the proposed development with the revised site and landscaping plans attached; and One (1) copy of the agreement for the offsite parking, access, dumpster, and electrical transformer If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Prochazka or Spencer Thompson at 979.764.3570. Attachments: Staff review comments cc: Hill & Frank, Via fax 713.877.1276 V Kim Foutz, Economic Development, Via fax 764.6377 Case file #03- 00500241 Home of Texas A &M University ( A I n \k. t {� I(e STAFF REVIEW COMMENTS NO. 2 Project: CROSS STREET WAREHOUSE (SDSP) - 03- 00500241 PLANNING ,/ S ince landscape plans required for a complete submittal, a site plan may not o� p p are re q // e approved without approved landscape plans and the piptg Sw' t[ e / ,s ✓ ecause the dumpsters face the public right -of -way, screening gates are required. Iso, a 12x12 space is required for each dumpster; this space m I"- a o erla each rIGW- �- - other. Can you move the transformer to get more room? 5 . e. ct.Cal- SU U'u. ,.jhe parallel parking spaces must be a minimum of 9X20 and m et all parking requirements, including end island requirements (180 s.f. landscaped island at the end of each parking row). End islands must be 6" raised curb and may not be just striped. Because of this you may loose one or more of those spaces. (see attached 4 2 ' drawing of area for suggestion on meeting island requirements) S S \V o request a waiver to the end island requirement (as stated in "Reply to Staff 6 Review Comments No. 1" comment 12) you must go back to the Design Review Q Qg- ". Board. Is there a way to get the required 180 s.f. between the head -in space and \Ppa the parallel space? (keep in mind the parallel space needs a 180 s.f. end island also.) (See attached drawing of area for suggestion of meeting end island quirements) j)r(i , ' a will need a copy of a agreement for the offsite rking, cess, umpster, and Y. onti + � ,/ �e . lectrical transformer. - LAk A' 1 j � (AZ O� 'ou will find the "Cit of College Station Requirements for Electrical Service" q ,P1`cfrae ttached. This is a reminder of the requirement for a blanket easement on the properties. Ronnie Bolin from College Station Utilities has drawn in the approximate location of the pole on the plans. A photocopy of the location is included in this emo. A permanent easement will need to be provided for the electric pole, ransformer, and the line. OIL, ALt. P_JQk,t't,_L- 5 -F/ hen head in parking spaces are only 18 feet in length and abut a sidewalk, the P 1 !c sidewalk must be at least 6 feet. Parking spaces are measured to face of curb. The l�.i y n,i ytSiQyis last submittal did not provide any dimensions in the parking area, but when I scaled p r (,U cLt e parking spaces and sidewalk it was ok. Did something change? The drive aisle o has to be 23 feet if you want to play with some of the dimensions. Line\ Scd r, a re the parking islands (and other unlabeled areas) sod? Please label. rncv„ed , The site plan shows the irrigation meter on private property. It must either be in the right -of -way or in an easement. Reviewed by: Jennifer Prochazka Date: 11 -26 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 ENGINEERING 1. Staff can not approve the Site Plan without proper fire flow analysis. Line size, number of hydrants, location of hydrants, etc must meet be verified by project engineer and City Staff. 2. According to City data, the hydrant location along Tauber, shown as 46 ft, is approximately 200 ft. Please note, this project is required to meet City Fire Code regulations. The project engineer will have to sign and seal an engineering report to that fact that hydrants provide coverage and flow according to code. 3. It is required of the project engineer to ensure downstream capacity for sanitary sewage. No capacity information has been provided. 