Loading...
HomeMy WebLinkAboutSTAFF REVIEW COMMENTS CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 14, 2003 TO: Randy French, Stylecraft Builders, Via fax 690.9069 ` FROM: Bridgette George, Assistant Development Manager SUBJECT: WESTFIELD VILLAGE PH 3 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested but had to stop review due to the following comments that need to be addressed. Please address the comments and submit the following by an established deadline to be scheduled for a future Planning & Zoning Commission meeting: Two (2) copies of the preliminary plat; If you have any questions or need additional information, please call Spencer Thompson at 764.3570. Attachments: Staff review comments cc: Michael McClure, McClure Engineering Inc., Via fax 693.2554 Case file #03- 00500238 * l Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: WESTFIELD VILLAGE PH 3 (FP) - 03- 00500238 ENGINEERING 1. Staff can not review the Final at this time due to the fact that the Preliminary is not effective and some lots do not conform to the PDD requirements. When Staff receives a Preliminary the plat can proceed. Reviewed by: Spencer Thompson Date: October 14, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer installs street lighting per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. email to rbolin@cstx.gov 6. Developer provides temporary blanket easement for construction purposes. 7. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 8. Developer provides following easements. a. 20' commons area as PUE for underground primary. b. 5' easement between lots 5 & 6 on lot 6 block 4. c. 5' easement between lots 10 & 11 on lot 11 block 4. d. 5' easement between lots 25 & 26 on lot 25 block 4 e. 5' easement between lots 9 & 10 on lot 10 block 5. f. 5' easement between lots 3 & 4 on lot 3 block 5. Reviewed by: Ronnie Bolin Date: 10 -8 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 CITY OF COLLEGE STATION ` SERVICES 1 101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 25, 2003 TO: Randy French, Stylecraft Builders, Via fax 690.9069 FROM: Bridgette George, Assistant Development Manager SUBJECT: WESTFIELD VILLAGE PH 3 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, December 1, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for December 11, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised final plat; and, One (1) Mylar original with the appropriate signatures. If you have any questions or need additional information, please call Spencer Thompson at 764.3570. Attachments: Staff review comments cc: Michael McClure, McClure Engineering Inc., Via fax 693.2554 Case file #03- 00500238 Home of Texas A &M University ENGINEERING REVIEW COMMENTS No. 1 1. Provide HEC -RAS file for design of drainage way. See comment #8. Drainage Report shows only outputs. Reviewed by: Spencer Thompson Date: January 12, 2004 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2 CITY OF COLLEGE STATION j DEVELOPMENT SERVICES 1 101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 13, 2004 TO: Randy French, Stylecraft Builders, Via fax 690.9069 FROM: Bridgette George, Assistant Development Manager SUBJECT: WESTFIELD VILLAGE PH 3 (FP) — Construction Documents Staff reviewed the above - mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comment and submit the following information for further staff review and approval of the plans: Two (2) copies of the revised Drainage Report. If you have any questions or need additional information, please call Spencer Thompson or myself at 764.3570. Attachments: Staff Review Comments Cc: Michael McClure, McClure Engineering Inc., Via fax 693.2554 Case file no. 03- 00500238 Home of Texas A85M University 4 STAFF REVIEW COMMENTS NO. 2 Project: WESTFIELD VILLAGE PH 3 (FP) - 03- 00500238 Comments related to construction drawings to be returned separately. ENGINEERING 1. The Preliminary plat shows the CA along Victoria to be PUE also. This is not shown on the Final. Is a PUE needed? 2. The construction plans show a public drainage structure just north of Victoria that needs to be in a drainage easement. The easement can be shown on this plat. 3. If any private improvements are planned in median, irrigation, landscaping, etc., it is recommended to plat this as common area (to be owned and maintained by HOA). Otherwise, a PIP is required. See Building Regulations for PIP information. A bond is required in case City requires removal of improvements. Reviewed by: Spencer Thompson Date: November 24, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2