Loading...
HomeMy WebLinkAboutDrainage Reporti i C I I Drainage Report for University Heights Subdivision Phase 1 College Station, Texas May, 2011 Encpineer.• SCHULTZ ENGINEERING, LLC. P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764 -3900 Developer: MJBS Holleman, LTD., A Texas Limited Partnership 5704 Travis Green Ln. Austin, TX 78745 (512)413 -8748 I 1 i University Heights, Phase 1 Drainage Report — Executive Summary ENGINEER SCHULTZ ENGINEERING, LLC. P.O. Box 11995 College Station, Texas 77842 Phone/Fax: (979) 764 -3900 1 MJBS Holleman, LTD. A Texas Limited Partnership 5704 Travis Green Ln. Austin, Texas 78745 Phone: (512) 413 -8748 HYDROLOGIC CHARACTERISTICS The existing site is predominately grass prairie. The elevations range from 323 to 314, sloping generally in a southerly direction where the runoff enters the drainage system designed for the Las Palomas ' Subdivision, then into a tributary of Hopes Creek on the tract south of Los Palomas Subdivision. GENERAL STORMWATER PLAN The drainage plan for this development will involve the installation of inlets, junction boxes and storm sewer pipes which will convey the runoff into two different detention ponds. Most of the runoff will ' ultimately be discharged into existing storm sewer outfall in the Las Palomas Subdivision after going through the existing detention pond located at the southwest comer of the University Heights development. i I Page 1 of 8 GENERAL DESCRIPTION AND LOCATION Location: North West of intersection of Holleman Dr. and Paloma Ridge Drive. Description: • Area: • Proposed Land Use: 18.318 acres R -1 - Single Family Residential, and R -3 - Townhouse • # of Lots: 82 lots • Existing Land Use: Vacant • Land Description: Rolling terrain that falls south toward the Los Palomas Subdivision. The site is pasture with some scattered trees. A portion of the site flows into the right of way of Holleman Drive South. Adjoining Land Use: The site is bounded on the south by Las Palomas Subdivision, on the east by Holleman Drive South (open ditch), and on the North by a 20.305 acre tract. To the west are future phases of University Heights. Primary Drainage Facility: Hopes Creek ' Flood Hazard Information: FEMA FIRM. # 48041C0182 D (July 2, 1992) Floodplain: No portion of this Phase lies within the floodplain. HYDROLOGIC CHARACTERISTICS The existing site is predominately grass prairie. The elevations range from 323 to 314, sloping generally in a southerly direction where the runoff enters the drainage system designed for the Las Palomas ' Subdivision, then into a tributary of Hopes Creek on the tract south of Los Palomas Subdivision. GENERAL STORMWATER PLAN The drainage plan for this development will involve the installation of inlets, junction boxes and storm sewer pipes which will convey the runoff into two different detention ponds. Most of the runoff will ' ultimately be discharged into existing storm sewer outfall in the Las Palomas Subdivision after going through the existing detention pond located at the southwest comer of the University Heights development. i I Page 1 of 8 COORDINATION & STORMWATER PERMITTING The project will require that a Notice of Intent be submitted to the Texas Commission for Environmental Quality. No other permits are anticipated for this project. DRAINAGE DESIGN - STORM SEWER ' General Information: Stormwater runoff from Phase 1 of the subdivision will be collected by a storm sewer system that will discharge to the Existing Detention Pond and to the storm sewer system designed in the Los Palomas subdivision or discharge into Detention Pond 2. The runoff will ultimately discharge into a tributary of Hopes Creek. The location of the drainage areas for evaluation of the gutter depth check, 1 inlet sizing and storm sewer pipe evaluation are shown on Exhibit C. Also shown are the location of the inlets, junction boxes and storm sewer pipes. A summary of the drainage areas and design flow values is provided in Appendix B. I Street Design: I I J Standard cross- section (3% cross - slope, 27' B -B residential) Lay down curb & gutter on residential streets Asphalt pavement Standard recessed curb inlets (5', 10' and 15' in length) T, Methodology: TR 55 T. Minimum 10 minutes Design Storm Event: 10 -year - residential street & storm sewer Pipe Materials: Corrugated HDPE w /smooth interior, RCP, Profile Gasket in accordance with ASTM C443, ASTM C76, Class III Manning's n Value: 0.013 or 0.012 for HDPE w /smooth interior Runoff Coefficients: 0.60 for developed lots Design Constraints: Max. water depth in curb = 4.0 in. or 0.33 ft. Min. flow velocity = 2.5 fps Max. flow velocity = 15 fps 100 -yr storm runoff maintained within the ROW (4 inches above curb) 25% Reduction in cross - sectional area of pipes less than 27" in diameter 1 Design Software: I J Excel spreadsheets, Autodesk Civil 3D Storm Sewer Analysis and Hydraflow This software was used to compute pipe capacity, flow rate and velocity through each pipe, and determine hydraulic grade line elevations at each inlet or junction box. All of this information is shown in the summary tables in Appendices C, D, E and F. The College Station requirement for a 25% reduction in cross - sectional area of pipes less than 27" diameter is achieved by using internal pipe diameters that are less than the standard diameter. The 24" diameter pipe areas were reduced by 25% and a 20.6" diameter pipe used in the analysis and the 18' diameter pipe areas were reduced by 25% and a 15.6" diameter pipe was in the analysis. Design Results The data presented in the Appendices indicates the gutter depth, inlet sizing and pipe sizes are in accordance with the requirements of the design guidelines. 1 Page 2 of 8 1 Applicable Exhibits: Exhibit A — Drainage Area Map — Pre - Development Exhibit B — Drainage Area Map — Post- Development Pond Design Exhibit C — Drainage Area Map — Post - Development Appendix A — Technical Design Summary Appendix B — Drainage Area Summary ' Appendix C — Depth of Flow in Gutter Summary Appendix D — Inlet in Sump Design Analysis Appendix E - Inlets on Grade Design Analysis ' Appendix F - Pipe Design Summary DETENTION ANALYSIS & DESIGN General: The stormwater runoff from this subdivision discharges into 4 different outfalls as shown on Exhibit A. The discharge to 3 of these outfalls will be ' affected by the development of Phase 1 of this subdivision. Area 104 which flows to the west will not be disturbed and will be addressed with Phases 2 and 3 developments. There are 2 detention ponds proposed for this site. Refer to Exhibit B for their locations. The existing detention pond was constructed for the Los Palomas Subdivision and will be modified for this development. Detention Pond 2 is located in the north corner of Phase 1 to mitigate the increased runoff which flows into Holleman Drive South and then in a northerly direction. A Portion of Phase 5 may also flow into the roadside ditch of Holleman Drive, additional survey data will be acquired to determine the flow direction in that area. For this report, it is assumed the area flows to the existing detention pond. EXISTING DETENTION POND (RATIONAL EQUATION ANALYSIS): ' General: The Existing Detention Pond was designed using the rational equation methodology. Since the total area of the drainage basin is less than 50 acres, this is in accordance with the BCS Drainage Design Guidelines. T, Methodology: TR 55 T Minimum 10 minutes Design Storm Events: 1, 2, 10, 25, 50 and 100 -year storms— detention analysis ' Pond Discharge Materials: The pond outlet structure discharges into a 4' x 2' concrete box storm sewer Manning's n Value: 0.012 1 Runoff Coefficients: 0.30 — undeveloped property, 0.60 — residential developed property 0.53 — composite C value for area 201 Design Constraints: Post Development flow less than or equal to Pre - Development flow 6" freeboard for 100 year storm with outlet clogged 1 Rational Equation: The rational equation is utilized to determine peak storm water runoff rates for Existing Detention Pond design. ' Q = CIA Q = Flow (cfs) A = Area (acres) C = Runoff Coefficient I = Rainfall Intensity (in/hr) Design Software: Excel spreadsheets, Hydraflow The software was used to compute the pond storage and discharge data and the pre and post development flow and the routing of the flow through the detention ponds. ' Page 3 of 8 Applicable Exhibits: Exhibit A — Drainage Area Map Pre- Development Exhibit B — Drainage Area Map Post- Development Pond Design ' Exhibit C — Drainage Area Map Post- Development Exhibit D — Existing Pond Grading Plan Appendix G — Existing Detention Pond elevation- storage data & elevation - discharge data, pond routing data and pond routing analysis. Design Analysis: A topography survey of the existing pond was performed and there are some differences with the previous design. The pond berm height of 312.0' was not achieved and for this design a berm height of 311.8 was used. Also, the volume of the pond was less than shown in the previous design. Our design indicates that additional volume is needed, therefore the pond is being regraded to increase the volume and also to make a portion of the pond a retention pond. The "V" shaped weir on the existing pond outlet structure is being modified to a 2.5' wide weir. The existing pond also does not have adequate vegetation and this project will include the placement of topsoil and seeding of the pond area. The pond design in this report covers Phases 1, 2 and 3 of the subdivision. Once the design of Phases 4 and 5 are Known, the existing pond will need to be re- evaluated. The pre- and post - development runoff information for the existing