4. Concerning the City's drainage policy. This development project must submit for a Development Permit as required in the Drainage Policy and Design Standards (DSDP). The development project must comply with the requirements in the DPDS. One of the requirements in this area of the City is 100 -yr detention in the Burton Creek drainage basin. If detention is required by the DPDS the project engineer must accommodate such on the Site Plan. The Site Plan can not be approved without drainage analysis and an approved Development Permit. 5. Any and all extensions of public infrastructure (water, sewer, storm) must be accompanied by a plan and profile engineering drawing meeting City specs. This would be for the domestic /fire supply up to and including the back flow preventer. Please see City details for backflow preventer, vault and other items. Reviewed by: Spencer Thompson Date: December 1, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 e • I t_ c X lU 4-1 11.1 • , TTe..4 ri,a19 .b ! 1 ! L\_.......4, _— ...) ... L ___ i ■ dip _ 1 ... _ .. _ ' ' 0 .3- - \---r i f ' _ _ _ , i ..:1. j-- 7 / 1 6 ! ) 1...i - 11 -- s:a.., ir - - ._...- 1 1: , •i , . , 1- , 0 ,..,9 ■ ,! 4 v ..... I' i . in r., 7..... 11 1 ' '3%G14 la == 5 .b r • 1 ii t 1 4 v ........ :I P 1 I Rik is ,c 0 6 a. q e 1 tS 2 pt / 1 0 L o 1 6 • -wpm,: 9 1!' i , I --- / t) .51 0 5a0s7 • 0 9 0 0 - ,r) 5 • CV CI •— — 1 P x Y c. .A. .,,...6 in x ci _ . ( ill .0„, f .C-.9 pp" / ‘).• 11 .o-,ri . L L ;DE 0 --- • 0 a 0 . ' * _ _ _ GI) F ill -- 11 P v i .;g -0 ill1111111111111111111111111111111111 p c 11 . .. ._ z al _ e ii4M a. al 1 I a) •i • IIIIIIIIII I 1 ) g • if gz ,„ • . 1 , • - . *! b M z I- m . ' . § a. r i r il g 1 L 6 * ci — e 1 ;.(1 E City of College Station Requirements for Electric Service: All electric service will be provided underground. • Electric department personnel have the discretion to provide overhead service if deemed appropriated. Developer / Owner is responsible for providing and installing at developers cost: • Conduits per Electrical Divisions spec and design. • 30 ft. of rigid conduit for riser poles (install first 10 ft. city will install remainder) provide weatherhead if secondary riser. • Concrete transformer pads for commercial and apartment complex projects per city specs and design. • Concrete junction box pads per city specs and design. • Subsurface pull boxes per city spec and design (pull boxes supplied by City). • Street lighting per city spec and design. • CT can on building if necessary per city spec and design. Developer / Owner needs to provide the City of College Station Electric Division with: • Plat and/or site plan • Digital (Autocad version) of plat and/or site plan. E -mail to rbolin @ci.college- station.tx.us • Electric load data for project (need ASAP transformer delivery is currently 15 to 20 weeks) 40 emporary Blanket easement (see attached form, fill out and return with necessary paperwork). • Upon completion of project surveyed sealed meets & bounds descriptive easements are necessary to release temporary blanket easement. Electric service will not be energized unless easement form is on file in our legal department. Aus / IL 7 ' I /F_c C a 4/ 5* -.4✓ / ,��- G 5 -25-01 Cill WaterisLife Power is Progress Service is Pride P.O. Box 9960 College Station 1601 Graham Road Community Owned Phone: 979 -764 -3660 College Station, TX 77842 FAX: 979 -764 -3452 College Station: Embracing the Past, Exploring the Future Contacts: Date : Ronnie Bolin Electric Planning & Project Coordinator, 979 - 764 -6314 ph. e -mail, rbolin @cstx.gov 979 -764 -3452 fax Tony Michalsky Electric T&D Superintendent, 979 -764 -3438 ph. email, tmichalsTa?.cstx.gov 979 -764 -3452 fax We the undersign hereby request the City of College Station Electric Division to: Business Name Location Owner's Name Billing Address Phone # Fax # Estimated Date Needed Complete We