Mobilization, Construction Staking & All Required
Testing by Contractor
In -Place Earthwork Embankment Finishing (Topsoil
& Miscellaneous)
4" Thick Reinforced Concrete Sidewalk (Includes
H/C Ramps)
1
25
1,906
LS
CY
SF
$500.00
$4.00
$4.00
$500.00
$100.00
$7,624.00
CD1- 220 - 0446 -E01
Engineer's Cost Estimate
UNIVERSITY OAKS - SECTION TWO
SIDEWALK IMPROVEMENTS
COLLEGE STATION, BRAZOS COUNTY, TEXAS
88583 \ �
-
SIGNAL `
T,.
PAVING IMPROVEMENTS
ESTIMATED CONSTRUCTION COST =
10% CONTINGENCY =
SUB -TOTAL = $8,224.00
GRAND TOTAL = $8,434.53
RME Consulting Engineers
TEXAS FIRM REGISTRATION No. F-4695
POST OFFICE BOX 9253
COLLEGE STATION, TEXAS 77842
OFF/FAX: (979) 764 -0704
E -mail: civil@rmengineer.com
$8,224.00
$210.53
Estimates and projections prepared by RME Consulting Engineers relating to construction costs and
schedules, operation and maintenance costs, equipment characteristics and performance, and operating
results are based on this office's experience, qualifications and judgment as a design professional. Since
RME has no control over weather, cost and availability of labor, material and equipment, labor
productivity, construction contractor's procedures and methods, unavoidable delays, construction
contractor's methods of determining prices, economic conditions, competitive bidding or market
conditions and other factors affecting such estimates or projections, this office does not guarantee that
actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by
the Engineer of record.