detention pond evaluation is shown in Table 1. The pre - development drainage area is shown on Exhibit A. The post- development drainage areas are shown on Exhibit B. The drainage basin is divided into 2 areas, the area that drains from the Los Palomas Subdivision to the outfall without going through the pond and the area that drains into the ' pond. The peak flow out of the detention pond was determined by a Storage Routing Analysis based on the Continuity Equation as follows: ( I1+ 12 ) +((2sl /dt)- 01)= ((2s2 /dt) =02). The time interval, dt, used was 1 minute. The calculations and results of the Storage Routing Analysis were used to generate hydrograph peak flows and graphs for the pre and post development conditions. A summary of the peak flows from the site are shown in Table 2. The runoff hydrographs from these 2 areas were combined and the resulting peak flow is also shown in Table 2. The runoff that leaves this site is referred to as the " Outfall" in Table 2. LJ 1 I 1 I I� I TABLE i — Pre- & Post - Development Runoff Information — Detention Analysis As shown in Table 2, the post - development peak outflow from the project site is less than the allowable peak outflow for each design storm event. Additionally, Table 3 presents the maximum water surface and the amount of freeboard for the existing Detention Pond. The peak flow out of the detention ponds and the maximum water surface was determined by the Storage Routing Analysis and the combining of the resulting hydrographs with the hydrographs from the area that does not flow into the pond. ' Page 4 of 8 Area # Area Acres C Tc Min. Pre 101 41.62 0.30 38 Post 201 35.74 0.53 25 Post 205 6.83 0.60 10 As shown in Table 2, the post - development peak outflow from the project site is less than the allowable peak outflow for each design storm event. Additionally, Table 3 presents the maximum water surface and the amount of freeboard for the existing Detention Pond. The peak flow out of the detention ponds and the maximum water surface was determined by the Storage Routing Analysis and the combining of the resulting hydrographs with the hydrographs from the area that does not flow into the pond. ' Page 4 of 8 I I I I I IJ I I 1 I I L � I TABLE 2 - Pre- & Post - Development Runoff Information - Detention Analysis Location Q2 cfs Q10 cfs Q25 cfs Q50 cfs Q100 cfs Pre - Development @ Outfall 37.1 53.4 61.5 70.1 73.3 Post - Development with Pond Into Existing Pond 73.5 104.0 119.6 135.7 141.6 Out of Existing Pond 27.9 40.2 46.6 53.4 56.0 Peak Flow @ Outfall 28.9 40.2 46.6 53.4 56.0 Decrease in Peak Flow 8.2 12.2 15.4 16.7 17.3 TABLE 3 - Summary of Existing Pond Maximum Water Surface Levels Storm Event Peak Flow out of Pond, cfs Weir Flow Depth, ft Water Surface Elevation, ft Freeboard Ft 2 -year 27.9 2.24 308.9 3.0' 10 -year 40.7 2.83 309.5 2.3' 25 -year 46.6 3.05 309.7 2.1' 50 -year 53.4 3.29 310.0 1.8' 100 -year 56.0 3.38 310.1 1.7' Top of Berm = 311.8, Spillway Crest = 310.5 Max water surface w /outlet clogged = 311.0, Freeboard = 0.8' The Existing Pond has a proposed overflow spillway which discharges in the event the outlet structure becomes clogged. The Existing Detention Pond spillway will be grass lined at the flat crest. It is not anticipated that the overflow spillway will be used. The Spillway discharges into the existing street if the outlet were to become clogged. The discharge from the pond is contained within the weir of the pond outlet structure and the storm sewer box that discharges into the outfall channel. This analysis shows that the pond discharge does not enter the downstream street. The grading plan for the Existing Detention Pond and the pond outlet structure and discharge pipe details are shown on Exhibit E. Page 5 of 8 ' DETENTION POND 2 (RATIONAL EQUATION ANALYSIS): 11 I TR 55 TR 55 10 minutes 1, 2, 10, 25, 50 and 100 -year storms— detention analysis Corrugated HDPE w /smooth interior 0.013 0.30 — undeveloped property, 0.60 — residential developed area Post Development flow less than or equal to Pre - Development flow 6" freeboard for 100 year storm with outlet clogged The rational equation is utilized to determine peak storm water runoff rates for Detention Pond 2 design. Q =CIA Q = Flow (cfs) A = Area (acres) C = Runoff Coefficient I = Rainfall Intensity (in/hr) ' Design Software: Excel spreadsheets, Hydraflow ' The software was used to compute the pond storage and discharge data and the pre and post development flow and the routing of the flow through the detention ponds. Applicable Exhibits: Exhibit A — Drainage Area Map Pre- Development Exhibit B — Drainage Area Map Post- Development Pond Design Exhibit C — Drainage Area Map Post- Development Exhibit E — Pond 2 Grading Plan ' Appendix H— Detention Pond 2 elevation- storage data, elevation - discharge data, pond routing data and pond routing analysis. Design Analysis: ' The Pre -development Drainage area, DA 102, is shown on Exhibit A. The post - development drainage area, DA 202, is shown on Exhibit B. Since all of the runoff does not flow into Detention Pond 2 and some of the runoff drains offsite, this drainage basin is divided into 4 areas as shown on Exhibit C. The design data and descriptions of the detention pond outlet structures, discharge pipes and overflow spillways are found in Appendix H. The peak flow out of the detention ponds were determined by a Storage Routing Analysis based on the Continuity Equation as follows: ( I1+ I2)+((2sl /dt)- 01)=((2s2 /dt) =02). The time interval, dt, used was 1 minute. The calculations and results of the Storage Routing Analysis were used to generate hydrograph peak flows and graphs for the pre and post development conditions. A summary of the peak flows from the site are shown in Table 4. ' The hydrographs for the drainage areas that do not flow into the detention ponds were combined with the detention pond outflows to determine the total post development peak flows. Triangular I Page 6 of 8 T. Methodology. T. Methodology: T, Minimum Design Storm Events: Pond Discharge Pipe Materials: Manning 's n Value: Runoff Coefficients: Design Constraints: Rational Equation: 11 I TR 55 TR 55 10 minutes 1, 2, 10, 25, 50 and 100 -year storms— detention analysis Corrugated HDPE w /smooth interior 0.013 0.30 — undeveloped property, 0.60 — residential developed area Post Development flow less than or equal to Pre - Development flow 6" freeboard for 100 year storm with outlet clogged The rational equation is utilized to determine peak storm water runoff rates for Detention Pond 2 design. Q =CIA Q = Flow (cfs) A = Area (acres) C = Runoff Coefficient I = Rainfall Intensity (in/hr) ' Design Software: Excel spreadsheets, Hydraflow ' The software was used to compute the pond storage and discharge data and the pre and post development flow and the routing of the flow through the detention ponds. Applicable Exhibits: Exhibit A — Drainage Area Map Pre- Development Exhibit B — Drainage Area Map Post- Development Pond Design Exhibit C — Drainage Area Map Post- Development Exhibit E — Pond 2 Grading Plan ' Appendix H— Detention Pond 2 elevation- storage data, elevation - discharge data, pond routing data and pond routing analysis. Design Analysis: ' The Pre -development Drainage area, DA 102, is shown on Exhibit A. The post - development drainage area, DA 202, is shown on Exhibit B. Since all of the runoff does not flow into Detention Pond 2 and some of the runoff drains offsite, this drainage basin is divided into 4 areas as shown on Exhibit C. The design data and descriptions of the detention pond outlet structures, discharge pipes and overflow spillways are found in Appendix H. The peak flow out of the detention ponds were determined by a Storage Routing Analysis based on the Continuity Equation as follows: ( I1+ I2)+((2sl /dt)- 01)=((2s2 /dt) =02). The time interval, dt, used was 1 minute. The calculations and results of the Storage Routing Analysis were used to generate hydrograph peak flows and graphs for the pre and post development conditions. A summary of the peak flows from the site are shown in Table 4. ' The hydrographs for the drainage areas that do not flow into the detention ponds were combined with the detention pond outflows to determine the total post development peak flows. Triangular I Page 6 of 8 hydrographs were created for each area assuming the peak runoff value occurs at the time of concentration and then goes to a runoff value of zero at three times the time of concentration. Detention Pond 2 discharges into the Holleman Drive South roadside ditch. The end of the discharge pipe will be mitered to match the slope of the ditch and concrete riprap placed at its end to ' control erosion. ',7 J TABLE 4 - Pre- & Post - Development Peak Discharge Comparison ' As shown in Table 5, the post - development peak outflow from the project site is less than the allowable peak outflow for each design storm event. Additionally, Tables 6 presents the maximum water surface and the amount of freeboard for Detention Pond 2. The peak flow out of the detention pond and the maximum water surface was determined by the Storage Routing Analysis and the combining of the resulting hydrographs with the hydrographs from the areas that do not flow into the ponds. 1 I I I 1 TABLE 5 - Pre- & Post - Development Runoff Information - Detention Analysis Location Area # Area Acres C Tc Min. Pre 102 1.94 0.30 20 Post 305A 1.03 0.60 16 Post 305B 0.23 0.30 14 Post 305C 0.10 0.30 14 Post 308 1 0.56 0.60 14 ' As shown in Table 5, the post - development peak outflow from the project site is less than the allowable peak outflow for each design storm event. Additionally, Tables 6 presents the maximum water surface and the amount of freeboard for Detention Pond 2. The peak flow out of the detention pond and the maximum water surface was determined by the Storage Routing Analysis and the combining of the resulting hydrographs with the hydrographs from the areas that do not flow into the ponds. 