further understand that we are to pay the City of College Station for the total cost (plus sales tax) of services performed for the following project, Thank you, Owner Signature Mail or Fax (see above for phone # or address) Home of Texas A &M University Home of the George Bush Presidential Library and Museum • EASEMENT DEDICATION SHEET To be filled in and submitted with construcdon plans and specifications 6x prelimklary revlew (Nd to be used where City Is purchasing property) THIS SECTION TO BE COMPLETED syc.irt STAFF PROC BY: DEPT EXT. REQUESTED BY:. ACCOUNT NO. P tOJECT NO. TYPE O 'E 1SEM : PubIic Utilities.(PUE) Temporary Blanket PUE Electric Only (prior to tx drug Permit) Water Only SPECIAL INSTRUCT ON REVIEW AND APP OVAL 2EQUIREDJGIVEN BY THE FOLLOWING ,Af MENTS •-••,-- roval Required By , ,.�._..; c ARP i Sy: ' Electric (please Initial) ; z _. W ter N ( pleease initfal) WaterIWW ,;�,.,...,� As I It gineer AssT City Engineer. „�,.,;.,�,_P is tllorks ' Public t orks METES s3< BOUNDS DESC I ECKED FOR CLOSURE BY ys THIS SECTION TO BE COMPLETED BY APPLICANT PROPERTY OWNER(S): (Names must be exactly as they appea r deed) ADDRESS: PHONE NUMBER: LL LENDERS (Please furnish copies of all ken documents): (Names and Addresses) IF OWNER IS A CORPORATION, PARTNERSHIP, OR JOINT VENTURE (also see #5 below): 1. State of Incorporation/Registration 2. Partners' Names (if applicable) 3. Person Authorized to Sign (Name and Title) LEGAL DEPARTMENT MUST BE PROVIDED WITH THE FOLLOWING: (Please check items that are attached) 1. A copy of a recent (vdthin 90 days) deed or title insurance policy showing the names of the orslowners; and — 2. For unplatted property, a signed, sealed and dated metes and bounds description and a dam of the property showing — the location of the easement; or 3. For property, a ply of the plat the lot, block subdlvieion, and recording Information. — 4. For nket easements, a signed, sealed and ated metes and bounds deecxiption and :roof of the property. — 5. Corporate or partnership owners must furnish a copy of a corporate resolution or other proof of authority to sign on behalf of — the corporation, partnership, or joint venture. _ 6. Name, address and phone number of person who is to receive the easement and be responsible for getting it executed: City of' College Station Transformer Pad Specifications Concrete Pad F D onduit Entry V) 1 ---- - --i - t54, —G ¢� i i�9 74. 1 61 6, A ttg A —G-- B Prlrrory Secondary 1 E 1 A------ ` C - MOTET All diminsions are In Inches 1/2' Rebar 18' Center to Center both ways. 4 1 • • • • • • 8' ' Class 'A' Concrete as Per City of College Station Specifications. Xr MR A B C D E F G WEIGHT KVA 1NCI -ES INCHES INCHES INCHES INCHES INCHES INCHES lb. 100 24 11 52 70 10 49 14 1,775 Single • Phase 167 24 11 54 70 10 49 15 2,205 250 24 11 54 70 10 49 15 2,500 112" 35 15 87 76 21 40 26 3,000 150 35 15 87 90 21 54 26 3,300 225 39 15 91 90 21 54 26 4,565 Three 300 46 15 91 91 21 55 22.5 4,915 Phase 500 46 15 110 105 21 69 32 5,800 750 53 15 110 105 21 69 28.5 8,000 1000 53 15 111 105 21 69 29 9,500 1500 58 15 114 109 25 69 28 11,600 2000 58 15 114 120 25 80 28 15,000 • .1/ Y a Cp ---- - - "— * a, 9 -4z ,/ .e.4 p` 9 -7 Sr n A -•_ ` _ . ` L • Eil w • •� _ �_ •'• •'''• zQ �•, • D Z O G z • • s 7 m r z Mr rte• �1 E r--� (� ` .s. rtv 11 i •• G c .-:::(#. - 1 1, _._ v.. ■ a CO J O = U> a M .— Q X CO O J N c o c v V G 0. > a ,O . . ..,__ _. E O rn co c ;o ta c p a 0 To c ` /J 8 c 0 p 0 C 0 t - 0 0 §. N O .1 0 Z' c V O co q 3 0) Z v 2 Q. . - - .° 2 c a 0 0. d 0. . O i. J ,,- d N N N h N th to to N U) to to to N to O I- .+ d 0 7= 0 0 7 0 7 0 0 0 7 0 po 0 p 0 0 O O O 0 0 :t O d 0 a) O) N 0 0 0 0 0 0 0 d) N c O fn O > t 2 › Y 0 ccccccccccccccc g > 2 tv O tl V V ca 0 0 0 CO 0 0 0 0 CO 03 0 CO 0 0 U O C o Cri ii c 0 ' th V)� ' U)'E�� --- c a) v o ..i uJ iiiw22 .- 2222 — 22 2 t- co m J Z