Loading...
HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one -year warranty is hereby affirmed and agreed to by t /Sev Cc.S and by their subcontractors as indicated by signatures below. WORK COMPLETED N - 54 0 5 /Pc7A141—k. (' Owner: A I� r) U tzSq Contractor: EL/ Sec) C7 & b_-- Phone Number: R? 7-9U ()CS-6 "Phone Number: q7q Zz - Ze 1O Address: //7c( D/C Address: 40 0'7 56-40A, Signature: ACCEPTANCE&APPROVAL Jj -e City Representative Revised 1/31/07 Co / Jk (t/ s Let - DATE: - Zv' - I/ RE: COMPLETION OF 0 VC 5�1). Signature: WARRANTY DATE -7_ - t I ilTh( OY NATAL= V � p 2- 7 _OFF'i1TE MATS FILED MAP SWIM EMT NM Orf IR SNITS MOOD Ltd. CIVIL DEVELOPMENT CIVIL ENGINEERING & DESIGN -BUILD SERVICES P.O. Box 11929 • College Station, Texas 77842 • Phone: 979 - 764 -7743 • Fax: 979 -764 -7759 January 17, 2008 Alan Gibbs, P.E. City of College Station P.O. Box 9960 College Station, TX 77842 RE: Sidewalk Improvements 0.26 ac Novosad Tract on Luther Street College Station, Texas Dear Alan: The accompanying drawing is provided for your review and approval. It is a simple drawing showing the planned sidewalk improvements along Luther Street associated with the development of a 0.26 acre tract of land owner by Sandra Novosad. The estimated cost for the sidewalk is $5890 and it is designed in conformance with the BCS Unified Design Guidelines and Standards. To the best of our knowledge, there are no other infrastructure improvements associated with this development. Please feel free to contact us if you have questions. Sincerely Yours, Kent Laza, P.E. Project Manager