1 I I I 1 TABLE 5 - Pre- & Post - Development Runoff Information - Detention Analysis Location Q2 efs Q10 cfs Q25 cfs Q50 cfs Q100 cfs Pre - Development Outfall 2.58 3.61 4.14 4.70 4.91 Post - Development with Pond hito Existing Pond 3.47 4.81 5.45 6.08 6.30 Out of Existing Pond 1.15 1.52 1.69 1.87 1.93 Peak Flow @ Outfall 2.51 3.48 4.00 4.62 4.85 Decrease in Peak Flow 0.07 0.13 0.14 0.08 0.06 TABLE 6 - Summary of Pond 1 Maximum Water Surface Levels Storm Event Peak Flow out of Pond, cfs Water Surface Elevation, ft. Freeboard ft. 2 -year 1.15 315.5 2.5 10 -year 1.52 315.9 2.1 25 -year 1.69 316.0 2.0 50 -year 1.87 316.2 1.8 100 -year 1.93 316.2 1.8 Top of Berm = 318.0, Spillway Crest = 317.0 Max water surface w /outlet clogged = 317.0, Freeboard = 1.0' Page 7 of 8 ' Detention Pond 2 has an overflow spillway which discharges when the outlet structure is clogged. Detention Pond 2 spillway will be grass lined at the flat crest. It is not anticipated that the overflow ' spillway will be used as the pond can hold the 100 -year storm event runoff. The grading plan for the Detention Pond 2 and the pond outlet structure and discharge pipe details ' are shown on Exhibit E. HOLLEMAN DRIVE SOUTH DITCH FLOW: General Information: As shown on Exhibit A, Area 103, 2.08 acres flows into the Holleman Drive south roadside ditch. The Phase 1 development will be graded such that ' only 1.03 acres, Area 203, shown on Exhibit B would flow into the ditch. The runoff calculation for these areas is provided in Appendix I and the grading plan for the area shown on Exhibit F. The post - development peak flows are less than the pre - development flows. CONCLUSION ' The storm sewer drainage and detention facilities described in this report are designed in accordance with the standards in the BCS Drainage Design Guidelines. The peak runoff flowrate from the site will be less than the pre - development flowrates for all storm events. CERTIFICATION I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for University Heights Subdivision, Phase 1, was prepared by me in accordance with the provisions of the Unified Stormwatcr Design Guidelines. �OItP- 0I/�ay S = #•' ....................�*. Joseph \ .. JOSEPH P. SCHULTZ ' .......................... 65889 F -12327 ' SCHULTZ ENGINEERING, LLC. I LJ I Page 8 of 8 I 7 �I I 11 I I I II APPENDIX A Technical Design Summary fJ ' SECTION IX APPENDIX D — TECHNICAL DESIGN SUMMARY The Cities of Bryan and College Station both require storm drainage design to follow these Unified Stormwater Design Guidelines. Paragraph C2 of Section III (Administration) requires submittal of a drainage report in support of the drainage plan (stormwater management plan) proposed in connection with land development projects, both site projects and subdivisions. That report may be submitted as a traditional prose report, complete with applicable maps, graphs, tables and drawings, or it may take the form of a 'Technical Design Summary". The format and content for such a summary report shall be in substantial conformance with the description in this Appendix to those Guidelines. In either format the report must answer the questions (affirmative or negative) and provide, at minimum, the information prescribed in the 'Technical Design Summary' in this Appendix. 5 L J I 1 FI I LJ The Stormwater Management Technical Design Summary Report shall include several parts as listed below. The information called for in each part must be provided as applicable. In addition to the requirements for the Executive Summary, this Appendix includes several pages detailing the requirements for a Technical Design Summary Report as forms to be completed. These are provided so that they may be copied and completed or scanned and digitized. In addition, electronic versions of the report forms may be obtained from the City. Requirements for the means (medium) of submittal are the same as for a conventional report as detailed in Section III of these Guidelines. Note: Part 1 — Executive Summary must accompany any drainage report required to be provided in connection with any land development project, regardless of the format chosen for said report. Note: Parts 2 through 6 are to be provided via the forms provided in this Appendix. Brief statements should be included in the forms as requested, but additional information should be attached as necessary. Part 1— Executive Summary Report Part 2 — Project Administration Part 3 — Project Characteristics Part 4 — Drainage Concept and Design Parameters Part 5 — Plans and Specifications Part 6 — Conclusions and Attestation STORMWATER MANAGEMENT TECHNICAL DESIGN SUMMARY REPORT Part 1 — Executive Summary This is to be a brief prose report that must address each of the seven areas listed below. Ideally it will include one or more paragraphs about each item. 1. Name, address, and contact information of the engineer submitting the report, and of the land owner and developer (or applicant if not the owner or developer). The date of submittal should also be included. 2. Identification of the size and general nature of the proposed project, including any proposed project phases. This paragraph should also include reference to applications that are in process with either City: plat(s), site plans, zoning requests, STORMWATER DESIGN GUIDELINES Page 1 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 1 I 1 'I I 1 L � �I IJ I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY or clearing /grading permits, as well as reference to any application numbers or codes assigned by the City to such request. 3. The location of the project should be described. This should identify the Named Regulatory Watershed(s) in which it is located, how the entire project area is situated therein, whether the property straddles a watershed or basin divide, the approximate acreage in each basin, and whether its position in the Watershed dictates use of detention design. The approximate proportion of the property in the city limits and within the ETJ is to be identified, including whether the property straddles city jurisdictional lines. If any portion of the property is in floodplains as described in Flood Insurance Rate Maps published by FEMA that should be disclosed. 4. The hydrologic characteristics of the property are to be described in broad terms: existing land cover; how and where stormwater drains to and from neighboring properties; ponds or wetland areas that tend to detain or store stormwater; existing creeks, channels, and swales crossing or serving the property; all existing drainage easements (or ROW) on the property, or on neighboring properties if they service runoff to or from the property. 5. The general plan for managing stormwater in the entire project area must be outlined to include the approximate size, and extent of use, of any of the following features: storm drains coupled with streets; detention / retention facilities; buried conveyance conduit independent of streets; swales or channels; bridges or culverts; outfalls to principal watercourses or their tributaries; and treatment(s) of existing watercourses. Also, any plans for reclaiming land within floodplain areas must be outlined. 6. Coordination and permitting of stormwater matters must be addressed. This is to include any specialized coordination that has occurred or is planned with other entities (local, state, or federal). This may include agencies such as Brazos County government, the Brazos River Authority, the Texas A &M University System, the Texas Department of Transportation, the Texas Commission for Environmental Quality, the US Army Corps of Engineers, the US Environmental Protection Agency, et al. Mention must be made of any permits, agreements, or understandings that pertain to the project. 7. Reference is to be made to the full drainage report (or the Technical Design Summary Report) which the executive summary represents. The principal elements of the main report (and its length), including any maps, drawings or construction documents, should be itemized. An example statement might be: "One page drainage report dated , one set of construction drawings (_ sheets) dated and a -page specifications document dated comprise the drainage report for this project." STORMWATER DESIGN GUIDELINES Page 2 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I ,J SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY 1 1 J lJ I I Part 2 — Project Administration Start (Page 2.1) Engineering and Design Professionals Information Engineering Firm Name and Address: Jurisdiction Schultz Engineering, LLC City: Bryan P.O. Box 11995 College Station, Tx 77842 ✓ College Station Date of Submittal: May 2011 Lead Engineer's Name and Contact Info.