Loading...
HomeMy WebLinkAboutStaff CommentsSTAFF REVIEW COMMENTS NO. 1 Project: ZAPATOS (SDSP) - 04-00500031 PLANNING Please show property lines so that we may ensure that all improvements are on your property.=!' .r , U2-please show Shadow Canyon's building line to ensure that there is adequate room --or the improvements. Y j 3. lease check the building square footage. The dimensions that you have provided do not correspond with the square footage provided. A' Please provide a rendering or photograph (of a similar improvement) so that the ~DRB can approve the aesthetics of the cooler addition. L ".hat material is planned in the windows? t 6. What irrigation is planned for the planted areas? 7. Are the plantings shown on the plan existing or proposed? 8--ls any signage proposed? All signage must be approved by the DRB. ° t-9:' Samples of the "Spanish tile" not submitted. Reviewed by: Jennifer Prochazka Date: 2-17-04 ELECTRICAL 1. If change in electric service, please contact College Station Utilities. Reviewed by: Ronnie Bolin Date: 2-17-04 b MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 1 of 1