Loading...
HomeMy WebLinkAboutEngineer's Cost Estimate1 2 3 Mobilization, Construction Staking & All Required Testing by Contractor In -Place Earthwork Embankment Finishing (Topsoil & Miscellaneous) 4" Thick Reinforced Concrete Sidewalk (Includes H/C Ramps) 1 25 1,906 LS CY SF $500.00 $4.00 $4.00 $500.00 $100.00 $7,624.00 CD1- 220 - 0446 -E01 Engineer's Cost Estimate UNIVERSITY OAKS - SECTION TWO SIDEWALK IMPROVEMENTS COLLEGE STATION, BRAZOS COUNTY, TEXAS 88583 \ � - SIGNAL ` T,. PAVING IMPROVEMENTS ESTIMATED CONSTRUCTION COST = 10% CONTINGENCY = SUB -TOTAL = $8,224.00 GRAND TOTAL = $8,434.53 RME Consulting Engineers TEXAS FIRM REGISTRATION No. F-4695 POST OFFICE BOX 9253 COLLEGE STATION, TEXAS 77842 OFF/FAX: (979) 764 -0704 E -mail: civil@rmengineer.com $8,224.00 $210.53 Estimates and projections prepared by RME Consulting Engineers relating to construction costs and schedules, operation and maintenance costs, equipment characteristics and performance, and operating results are based on this office's experience, qualifications and judgment as a design professional. Since RME has no control over weather, cost and availability of labor, material and equipment, labor productivity, construction contractor's procedures and methods, unavoidable delays, construction contractor's methods of determining prices, economic conditions, competitive bidding or market conditions and other factors affecting such estimates or projections, this office does not guarantee that actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by the Engineer of record. 1 of 1