(phone, e-mail, fax): Other: Joseph P. Schultz, PE email: joeschultz84 @verizon.nel Phone: 764 -3900 far: 764-3910 Supporting Engineering / Consulting Firm(s): contacts: N/A 7NItA Developer/ Owner/ Applicant Information Developer / Applicant Name and Address: Phone and e-mail: MJBS Holleman, LTD., a Texas Limited Partnership (512) 413 -8748 5704 Travis Green Ln. pschu/tz @regents- austin.com Austin, Tx 78745 Property Owner(s) if not Developer/ Applicant (& address): Phone and e-mail: same as Developer N/A Project Identification Development Name: University Heights Phase l Is subject property a site project, a single -phase subdivision, or part of a multi -phase subdivision? Multi -Phase If multi - phase, subject property is phase 1 of 5 Legal description of subject property (phase) or Project Area: (see Section ll, Paragraph B -3a) 18.383 acres out of the Crawford Burnett Survey, A -7 If subject property (phase) is second or later phase of a project, describe general status of all earlier phases. For most recent earlier phase Include submittal and review dates. N/A General Location of Project Area, or subject property (phase): North -West of intersection of Holleman Dr. and Paloma Ridge Dr. In City Limits? Extraterritorial Jurisdiction (acreage): Bryan: acres. Bryan: College Station: College Station: 18.383 acres. Acreage Outside ETJ: STORMWATER DESIGN GUIDELINES Page 3 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I I 1 h 11 1 1 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 2 — Proiect Administration Continued (page 2.2) Project Identification (continued) Roadways abutting or within Project Area or Abutting tracts, platted land, or built subject property: developments: Holleman Drive South Ins Palomas Subdivision (7367153) to the south Proposed Great Oaks Subdivision to the west Named Regulatory Watercourse(s) & Watershed(s): Tributary Basin(s): None Hopes Creek Plat Information For Project or Subject Property (tar Phase) Preliminary Plat File #: 1100500064 Final Plat File #: " Date: " Name: University Heights Status and Vol /Pg: Submitted May 2011 If two plats, second name: N/A File #: Status: Date: Zoning Information For Projector Subject Property (or Phase) Zoning Type: R Existing or Proposed? Existing Case Code: Case Date Status: Zoning Type: R-3 Existing or Proposed? Existing Case Code: Case Date Status: Stormwater Management Planning For Project or Subject Property (or Phase) Planning Conference(s) & Date(s): Participants: N/A Preliminary Report Required? NIA Submittal Date Review Date Review Comments Addressed? Yes NIA No _ In Writing? When? Compliance With Preliminary Drainage Report. Briefly describe (or attach documentation explaining) any deviation(s) from provisions of Preliminary Drainage Report, if any. Drainage Reports were previously prepared when the Los Palomas Subdivision was developed and the existing detention pond was constructed. A report was also prepared in 2008 for this development, then called Oakland Ridge. The existing detention pond volume does not have the volume specified in those reports and it is proposed to enlarge the existing pond as part of this development. STORMWATER DESIGN GUIDELINES Page 4 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I 1 1 U SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 2 — Project Administration Continued (page 2.3) Coordination For Project or Subject Property (or, Phase) Note: For any Coordination of stormwater matters indicated below, attach documentation describing and substantiating any agreements, understandings, contracts, or approvals. Dept. Contact: Date: Subject: Coordination With Other Departments of Jurisdiction City (Bryan or College Station) Coordination With Summarize need(s) & actions taken (include contacts & dates): Non - jurisdiction City Needed? Yes _ No ✓ Coordination with Summarize need(s) & actions taken (include contacts & dates): Brazos County Needed? Yes No ✓ Coordination with Summarize need(s) & actions taken (include contacts & dates): TxDOT Needed? Yes No ✓ Coordination with Summarize need(s) & actions taken (include contacts & dates): TAMUS Needed? Yes _ No ✓ Permits For Projector Subject Property (or,Phase) As to stormwater management, are permits required for the proposed work from any of the entities listed below? If so summarize status of efforts toward that objective ins aces below. Entity Permitted or Status of Actions (include dates) Approved ? US Army Crops of Engineers No ✓ Yes _ US Environmental Protection Agency No ✓ Yes Texas Commission on General Permit It will be filed by the Construction Contractor. Environmental Quality 150000 No _ Yes ✓ Brazos River Authority No Yes STORMWATER DESIGN GUIDELINES Page 5 of 26 APPENDIX. D: TECH. DESIGN SUMMARY ' Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY 1 1 1 Part 3 — Property Characteristics Start (Page 3.1) Nature and Scope of Proposed Work Existing: Land proposed for development currently used, including extent of impervious cover? None- Vacant Site — Redevelopment of one to atted lot, or two or more adjoining to atted lots. Development — Building on a single Ip atted lot of undeveloped land. Project — Building on two or more ID atted adjoining lots of undeveloped land. (select all applicable) — Building on a single lot, or adjoining lots, where proposed plat will not form a new street (but may include ROW dedication to existing streets). Other (explain): Subdivision Construction of streets and utilities to serve one or more 1p atted lots. Development ✓ Construction of streets and utilities to serve one or more proposed lots on Project lands represented by Pending plats Site Projects building use(s), approximate floor space, impervious cover ratio. Describe Subdivisions number of lots by general type of use, linear feet of streets and Nature and drainage easements or ROW. Size of 35 Townhouse Lots and 47 R -1 Residential Lots and Proposed Project Is any work planned on land that is not platted If yes, explain: or on land for which platting is not pending ✓ No Yes FEMA Floodplains Is any part of subject property abutting a Named Regulatory Watercourse No ✓ Yes (Section II, Paragraph B1) or a tributary thereof? Is any part of subject property in floodplain No ✓ Yes Rate Map 48041CO182 area of a FEMA - regulated watercourse? Encroachment(s) into Floodplain Encroachment purpose(s): — Building site(s) _ Road crossing(s) areas planned? — Utility crossing(s) — Other (explain): No ✓ N/A Yes If floodplain areas not shown on Rate Maps, has work been done toward amending the FEMA- approved Flood Study to define allowable encroachments in proposed areas? Explain. ' STORMWATER DESIGN GUIDELINES Page 6 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 ' SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY 1 1 1 1 1 11 Part 3 — Property Characteristics Continued (Page 3.2) Hydrologic Attributes of Subject Property (or Phase) Has an earlier hydrologic analysis been done for larger area including subject property? Yes Reference the study (& date) here, and attach copy if not already in City files. Drainage Report for Los Palomas and for Oakland Ridge Subdivision. Is the stormwater management plan for the property in substantial conformance with the earlier study? Yes No ✓ If not, explain how it differs. Outlet structure to be modrfied and pond volume increased. No If subject property is not part of multi -phase project, describe stormwater management plan for the property in Part 4. If property is part of multi -phase project, provide overview of stormwater management plan for Project Area here. In Part 4 describe how plan for subject property will comply therewith. Do existing topographic features on subject property store or detain runoff? _ No Yes Describe them (include approximate size, volume, outfali, model, etc). Existing detention pond constructed with Los Palomas. Any known drainage or flooding problems in areas near subject property? ! No _ Yes Identify: Based on location of study property in a watershed, is Type 1 Detention (flood control) needed? (see Table B -1 in Appendix B) ✓ Detention is required. _ Need must be evaluated. Detention not required. What decision has been reached? By whom? If the need for How was determination made? Type 1 Detention must be evaluated: ' STORMWATER DESIGN GUIDELINES Page 7 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 u 1 1 1 1 J I 1 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 3 — Property Characteristics Continued (Page 3.3) Hydrologic Attributes of Subject Property (or Phase) (continued) Does subject property straddle a Watershed or Basin divide? _ No ✓ Yes If yes, describesplits below. In Part 4 describe desi n conce t for handling this. Watershed or Basin I Larger acreage Lesser acreage Hopes Creek X Bee Creek X Above - Project Areas(Section II, Paragraph B3 -a) Does Project Area (project or phase) receive runoff from upland areas? _ No ✓ Yes Size(s) of area(s) in acres: 1) 3.09 2) 3) 4) Flow Characteristics (each instance) (overland sheet, shallow concentrated, recognizable concentrated section(s), small creek (non - regulatory), regulatory Watercourse or tributary); Overland Sheet Flow Flow determination Outline hydrologic methods and assumptions: Rational Equation Does storm runoff drain from public easements or ROW onto or across subject property? ✓ No _Yes If yes, describe facilities in easement or ROW: Are changes in runoff characteristics subject to change in future? Explain N/A Conveyance Pathways (Section II, Paragraph C2) Must runoff from study property drain across lower properties before reaching a Regulatory Watercourse or tributary? No ✓ Yes Describe length and characteristics of each conveyance pathway(s). Include ownership of property(ies). The runoff will flow through an existing detention pond and an outlet structure that will be modified. This structure discharges into an existing storm sewer box culvert, then into an existing channel before it discharges onto the adjacent property. STORMWATER DESIGN GUIDELINES Page 8 of 26 APPENDIX. D: TECH. DESIGN SUMMARY ' Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY 1 1 1 1 1 1 1 LJ 1 1 Part 3 — Property Characteristics Continued (Page 3.4) Hydrologic Attributes of Subject Property (or Phase) (continued) Conveyance Pathways (continued) Do drainage If yes, for what part of length? 