Loading...
HomeMy WebLinkAboutCost EstimateOpinion of Probable Construction Costs Chick -frl -A College Station Spring Creek Commons and SH 6, College Station, TX March 11, 2011 Date Prepared: March 11, 2011 Engineer: Bury + Partners - SA, Inc. Project Location: College Station, Texas CATER OEIV�N'�'S � _ __ ' "•, � y � •_ , .� xw �,, , v Consultant's signature � � 1 ........................ Description Otv. Units Unit Price Cost 1 6" Water Line (PVC) 26 LF $60.00 = $1,560.00 2 1 1/2" Water Line (Copper) 5 LF $20.00 = $100.00 3 1" Water Line (Copper) 3 LF $15.00 = $45.00 4 Bends & Fittings (restrained) 0.5 TON $2,500.00 = $1,250.00 5 6" Water Tie -In 1 EA $1,650.00 = $1,650.00 6 6" Gate Valve 1 EA $1,293.00 = $1,293.00 7 1 1/2" Water Meter (Complete) 1 EA $2,000.00 $2,000.00 8 1" Water Meter (Complete) 1 EA $1,200.00 = $1,200.00 9 Total Trench Safety 34 LF $1.00 = $34.00 10 Hydrostatic Test 1 EA $2,300.00 = $2,300.00 11 Chlorination 1 EA $500.00 = $500.00 12 Mobilization 1 LS 10% = $1,193.20 " TOTAL (Water 10proventients) 513,125.20 Note: Actual construction cost can only be provided when bids are received from qualified contractors. Date g� •- v Consultant's signature � � 1 ........................ i I City of College Station I RMANDO J. 'I NIEBLA s .....® ................ .......... z I to I .. ;, _ o Date g