HomeMy WebLinkAboutRespose to staff commentsSTAFF REVIEW COMMENTS NO. 1
Project: TOWER POINT PH 10A (FP) - 11- 00500182
PLANNING
1. Page 4 of the application needs to be completed with the public infrastructure information. If
preferred, I will amend the submitted application with directions from Kling Engineering.
The public infrastructure portion of the application submitted by Kling was not completed as
Kevin Sullivan with Walter P. Moore submitted separate public infrastructure information on
the construction plans associated with this phase. Please advise if you would like duplicate
applications.
f Proof must be provided, prior to being scheduled for P &Z, that the Mechanic's Lien on the
property is subordinate to all City easements.
Revised title reports have been submitted that removed the mechanics liens as affecting the
property being platted
The Certificate of Ownership and Dedication needs to include greenways. Under the
Certificate of the County Clerk, please revise "Official Records" to "Deed Records ". Also, no
attest is required for the Certificate of the Planning and Zoning Commission.
We have been advised that the dedication language is under consideration by the city and
since there are no greenways, we would prefer to leave the dedication language as is.
Please be advised that on September 1, 1983, with Volume 599, Brazos County renamed
Deed Records to Official Records, therefore, to call them Deed Records would be an
incorrect reference. The "attest" has been removed from the Certificate of Planning and
Zoning Commission.
4. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
5. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
6. The construction documents and reports are still under review and may affect the plat.
Reviewed by: Lauren A. Hovde, Staff Planner Date: December 5, 2011
GINEERING COMMENTS NO. 1
Please verify that additional easement width or adjustments are not needed based on recent
engineering comments on public infrastructure plans.
The following easement is shown on the property according to our GIS system but not
referenced on the plat. Please verify that it is applicable: Public Utility Easement – Vol.670,
P.15.
�3 The proposed 20 -ft PUE located adjacent to Lot 4 must be dedicated prior to the plat being
forwarded to P &Z. The 20 -ft PUE must be dedicated prior to the plat going forward since it is
satisfying the 20 -ft rear lot PUE requirement. The plat will not be in compliance with the
UDO without the dedicated easement. - 646.4 , 20' It ointn Lai- 14
FYI...AII easements outside of these lots supporting public infrastructure must be dedicated
/ prior to issuance of the Letter of Completion.
t
FYI...Infrastructure (i.e. water and sanitary sewer) is required to be extended to all lots prior
07 to filing the final plat.
FYI...The construction documents for public infrastructure must be approved prior to the plat
being scheduled for a P &Z Meeting.
Reviewed by: Erika Bridges Date: 12/5/11
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 2 of 3