100 % Created by? Plat plat, or easements instrument. If instrument(s), describe their provisions. exist for any part of 55' Private Drainage Easement and Public Utility Easement. By Las Palomas pathway(s)? Subdivision Plat Vol. 7367 Pg. 53 _ No ✓ Yes Where runoff must cross lower properties, describe characteristics of abutting lower property(ies). (Existing watercourses? Easement or Consent squired ?) Developed duplex subdivision with easements provided by plat from which d enters an Pathway existing water course, tributary of Hopes Creek. Areas Describe any built or improved drainage facilities existing near the property (culverts, bridges, lined channels, buried conduit, swales, detention ponds, etc). A detention pond for the Los Palomas development was constructed on the University Heights property by agreement between landowners and developers. Nearby Drainage Facilities Do any of these have hydrologic or hydraulic influence on proposed stormwater design? _ No ( Yes If yes, explain: ' STORMWATER DESIGN GUIDELINES Page 9 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I 1 1 1 1 1 1 I 1 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concernt and Design Parameters Start (Page 4.1) Stormwater Management Concept Discharge(s) From Upland Area(s) If runoff is to be received from upland areas, what design drainage features will be used to accommodate it and insure it is not blocked by future development? Describe for each area, flow section, or discharge point. Upland runoff will flow through the proposed residential lots where it will be collected in proposed inlets, conveyed through the storm sewer system and discharged into the proposed detention ponds. Discharge(s) To Lower Propertty(les) (Section II, Paragraph E1) Does project include drainage features (existing or future) proposed to become public via platting? J No _Yes Separate Instrument? No Yes Per Guidelines reference above, how will Establishing Easements (Scenario 1) runoff be discharged to neighboring Pre - development Release (Scenario 2) property(ies)? Combination of the two Scenarios Scenario 1: If easements are proposed, describe where needed, and provide status of actions on each. (Attached Exhibit # _____) Easements are existing. Scenario 2: Provide general description of how release(s) will be managed to pre -development conditions (detention, sheet flow, partially concentrated, etc.). (Attached Exhibit # ------ Detention pond Combination: If combination is proposed, explain how discharge will differ from pre - development conditions at the property line for each area (or point) of release. If Scenario 2 , or Combination are to be used, has proposed design been coordinated with owner(s) of receiving property(ies)? No Yes Explain and provide documentation. STORMWATER DESIGN GUIDELINES Page 10 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I I I r L 1 1 1 1 LJ I I Ll i I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Conceat and Design Parameters Continued (Page 4.2) Stormwater Management Concept (continued) Within Project Area Of Multi -Phase Project Identify gaining Basins or Watersheds and acres shifting: Will project result in shifting runoff between Basins or between What design and mitigation is used to compensate for increased runoff Watersheds? from gaining basin or watershed? ✓ No Yes How will runoff from Project 1. — With facility(ies) involving other development projects. Area be mitigated to pre- 2 ✓ Establishing features to serve overall Project Area. development conditions? — Select any or all of 1, 2, 3. ✓ On phase (or site) project basis within Project Area. and /or 3, and explain below. 1. Shared facility (type & location of facility; design drainage area served; relationship to size of Project Area): (Attached Exhibit # Two Detention Ponds are proposed for this phase. 2. For Overall Project Area (type & location of facilities): (Attached Exhibit #- In Phase I of the proposed site 3. By phase (or site) project Describe planned mitigation measures for phases (or sites) in subsequent questions of this Part. Are aquatic echosystems proposed? ? No — Yes In which phase(s) or project(s)? C' v > Are other Best Management Practices for reducing stormwater pollutants proposed? a No ✓ Yes Summarize type of BMP and extent of use: N rn - Silt Fence, Construction Exit, Seeding, Grass Block Sod, Inlet Protection N (] o Z design of any runoff - handling facilities deviate from provisions of B -CS Technical CL I If Specifications, check type facility(ies) and explain in later questions. Cn 2 Detention elements Conduit elements Channel features - Swales — Ditches Inlets — Valley gutters _ Outfalls Culvert features — Bridges Other STORMWATER DESIGN GUIDELINES Page 11 of 26 APPENDIX. D: TECH. DESIGN SUMMARY ' Effective February 2007 As Revised February 2009 I I J L 1 I F I lJ I I 1 I I F I I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters I Continued (Page 4.3) Stormwater Management Concept (continued) Within Protect Area Of Multi -Phase Project (continued) Will Project Area include bridge(s) or culvert(s)? No ✓ Yes Identify type and general size and In which phase(s). Two culverts are proposed along Holleman Drive South. If detention /retention serves (will serve) overall Project Area, describe how it relates to subject phase or site project (physical location, conveyance pathway(s), construction sequence): The existing Detention Pond that will be altered is on the south east boundary of the parent tract will be for all phases of the development. A proposed Detention Pond is located in the northern most corner of the parent tract. Within Or Serving Subject Property (Phase, or Site) If property part of larger Project Area, is design in substantial conformance with earlier analysis and report for larger area? ✓ Yes No, then summarize the difference(s): Identify whether each of the types of drainage features listed below are included, extent of use, and general characteristics. Typical shape? Surfaces? C'. v Steepest side slopes: Usual front slopes: Usual back slopes: a1 } d 2 I Flow line slopes: least Typical distance from travelway: `o typical greatest (Attached Exhibit # C N Z a ° I Are longitudinal culvert ends in compliance with B -CS Standard Specifications? 2 Yes No, then explain: At intersections or otherwise, do valley gutters cross arterial or collector streets? } ✓ No _ Yes If yes explain: : E >I > m Are valley gutters proposed to cross any street away from an intersection? d o, o ✓ No _ Yes Explain: (number of locations ?) N 'G C C9 Q STORMWATER DESIGN GUIDELINES Page 12 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 i F r I I I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.4) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Gutter line slopes: Least 0.7 Usual 0.8% Greatest 2.44 %a Are inlets recessed on arterial and collector streets? _ Yes _ No If "no ", identify where and why. N/A Will inlets capture 10 -year design stormflow to prevent flooding of intersections (arterial with arterial or collector)? ✓ Yes No If no, explain where and why not. C1. d Will inlet size and placement prevent exceeding allowable water spread for 10 -year design storm throughout site (or phase)? ✓ Yes _ No If no, explain. rn See Appendix Sag curves Are inlets placed at low points? ✓ Yes _ No Are inlets and g conduit sized to prevent 100 -year stormflow from ponding at greater than 24 inches? _ ✓ Yes No Explain "no" answers. Vl d Will 100 -yr stormflow be contained in combination of ROW and buried conduit on whole length of all streets? ✓ Yes _ No If no, describe where and why. Do designs for curb, gutter, and inlets comply with B -CS Technical Specifications? ✓ Yes No If not, describe difference(s) and attach justification. Are any 12 -inch laterals used? ✓ No Yes Identify length(s) and where used. C1. ° m a w Pipe runs between system Typical 110 Longest 308.1 > access points (feet): E � I Are junction boxes used at each bend? ✓ Yes No If not, explain where N and why. C m Z E W Are downstream soffits at or below upstream soffits? Least amount that hydraulic y Yes ✓ No _ If not, explain where and why: grade line is below gutter line (system- wide): 1.87 Feet STORMWATER DESIGN GUIDELINES Page 13 of 26 APPENDIX. D: TECH. DESIGN SUMMARY 1 Effective February 2007 As Revised February 2009 r l 1 I r] I I i SECTION IX APPENDIX D — TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.5) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Describe watercourse(s), or system(s) receiving system discharge(s) below m (include design discharge velocity, and angle between converging flow lines). 