Loading...
HomeMy WebLinkAboutLetter of AcknowledgementDecember 30, 2011 7607 Eastmark Drive, Ste. 250 -F <77840> P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 764 -0704 email: civil @rmengineer.com Josh Norton, P.E. Assistant City Engineer City of College Station Planning & Development Services 1101 Texas Avenue South College Station, TX 77842 RE: University Oaks, Section Two (Replat) — Acknowledgement of City Standards RME No. 220 -0446 Josh Norton: The purpose of this letter is to acknowledge that the construction plans for the public infrastructure improvements, for the above referenced project, to the best of my knowledge, do not deviate from the latest B /CS Design Guideline Manual. I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in accordance with the B /CS Standard Details. Please do not hesitate to call if you have any questions. Sincerely, Rabon A. Metcalf, P.E. No. 88583 Texas Firm Registration No. F -4695 rabon rmengineer.com CD 1- 220 - 0446 -L05 Page 1 of 1 G�L EAST TEXAS OFFICE GOOOWIN • LASITER, INC. (9361637-4900 ENGINEERS • ARCHITECTS • SURVEYORS FAX (9361 637-9330 CENTRAL TEXAS OFFICE (9791 S96-6767 FAX (9791 696-2655 January 11, 2012 City of College Station 1101 Texas Avenue College Station, Texas 77842 Attn: Josh Norton, P.E. RE: Letter Acknowledging City Standards Living Hope Baptist Church Driveway - Case File #11-00500204 College Station, Texas Dear Mr. Norton: The purpose of this letter is to acknowledge that the construction plans for the driveway, sidewalk and drainage for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. I also acknowledge, to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. The only detail used that was not located in the City's standard details was for the landscape wall. Sincerely, r............................ John Rusk, P.E. j JOHN RUSK r................... Project Engineer see•.. ......87884 1609 S. CHESTNUT • SUITE 202 •LUFKIN, TEXAS • 75901 • admin@goodwinlasiter.com TSPE #413 3600 ST. HIGHWAY S S. • SUITE 102 • COLLEGE STATION, TEXAS a 77045 • ctex@goodwinlesiter.com W.' 169816980401Co"s1698040. LTR.WZdo EAST TEXAS OFFICE GOODWIN • LASITER, INC. (936) 637-4900 ENGINEERS - ARCHITECTS • SURVEYORS FAX [936) 637-6330 CENTRAL TEXAS OFFICE (979) 696-6767 FAX (9791 696-2665 January 11, 2012 City of College Station 1101 Texas Avenue College Station, Texas 77842 Attn: Josh Norton, P.E. Re: Letter Acknowledging City Standards Jennifer Fredericks Parking Additions - Case File #11-00600186 1261 Barron Road, College Station, Texas Dear Mr. Norton: The purpose of this letter is to acknowledge that the construction plans for the parking and drainage for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual I also acknowledge, to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. Sincerely, John Rusk, P.E. Project Engineer JOHN RUSK 87884 :i¢-. /—//—Zol z._- 1609 S. CHESTNUT • SUITE 202 •LUFKIN, TEXAS • 75901 • admin@,goodwiniasiter.com TBPE #413 3600 ST, HIGHWAY 6 S. • SUITE 102 • COLLEGE STATION, TEXAS • 77B45 • ctex@goodwiniasiter.com W169816960401Cot s1698040.LTR.008cfw