Loading...
HomeMy WebLinkAboutSTAFF COMMENTS CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 14, 2003 TO: Greg Taggart, Municipal Development Group, Via fax 693.4243✓ FROM: Bridgette George, Assistant Development Manager SUBJECT: HIGH RIDGE SUBDIVISION (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 27, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, November 6, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college- station .tx. us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call or myself at 764 -3570. Attachments: Staff review comments cc: Phil Kirk, 1351 Earl Rudder Frwy, S., College Station, TX, 77845 -6034 v Case file #03- 00500239 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: HIGH RIDGE SUBDIVISION (FP) - 03- 00500239 ENGINEERING 1. Show Base Flood Elevation. 2. There is already a Lot 3 of High Ridge Subdivision. Rename Lot 3R. 3. The orientation of the 40' diameter access easement on Lot 1R is not shown as it currently exists. Please rectify. 4. Verify the location of the 100 -year flood plain. 5. Under the "Certificate of City Engineer ", please remove Robert Mosley's name and leave a blank. Reviewed by: Carol Cotter Date: October 14, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. email to rbolin @cstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. 9. Developer provides 10' PUE along line @ S41d 38'57" W. 10. Final Plat needs to show all PUE easements covering underground primary lines on Varsity Ford property. (Call College Station Utilities to locate underground Primary) Reviewed by: Ronnie Bolin Date: 10 -8 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 STAFF REVIEW COMMENTS NO. 2 Project: HIGH RIDGE SUBDIVISION (FP) - 03- 00500239 ENGINEERING 1. Remove "Proposed" from the 10' PUE and 20' PUE that will be dedicated with this plat. 2. The Title Block calls out Lot 4R as a 1.47 -acre tract, which is a decimal off what is called on the plat. Please verify. 3. As discussed after the last review, the Flood Plain to be shown on the Plat is the FEMA recognized flood plain that is shown on the FIRM, not a field survey of the Base Flood Elevation. 4. All Tots that have flood plain on them require a to be recorded on the plat. Please add minimum finished floor elevation to Lot 1 R. Reviewed by: Carol Cotter Date: October 29, 2003 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 4, 2003 TO: Greg Taggart, Municipal Development Group, Via fax 693.4243 FROM: Bridgette George, Assistant Development Manager SUBJECT: HIGH RIDGE SUBDIVISION (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for the plat to be filed at the Brazos County Clerk's Office: $200 processing fee for the next round of three (3) staff reviews; One (1) copy of the revised final plat; and, One (1) Mylar original with the appropriate signatures. One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college- station.tx.us If you have any questions or need additional information, please call me at 764.3570. Attachments: Staff review comments cc: Anthony Y. Majors, AT Phil Kirk; 1351 Earl Rudder Frwy, S., College Station, TX, 77845 ` Case file #03- 00500239 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 3 Project: HIGH RIDGE SUBDIVISION (FP) - 03- 00500239 ENGINEERING 1. Remove "Proposed" from the 10' PUE that will be dedicated with this plat. This was previous comment sent back but not addressed. 2. The Title Block calls out Lot 4R as a 1.47 acre tract which is a decimal off what is called on the plat. Please verify. This was previous comment sent back but not addressed. 3. All Tots that have flood plain on them require a minimum finished floor elevation to be recorded on the plat. Add minimum finished floor elevation to Lot 4R. 4. Note 5 — Change LOMAR to LOMR. 5. What is Lot 1P (written below Lot 4R)? Reviewed by: Carol Cotter Date: December 4, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2