1) Watercourse (or system), velocity, and angle? N C e Storm sewer system drains into existing detention pond. — `o a F 2) Watercourse (or system), velocity, and angle? a c ,� � d c E E b M 3) Watercourse (or system), velocity, and angle? T � O O € w For each outfall above, what measures are taken to prevent erosion or scour of m receiving and all facilities at juncture? m ,) CL 2) N 0 3) Are swale(s) situated along property lines between properties? _ No _ Yes Number of instances: For each instance answer the following questions. Surface treatments (including low -flow flumes if any): C 0 d a) of h } c Flow line slopes (minimum and maximum): m v O o Z Outfall characteristics for each (velocity, convergent angle, & end treatment). d N Will 100 -year design storm runoff be contained within easement(s) or platted drainage ROW in all instances? Yes No If "no" explain: STORMWATER DESIGN GUIDELINES Page 14 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY I LJ I Part 4 — Drainage Concept and Desian Parameters Continued (Page 4.6) Storrnwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Are roadside ditches used? a No If so, provide the following: t Is — Yes 25 -year flow contained with 6 inches of freeboard throughout ? Yes No _ _ Are top of banks separated from road shoulders 2 feet or more? Yes No _ _ Are all ditch sections trapezoidal and at least 1.5 feet deep? _ Yes No y For any "no" answers provide location(s) and explain: v 0 If conduit is beneath a swale, provide the following information (each instance). Instance 1 Describe general location, approximate length: N r Is 100 -year design flow contained in conduit/swale combination? — Yes — No "no" explain: U If o m Space for 100 -year storm flow? ROW _ Easement _ Width Z _s Swale Surface type, minimum Conduit Type and size, minimum and maximum cc and maximum slopes: slopes, design storm: c 0 N � Z m Inlets Describe how conduit is loaded (from streets /storm drains, inlets by type): � c m m — r U C o c Access Describe how maintenance access is provided (to swale, into conduit): o d w .� Instance 2 Describe general location, approximate length: y E N � c v Is 100 -year design flow contained in conduit/swale combination? —Yes — No If "no" explain: c a E t Space for 100 -year storm flow? ROW _ Easement _ Width a Swale Surface type, minimum I Conduit Type and size, minimum and maximum and maximum slopes: slopes, design storm: c m CL Inlets Describe how conduit is loaded (from streets /storm drains, inlets by type): h 2 Access Describe how maintenance access is provided (to swale, into conduit): STORMWATER DESIGN GUIDELINES Page 15 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I !J I i I I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.7) Storniwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) If "yes" provide the following information for each instance: Instance 1 Describe general location, approximate length, surfacing: c n E W tg H Is 100 -year design flow contained in swale? _ Yes _ No Is swale wholly within drainage ROW? _ Yes _ No Explain "no" answers: 0 Access Describe how maintenance access is provide: 0 �z v 0 Instance 2 Describe general location, approximate length, surfacing: , m c C1. c z E 3 Is 100 -year design flow contained in swale? _Yes — No Is Swale wholly within drainage ROW? Yes _ No Explain "no" answers: d o 0 0 _ — af Access Describe how maintenance access is provided: S U_ B O. Instance 3.4. etc. If swales are used in more than two instances, attach sheet providing all above information for each instance. "New" channels: Will any area(s) of concentrated flow be channelized (deepened, widened, or straightened) or otherwise altered? — No — Yes If only slightly shaped, see " Swales" in this Part. If creating side banks, provide information below. c Will design replicate natural channel? _ Yes _ No If "no ", for each instance 0 0. describe section shape & area, flow line slope (min. & max.), surfaces, and 100 -year o w design flow, and amount of freeboard: CL Instance 1: N d 1, E 7 0 Instance 2: CL E 0 _ z . Instance 3: r U STORMWATER DESIGN GUIDELINES Effective February 2007 Page 16 of 26 D: TECH. DESIGN SUMMARY As Revised February 2009 J I 1 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY I I I I I I I II I Part 4 — Drainage Concept and Design Parameters Continued (Page 4.8) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Existing channels (small creeks): Are these used? No Yes _ If 'yes" provide the information below. Will small creeks and their floodpiains remain undisturbed? Yes No How many disturbance instances? Identify each planned location _ For each location, describe length and general type of proposed improvement (including floodplain changes): For each location, describe section shape & area, flow line slope (min. & max.), surfaces, and 100 -year design flow. c o Watercourses (and tributaries): Aside from fringe changes, are Regulatory 0 Watercourses proposed to be altered? V No Explain below. _Yes d Submit full report describing proposed changes to Regulatory Watercourses. Address E existing and proposed section size and shape, surfaces, alignment, flow line changes, length affected, and capacity, and provide full documentation of analysis procedures CL and data. Is full report submitted? Yes _ No If "no" explain: d N/A c U All Proposed Channel Work: For all proposed channel work, provide information requested in next three boxes. If design is to replicate natural channel, identify location and length here, and describe design in Special Design section of this Part of Report. N/A Will 100 -year flow be contained with one foot of freeboard? If —Yes —No not, identify location and explain: N/A Are ROW / easements sized to contain channel and required maintenance space? Yes _ No If not, identify location(s) and explain: N/A STORMWATER DESIGN GUIDELINES Page 17 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I I I L� I U �1 I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concent and Design Parameters Continued (Page 4.9) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) How many facilities for subject property project? 2 For each provide info. below. For each dry -type facilitiy: Facility 1 Facility 2 Acres served & design volume + 10% 35.74 323,260 cf 1.03 10,167 cf 100 -yr volume: free flow & plugged 184,000 cf 188,000 cf 6,000 10,167 cf Design discharge (10 yr & 25 yr) 40.2 46.6 3.5 4.0 Spillway crest at 100 -yr WSE? ✓ yes _ no -1 yes _ no Berms 6 inches above plugged WSE? yes _ no ✓ yes _ no Explain any "no" answers: N N For each facility what is 25 -yr design Q. and design of outlet structure? Facility 1: 46.6 cfs - Existing Concrete Riser with Concrete Weir 0 Z Facility 2: 4.0 cfs - Proposed Concrete Riser with Narrow Weir Slot Do outlets and spillways discharge into a public facility in easement or ROW? Facility 1: ✓ Yes _ No Facility 2: V Yes _ No If "no" explain: 01 0 CL 0 CL For each, what is velocity of 25 -yr design discharge at ou et? & at s ilo Iwav LO Facility 1: 7 . 2 & N/A Facility 2: 5.1 & N/A . 5 Are energy dissipation measures used? ✓ No _ Yes Describe type and LL location: r- 0 c O For each, is spillway surface treatment other than concrete? Yes or no, and describe: Facility 1: Grass lined overflow spillway Facility 2: Grass lined overflow spillway For each, what measures are taken to prevent erosion or scour at receiving facility? Facility 1: Concrete headwall at storm sewer box culvert outlet Facility 2: Concrete riprap at pipe end If berms are used give heights, slopes and surface treatments of sides. Facility 1: N/A Facility 2: 3' high, 4H. IV side slopes, grass slopes I STORMWATER DESIGN GUIDELINES Page 18 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY I I 11 1� I I Part 4 — Drainage Conceot and Design Parameters Continued (Page 4.10) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Do structures comply with B -CS Specifications? Yes or no, and explain if "no ": Facility 1; Yes d L Facility 2: Yes C 00 C o For additional facilities provide all same information on a se crate sheet. Are parking areas to be used for detention7 � No Yes What is maximum depth due to required design storm? Roadside Ditches Will culverts serve access driveways at roadside ditches? _ No _ Yes If "yes ", provide information in next two boxes. Will 25 -yr. flow pass without flowing over driveway in all cases? _ Yes _ No Without causing flowing or standing water on public roadway? _ Yes _ No Designs & materials comply with B -CS Technical Specifications? _ Yes _ No Explain any "no" answers: N Q7 C o Are culverts parallel to public roadway alignment? — Yes _ No Explain: U � d r ' n I Creeks at Private Drives: Do private driveways, drives, or streets cross drainage m ways that serve Above - Project areas or are in public easements/ ROW? V o z —No _Yes If "yes" provide information below. �I How many instances? Describe location and provide information below. Location 1: U m Location 2: Location 3: For each location enter value for: 1 2 3 Design year passing without toping travelway? Water depth on travelway at 25 -year flow? Water depth on travelway at 100 -year flow? For more instances describe location and same information on separate sheet. ' STORMWATER DESIGN GUIDELINES Page 19 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 i SECTION IX APPENDIX D — TECHNICAL DESIGN SUMMARY I I LJ I I Part 4 — Drainage Concept and Design Parameters Continued (Page 4.11) " Stormwater`Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Named Regulatory Watercourses I& Tributaries): Are culverts proposed on these facilities? ✓ No _ Yes, then provide full report documenting assumptions, criteria, analysis, computer programs, and study findings that support proposed design(s). Is report provided? _ Yes _ No If "no ", explain: m Arterial or Maior Collector Streets: Will culverts serve these types of roadways? N ✓ No Yes How many instances? For each identify the d _ location and provide the information below. } a Instance 1: N Instance 2: 1 c o Instance 3: 0 Z .i or No for the 100 -year design flow: 1 2 3 Y es Headwater WSE 1 foot below lowest curb top? ' o Spread of headwater within ROW or easement? I 4) W Is velocity limited per conditions (Table C -11)? 01 'o w Explain any "no" answer(s): o U •- a N p U 9 O N B Minor Collector or Local Streets: Will culverts serve these types of streets? No ✓ Yes How many instances? 