Loading...
HomeMy WebLinkAboutCorrespondenceLJennifer Reeves - Fwd: Rock Pr. Road development proposal Page 1 From: Natalie Ruiz To: Jennifer Reeves Date: 2/16/2004 4:11:45 PM Subject: Fwd: Rock Pr. Road development proposal FYI Natalie Thomas Ruiz, AICP Development Manager City of College Station Phone (979) 764-3570 Fax (979) 764-3496 nruiz@cstx.gov www.cstx.gov College Station. Embracing the Past, Exploring e Future. Jane Kee 2/16/2004 3:13:05 PM, > This what I remember. Before I forward this,/n to the developer, please review and comment. Zoning recommendation is not We can require waterlines to meet order. We cannot force Wellborn to PUEs for other services. BTU can go anywhere if PUEs with a franchise. We will require full ROW the edge of the subdivisi, collector. We will most I' that part of it that runs I when that phase deve F the utility issue or franchise issue. standards. If fire flows cannot be met then denial of the plat is in waterlines in our PUEs or to get a franchise from us. We will require is a blanket easement. If not, then in a BTU specific easement or in our Rock Pr. as a major collector and improvements as such (from Greens Pr. to Developer can ask for a variance to the pavement section to build a rural support that. If they take NO access from Rock Pr. then they need only build their development (not all the way to Greens Pr.). This portion would be built Jennifer Reeves - Fwd: Rock Pr. Road development proposal Page 1 From: Natalie Ruiz To: Jennifer Reeves Date: 2/16/2004 4:11:45 PM Subject: Fwd: Rock Pr. Road development proposal FYI Natalie Thomas Ruiz, AICP Development Manager City of College Station Phone (979) 764-3570 Fax (979) 764-3496 nruiz@cstx.gov www.cstx.gov College Station. Embracing the Past, Exploring the Jane Kee 2/16/2004 3:13:05 PM This what I remember. Before I forward this on to Zoning recommendation is not affected by the We can require waterlines to meet our order. We cannot force Wellborn to place PUEs for other services. BTU can go anywhere if there is a PUEs with a franchise. We will require full ROW for the edge of the subdivision). collector. We will most likely that part of it that runs along when that phase develop developer, please review and comment. ity issue or franchise issue. If fire flows cannot be met then denial of the plat is in ines in our PUEs or to get a franchise from us. We will require ket easement. If not, then in a BTU specific easement or in our Pr. as a major collector and improvements as such (from Greens Pr. to :loper can ask for a variance to the pavement section to build a rural ort that. If they take NO access from Rock Pr. then they need only build development (not all the way to Greens Pr.). This portion would be built