HomeMy WebLinkAboutCost EstimateOpinion of Probable Construction Costs
Chick -frl -A College Station
Spring Creek Commons and SH 6, College Station, TX
March 11, 2011
Date Prepared: March 11, 2011
Engineer: Bury + Partners - SA, Inc.
Project Location: College Station, Texas
CATER OEIV�N'�'S
� _ __ ' "•,
� y
� •_ , .� xw
�,, ,
v
Consultant's signature � � 1 ........................
Description
Otv.
Units
Unit Price
Cost
1
6" Water Line (PVC)
26
LF
$60.00
= $1,560.00
2
1 1/2" Water Line (Copper)
5
LF
$20.00
= $100.00
3
1" Water Line (Copper)
3
LF
$15.00
= $45.00
4
Bends & Fittings (restrained)
0.5
TON
$2,500.00
= $1,250.00
5
6" Water Tie -In
1
EA
$1,650.00
= $1,650.00
6
6" Gate Valve
1
EA
$1,293.00
= $1,293.00
7
1 1/2" Water Meter (Complete)
1
EA
$2,000.00
$2,000.00
8
1" Water Meter (Complete)
1
EA
$1,200.00
= $1,200.00
9
Total Trench Safety
34
LF
$1.00
= $34.00
10
Hydrostatic Test
1
EA
$2,300.00
= $2,300.00
11
Chlorination
1
EA
$500.00
= $500.00
12
Mobilization
1
LS
10%
= $1,193.20
"
TOTAL (Water 10proventients)
513,125.20
Note: Actual construction cost can only be provided when bids are received from qualified contractors.
Date
g�
•-
v
Consultant's signature � � 1 ........................
i I City of College Station
I RMANDO J.
'I
NIEBLA s
.....®
................ ..........
z I to I .. ;, _ o
Date
g