2 for each identify the a location _ and provide the information below: m y. Instance 1: 15" RCP culvert at Davidson Drive and Holleman Drive South a c m Instance 2: 15" RCP culvert at Kenyon Drive and Holleman Drive South � o Instance 3: For each instance enter value, or "yes" / "no" for: 1 2 3 w � Design yr. headwater WSE 1 ft. below curb top? Yes Yes 2 100 -yr. max. depth at street crown 2 feet or less? Yes Yes 0 Product of velocity (fps) & depth at crown (ft) = ? N/A N/A w Is velocity limited per conditions (Table C -11)? Limit of down stream analysis (feet)? N/A N/A Explain any "no" answers: STORMWATER DESIGN GUIDELINES Page 20 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY I I I I Part 4 — Drainage Concept and Desian Parameters Continued (Page 4.12) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) All Proposed Culverts: For all proposed culvert facilities (except driveway /roadside ditch intersects) provide information requested in next eight boxes. Do culverts and travelways intersect at 90 degrees? a Yes No If not, identify location(s) and intersect angle(s), and justify the design(s): Does drainage way alignment change within or near limits of culvert and surfaced approaches thereto? � No _ Yes If "yes" identify location(s), describe change(s), and justification: Are flumes or conduit to discharge into culvert barrel(s)? No _Yes If yes, identify location(s) and provide justification: Are flumes or conduit to discharge into or near surfaced approaches to culvert ends? 4 No _ Yes If "yes" identify location(s), describe outfall design treatment(s): C C O U N Is scour /erosion protection provided to ensure long term stability of culvert structural tj components, and surfacing at culvert ends? Yes — No If "no" Identify locations and provide justification(s): Culvert Pipe 120 velocity > 7 fps - use concrete riprap Culvert Pipe 119 - velocity < 4 fps - grass ok Will 100 -yr flow and spread of backwater be fully contained in street ROW, and /or drainage easements/ ROW? . Yes _ No if not, why not? Do appreciable hydraulic effects of any culvert extend downstream or upstream to neighboring land(s) not encompassed in subject property? V No _ Yes If "yes' describe location(s) and mitigation measures: Are all culvert designs and materials in compliance with B -CS Tech. Specifications? Yes — No If not, explain in Special Design Section of this Part. STORMWATER DESIGN GUIDELINES Page 21 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY I 11 I I 11 I Part 4 — Drainage Concept and Design Parameters Continued (Page 4.13) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Is a bridge included in plans for subject property project? No _ Yes If "yes' provide the following information. Name(s) and functional classification of the roadway(s)? What drainage way(s) is to be crossed? N d O! ttr A full report supporting all aspects of the proposed bridge(s) (structural, geotechnical, hydrologic, and hydraulic factors) must accompany this summary report. Is the report provided? — Yes _ No If "no" explain: Is a Stormwater Provide a general description of planned techniques: Pollution Prevention Construction Exits, Sediment Pond, Silt Fence, Revegetation Plan (SW3P) 0 established for `m project construction? m No ! Yes Special Designs – Non - Traditional Methods Are any non - traditional methods (aquatic echosystems, wetland -type detention, natural stream replication, BMPs for water quality, etc.) proposed for any aspect of subject property project? No _ Yes If "yes" list general type and location below. Provide full report about the proposed special design(s) including rationale for use and expected benefits. Report must substantiate that stormwater management objectives will not be compromised, and that maintenance cost will not exceed those of traditional design solution(s). Is report provided? Yes _ No If "no" explain: STORMWATER DESIGN GUIDELINES Page 22 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY I I J Part 4 — Drainage Concept and Desian Parameters Continued (Page 4.14) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Special Designs — Deviation From B -CS Technical Specifications If any design(s) or materiai(s) of traditional runoff- handling facilities deviate from provisions of B -CS Technical Specifications, check type facility(ies) and explain by specific detail element. Detention elements Drain system elements _ Channel features _ Culvert features _ Swales _ Ditches _ Inlets _Outfalls _ Valley gutters _ Bridges (explain in bridge report) In table below briefly identify specific element, justification for deviation(s). Specific Detail Element Justification for Deviation (attach additional sheets if needed) 1) 2) 3) 4) 5) Have elements been coordinated with the City Engineer or her/his designee? For each item above provide "yes" or "no ", action date, and staff name: 1) 2) 3) 4) 5) Design Parameters Hydrology Is a map(s) showing all Design Drainage Areas provided? Yes _ No Briefly summarize the range of applications made of the Rational Formula: Storm Sewer Design Detention Pond Design What is the size and location of largest Design Drainage Area to which the Rational Formula has been applied? 41.62 acres Location (or identifier): DA 101 1 STORMWATER DESIGN GUIDELINES Page 23 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 1 I 1 I I I `J I I [1 I M 1 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.15) Design Parameters (continued) Hydrology (continued) In making determinations for time of concentration, was segment analysis used? _ No ✓ Yes In approximately what percent of Design Drainage Areas? 90 % As to intensity- duration - frequency and rain depth criteria for determining runoff flows, were any criteria other than those provided in these Guidelines used? ✓ No _Yes If "yes" identify type of data, source(s), and where applied: For each of the stormwater management features listed below identify the storm return frequencies (year) analyzed (or checked), and that used as the basis for design. Feature Analysis Year(s) Design Year Storm drain system for arterial and collector streets N/A N/A Storm drain system for local streets 10 & 100 10 Open channels 10 & 100 10 Swaletburied conduit combination in lieu of channel N/A - Swales Roadside ditches and culverts serving them 10 & 100 10 Detention facilities: spillway crest and its outfail 2, 10, 25, 50,100 100 Detention facilities: outlet and conveyance structure(s) 2, 10, 25, 50,100 100 Detention facilities: volume when outlet plugged 100 100 Culverts serving private drives or streets Culverts serving public roadways 10& 100 10 Bridges: provide in bridge report. - - Hydraulics What is the range of design flow velocities as outlined below? Design flow velocities; Gutters Conduit Culverts Swales Channels Highest (feet per second) 3.47 8.50 3.05 n/a 2.41 Lowest (feet per second) 1.21 3.23 7.25 Ala 2.29 Streets and Storm Drain Systems Provide the summary information outlined below: Roughness coefficients used: For street gutters: 0.018 For conduit type(s) RCP HDPE Coefficients: 0.012 0.012 STORMWATER DESIGN GUIDELINES Page 24 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Desiqn Parameters Continued (Page 4.16) Design Parameters (continued) Hydraulics (continued) Street and Storm Drain Systems (continued) For the following, are assumptions other than allowable per Guidelines? Inlet coefficients? ✓ No _ Yes Head and friction losses ✓ No _ Yes Explain any "yes" answer: In conduit is velocity generally increased in the downstream direction? — Yes — No Are elevation drops provided at inlets, manholes, and junction boxes? — Yes _ No Explain any "no" answers: Are hydraulic grade lines calculated and shown for design storm? ✓ Yes _ No For 100 -year flow conditions? ✓ Yes _ No Explain any "no" answers: What tailwater conditions were assumed at outfall point(s) of the storm drain system? Identify each location and explain: The tailwater at each outfaU was assumed to be at the down stream soffit of the outfaU pipe (pipes 116, 116A, and 117) Open Channels If a HEC analysis is utilized, does it follow Sec_ VI.F.5.a? _ Yes _ No Outside of straight sections, is flow regime within limits of sub - critical flow? _ Yes _ No If "no" list locations and explain: Culverts If plan sheets do not provide the following for each culvert, describe it here. For each design discharge, will operation be outlet (barrel) control or inlet control? Entrance, friction and exit losses: Bridges Provide all in bridge report STORMWATER DESIGN GUIDELINES Page 25 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 i I I SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.17) Design Parameters (continued) Computer Software What computer software has been used in the analysis and assessment of stormwater management needs and/or the development of facility designs proposed for subject property project? List them below, being sure to identify the software name and version, the date of the version, any applicable patches and the publisher Excel spreadsheets, Autodesk Civil 3D Storm Sewer Analysis and Hydroflow Part 5 — Plans and Specifications Requirements for submittal of construction drawings and specifications do not differ due to use of a Technical Design Summary Report. See Section III, Paragraph C3. Part 6 - Conclusions and Attestation Conclusions Add any concluding information here: The storm sewer system and detention facilities are designed in accordance with the BCS Drainage Design Guidelines. Attestation , Provide attestation to the accuracy and completeness of the foregoing 6 Parts of this Technical Design Summary Drainage Report by signing and sealing below. "This report (plan) for the drainage design of the development named in Part B was prepared by me (or under my supervision) in accordance with provisions of the Bryan/College Station Unified Drainage Design Guidelines for the owners of the property. d permits required by any and all state and federal regulatory agencies f ,prI�ainage imp vements have been issued r f 1 under applicable general f °•• m 0D 21 ( Affix Se�j : JOSEPH P . SCHULTZ p .e 9 0 65869 Licen Pro essional Engineer D >00.