HomeMy WebLinkAboutCorrespondenceLJennifer Reeves - Fwd: Rock Pr. Road development proposal Page 1
From: Natalie Ruiz
To: Jennifer Reeves
Date: 2/16/2004 4:11:45 PM
Subject: Fwd: Rock Pr. Road development proposal
FYI
Natalie Thomas Ruiz, AICP
Development Manager
City of College Station
Phone (979) 764-3570
Fax (979) 764-3496
nruiz@cstx.gov
www.cstx.gov
College Station. Embracing the Past, Exploring e Future.
Jane Kee 2/16/2004 3:13:05 PM, >
This what I remember. Before I forward this,/n to the developer, please review and comment.
Zoning recommendation is not
We can require waterlines to meet
order.
We cannot force Wellborn to
PUEs for other services.
BTU can go anywhere if
PUEs with a franchise.
We will require full ROW
the edge of the subdivisi,
collector. We will most I'
that part of it that runs I
when that phase deve F
the utility issue or franchise issue.
standards. If fire flows cannot be met then denial of the plat is in
waterlines in our PUEs or to get a franchise from us. We will require
is a blanket easement. If not, then in a BTU specific easement or in our
Rock Pr. as a major collector and improvements as such (from Greens Pr. to
Developer can ask for a variance to the pavement section to build a rural
support that. If they take NO access from Rock Pr. then they need only build
their development (not all the way to Greens Pr.). This portion would be built
Jennifer Reeves - Fwd: Rock Pr. Road development proposal Page 1
From: Natalie Ruiz
To: Jennifer Reeves
Date: 2/16/2004 4:11:45 PM
Subject: Fwd: Rock Pr. Road development proposal
FYI
Natalie Thomas Ruiz, AICP
Development Manager
City of College Station
Phone (979) 764-3570
Fax (979) 764-3496
nruiz@cstx.gov
www.cstx.gov
College Station. Embracing the Past, Exploring the
Jane Kee 2/16/2004 3:13:05 PM
This what I remember. Before I forward this on to
Zoning recommendation is not affected by the
We can require waterlines to meet our
order.
We cannot force Wellborn to place
PUEs for other services.
BTU can go anywhere if there is a
PUEs with a franchise.
We will require full ROW for
the edge of the subdivision).
collector. We will most likely
that part of it that runs along
when that phase develop
developer, please review and comment.
ity issue or franchise issue.
If fire flows cannot be met then denial of the plat is in
ines in our PUEs or to get a franchise from us. We will require
ket easement. If not, then in a BTU specific easement or in our
Pr. as a major collector and improvements as such (from Greens Pr. to
:loper can ask for a variance to the pavement section to build a rural
ort that. If they take NO access from Rock Pr. then they need only build
development (not all the way to Greens Pr.). This portion would be built