& F ° ° =GISTF�a C9® State of Texas PE No. bseaq �zR Z,7�lt I STORMWATER DESIGN GUIDELINES Page 26 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 I 1 i CJ I r] 1 1 J I E_1 I I APPENDIX B Drainage Area Summary I APPENDIX B University Heights Phase 1 Drainage Area Summary Area # Area, A (acres) C to (min) 10 year storm 100 year storm I (inlhr) Qio (cfs) I+w (in /hr) Qrw lots) 301 0.04 0.600 10.0 8.635 0.21 11.639 0.28 302 0.06 0.600 10.0 8.635 0.31 11.639 0.42 303A 0.92 0.420 23.1 5.737 2.22 7.805 3.03 3038 2.22 0.420 24.6 5.544 5.17 7.550 7.04 304 2.07 0.420 23.7 5.657 4.92 7.700 6.69 305A 1.03 0.600 16.0 6.969 4.31 9.434 5.83 3058 1 0.23 0.300 14.0 7.437 0.51 10.053 1 0.69 305C 0.10 0.300 14.0 7.437 0.22 10.053 0.30 306 0.65 0.800 10.0 8.635 3.37 11.639 4.54 307 0.48 0.600 10.0 8.635 2.49 11.639 3.35 308 0.56 0.750 14.0 7.437 2.50 10.053 3.38 309 1.56 0.800 23.7 5.657 5.30 7.700 7.21 310 1.16 0.600 20.6 6.106 4.25 8.294 5.77 311 0.33 0.600 19.5 6.299 1.25 8.550 1.69 312 0.85 0.750 15.5 7.087 3.61 9.591 4.89 313 0.31 0.720 10.0 8.635 1.93 11.639 2.60 314 0.30 0.720 10.0 8.635 1.87 11.639 2.51 315 0.14 0.720 10.0 8.635 0.87 11.639 1.17 316 0.64 0.720 10.0 8.635 3.98 11.639 5.36 317 0.80 0.720 10.0 8.635 4.97 11.639 6.70 318 0.72 0.720 10.0 8,635 4.48 11.639 6.03 319 0.68 0.750 12.1 7.943 3.89 10.723 5.25 320 1.03 0.720 10.0 8.635 8.40 11.639 8.63 321 0.54 0.720 10.0 8.635 3.36 11.639 4.53 322 0.16 0.720 10.0 8.635 0.99 11.639 1.34 323 0.17 0.750 10.0 8.635 1.06 11.639 1.42 324 0.06 0.720 10.0 8.635 0.37 11.639 0.50 325 0.06 0.720 10.0 8.835 0.37 11.639 0.50 326 1.03 0.450 14.0 7.437 3.45 10.053 4.66 327 0.59 0.600 10.0 8.635 3.06 11.639 4.12 328 0.13 0.600 10.0 8.635 0.67 11.639 0.91 The Rational Method: Q = CIA I = to I (t +d) t = LI(V - 60) 0 = Flow Ids) t = Time of concentration (min) L = Length (ft A = Area (acres) V = Velocity (fl/sec) C = Runoff Coeff. I = Rainfall Intensity (in/hr) Brazos County: 10 Year storm 100 year storm b= 80 b= 96 d = 8.5 d = 8.0 e = 0.763 e = 0.730 APPENDIX C Depth of Flow in Gutter Summary I q @ I@ I@ / d '$ ,@ @ I � @ � $ @ k @ - !�! �\. @ nc | @ !�! �\. j I| |2 ! - ` - - r §§ ; - � ,,! Bf ■ \ \ }\{ | A la; ,. �, n- r !. !; ;. . ■! , !!§§ §§ §§ ! §! §! §! !! !§ E �! §! § ■ , -0 � §§ ,, ,! ,- - ! | §| §§ |§ ]| ] § 0 PO § ) i §■ ■, ■§ ■| § ■! !■ f| ■■ !! !r i ■! !! !! ,■ | „ :! __ ;; n■ ■: ! •... „ | @ �\. j I| |2 \ \ }\{ | @ § - § | ! %! \�$ § ■° , k |. "E<!, ) /j\\ B! !! §§ ,. ;; ; „ !, �, .■ ; ! || |) §; • !; ,s a ;! , -§ || t� ! § - § | ! %! \�$ § ■° , k |. "E<!, ) /j\\ I I I 1 I I I I I u I APPENDIX D Inlet in Sump Design Analysis L� APPENDIX D University Heights Phase 1 Storm Sewer Inlets in Sump - Design Analysis Inlet Length Q10 D10 D10 Q100 D100 D100' No. ft. cfs ft. in. cfs ft. in. 1101 5 0.58 0.123 1.47 0.78 0.150 1.80 1102 5 0.68 0.137 1.64 0.92 0.167 2.00 1103 10 8.09 0.448 5.37 11.54 0.567 6.81 1104 10 5.85 0.361 4.33 7.89 0.440 5.28 1106 15 9.54 0.382 4.58 12.98 0.468 5.62 1107 10 3.79 0.270 3.24 5.11 0.330 3.96 1108 10 4.85 0.318 3.82 6.54 0.388 4.66 1109 10 4.86 0.319 3.83 6.58 0.390 4.68 1110 3 V-4430 Gutter Inlet 8.36 0.176 2.11 11.28 0.320 3.84 1111 2 V-4430 Gutter Inlet 6.40 0.232 2.78 8.63 0.421 5.05 1112 15 8.33 0.348 4.18 11.23 0.425 5.10 1113 10 2.05 0.179 2.15 2.77 0.219 2.63 ROW elevation is 8" above gutter line so 100 -yr storm runoff is contained within ROW Assume 10% clogging for design f'I �J I I 1 u I 1 APPENDIX E Inlets on Grade Design Analysis I � ƒ!5) / #@@ /! 5 \k ( §! ! /® § \k ) §! § /!!5 \k)) 39!55 at ! ! i! IL !.` \ ¥ 039 .2 , ;l0 ,� {ƒ ()!! I 4l 2 ■�; f\k| \} k!t! �k k �\ /k{ i ;. - �� §! \j/ \\ ;l2 ;7!\§§\ j i 1 1 i i 1 1 1 1 1 1 1 n 1 1 1 Appendix F Pipe Design Summary 1 I i i LJ 1 1 1 LL x p r a W ye Q to I U L 6 0 G n dLL LL 0 t N ^ d m� N M d m � PI Cl o L N t7 C ^ l m Ol O C ^ Cl ^ !l O CI O O O !l Z y ap m = 0 m Y O d f m d O m m d N m UI m d C m N m N m m 6 0 G n dLL LL 0 t N ^ d m� N M d m � PI Cl o L N t7 C ^ l m Ol O C ^ Cl ^ !l O CI O O O !l Z y ap N m r a N m d O n m ' N N � 2 m m C l N m N m m 6 N o W m m 6 Z O O O O O O O O O L O• � m O 3 m N N �1 O � m m � m m W N O) J O m LL O m m Y m d m N N N ^ 0 O $ O ^ E 6 O O O 0 0 0 0 L l �0 o e 0 O b 0 aar o 0 0 0 0 P O 0 N MI m 0 N 6 0 G n dLL LL 0 t N ^ d m� N M d m � PI Cl o L N t7 C ^ l m Ol O C ^ Cl ^ !l O CI O O O !l Z y ap N m r a N m d O n m ' N N � 2 m m C l N m N m m 6 N o W 6 Z O O O O O O O O O L O• � m O 3 m N N �1 O � m m � m m W N O) J O m O O O O O J o 0 0 $ O O X w O O O 0 0 0 0 L l �0 o e 0 O b 6 0 G n m O N ^ N ^ m G N m O Y G o L ' C o O ^ p O C N o Y o d W � Z y ap ' r a N m d O n m ' N N � 2 m 6 0 G n m O N ^ N ^ m G 1l O m O Y G d O C o O ^ N O O N o Y o d ^ f o O d d� J m N m n m N N N m m C l N m N m m 6 N 6 Z O O O O O O O O O L O• � m � m N N �1 O � m m � m m W N O) m o 0 0 0 X w o 0 0 0 0 0 0 0 o e 0 0 aar o 0 0 0 0 0 6 0 G n m O N ^ N ^ m G 1l O m O Y G d O C o O ^ N O O N o Y o d ^ f o O d d� J m N m n m N N N m m C l N m N m m 6 N 6 Z O O O O O O O O O m m c ° c m m nn a . c c 0 0 sa 7 � N N m m m C C m b m nn 2 d r 0 u n y E E WE a.9 E o w c m m N C m m p ,`Qo a m 5 a a m 55 nn 88 mm A y m nnm a'n m � m E E m Lo 0 o m mN n 0 E 4 c w m amxt 99 ` O C C C E E m mm � y C goo c c o 0 0 IL LL = Y r N C L 1 I II u 1 1 1 LL x ' G N 6 w IL E I N T O r ■ a LL m 4 ' O N Cl N a O ' t a Vl a W O O O N E P m m m N m m o m O m a m Yo m ° N l7 m b� m m mi m ml N Cl G Y Y C1 m N N N W L W e D V m � J J m i m o 0 0 0 0 o c o p 0 0 0 o c r o E LL W m b P d Ul Y W N tV t7 N N O � m 6 C d O m O O N H W C O b awe m O O m 4 m O O g W W m W N W W 7 O pj W O C P W A m m b m _O t m n n m m n `n w � n m n m m e`i e b 0 0 m en 4 0 N m O (my m p N p Y N (m o t O W m m m m N m N �Tp O �e O O O C O O W m m O O y b ■ a LL m 4 ' O N Cl N a O ' t a Vl a W O O O N E P m m m N m m o m O m a m Yo m ° N l7 m b� G O N W L W e D V m � J J m i m o 0 0 0 0 o c o p 0 0 0 o c r o d p H C d O m O O N H W C O b awe m O O ■ W r C d a O ' t a a W T - m m P m m m N m m o m O m a m Yo m ° N l7 m b� G O N W L W V m � m i m o 0 0 0 0 o c o p 0 0 0 o c r o d p H C d O m O O N H W C O O awe m na a m m m 6 b 0 0 m 4 0 N m O (my m p N p Y N (m o t O W m m m m N m N �Tp �e ■ W r C d a O ' t a T L m m C d d nn n . a c c 0 0 V N N W W d N t 3 �3 d 6 M " n'n o ti aam b m r N C d d O mm= 5� EEs 88d m m q a o. E E o 'v b O r N C p � C m uN y� .N O O 0 E E m ccm �qy 2S6° c c ° 0o io ll 11 = Z r N m 1 ex. m m P m m m N m m o m O m a m Yo m r N l7 m b� G O L m m C d d nn n . a c c 0 0 V N N W W d N t 3 �3 d 6 M " n'n o ti aam b m r N C d d O mm= 5� EEs 88d m m q a o. E E o 'v b O r N C p � C m uN y� .N O O 0 E E m ccm �qy 2S6° c c ° 0o io ll 11 = Z r N m 1 ex. m � m m ei Y o m a Yo 0 G O V m � I m N m J® d m W O awe m na a L m m C d d nn n . a c c 0 0 V N N W W d N t 3 �3 d 6 M " n'n o ti aam b m r N C d d O mm= 5� EEs 88d m m q a o. E E o 'v b O r N C p � C m uN y� .N O O 0 E E m ccm �qy 2S6° c c ° 0o io ll 11 = Z r N m 1 I 1 1 1 1 m> LL LL x0 IL LU O a� 1 1 ' is a 9� a x ' � N 7 :) N m m ° e j tD N m n n N t0 Cf m i h e x w� � m N O m 7 O 0 N m O N 7 tai N Q �m 6 0 Ol M e u m c � w a a 6 O u m a a m N U G N G G 5 3 $ m e w a 6 O• Y m N 6 i U N T W �a ' c L N a is a 9� a x ' � N 7 :) N m m ° e j tD N m n n N t0 Cf m i h e x w� � m N O m 7 O 0 N m O N 7 tai N Q �m 6 0 Ol M e u m c � w a a 6 O u m a a m N U G N G G 5 3 $ m e w a 6 O• Y m N 6 J 1 1 1 Appendix G 1 1 1 F I Existing Detention Pond Rational Equation Design Analysis 0 .y N j C V 3 0— a p !0 U IM � d Q Q y F I i C N c 'x W C o N m O y o O y r d O 11 II II w n e fo0 . • U C � a It II II l m O y d N y W W � C W m ina c o rnaoo E n It 11 11 c a v W O a v m C a r p C p m_ 61 C O t € .S E o F' a N `m 1I 11 ci II II ° Lei s CY a < L) m a A v N 9 C m •- - iri n m _ tll r a m m � L � N � C O G m n 17! m 0 a A m N m o m m C O N M n a o r ci N ° .v E U m m 0 0 0 M E < m < m E Q x _ b1 € 0 � � OD m O W II II II W a v W W of € 0 y o U rn coo d O 11 II II fo0 . • U C � N J It II II l m O y d N y W W � C W m ina c o rnaoo E n It 11 11 c a v W O a v m C a U p C p m_ 61 C O t € .S E o F' a N `m 1I 11 m m W m 00 0 II II ° m II II II N ° C N b1 € 0 � � OD m O W II II II W a v W W of ° o y l m y d N W co m C N d o C ❑ N m m o 11 It 11 G . 4 — W o Co a v m : LL 11 ! L II 11 II II ° CY a < L) m ' University Heights Subdivision Existing Detention Pond Area - Capacity Data ' Regraded to Wet Pond V = H " {[A1 +A2 + (Al *A2) 13) V = volume, ft A = area, ft ' H = difference in elevation, ft 1 1 1 1 1 1 1 Area - Ca 3acity Data Elevation ft Depth ft Area (ft Area acres Volume (ft) Cumulative Volume (ft?) 90% Cumulative Volume (ft) 90% Cumulative Volume (ac -ft) 306.67 0.00 0 0.00 0 0 0 0.00 307.00 0.33 30,572 0.70 3,363 3,363 3,027 0.07 308.00 1.33 59,445 1.36 44,216 47,579 42,821 0.98 309.00 2.33 78,295 1.80 68,654 116,233 104,609 2.40 309.12 2.45 80,661 1.85 9,537 125,770 113,193 2.60 310.00 3.33 98,014 2.25 78,493 204,263 183,837 4.22 310.50 3.83 101,521 2.33 49,881 254,144 228,730 5.25 311.00 4.33 105,028 2.41 51,635 305,779 275,201 6.32 311.12 4.45 105,878 2.43 12,654 318,433 286,590 6.58 311.50 4.83 108,572 2.49 40,744 359,178 323,260 7.42 312.00 5.33 111,210 2.55 54 414,122 372,710 8.56 C O N V �> C O N O 4 C t r CM 'd o x � 4) K > W C C O r !C d d cis d i+ L 0 V Z V N '3 t N CL 0 d M w 'o O C O) d 3 y m° C p w 0 0 t0 V to , r N M O F N 3�0000000fOmmLf; O ° 0 0 0 0 0 0 0 0 "OV m N C LL O to 0 0 0 0 0 D1 0 0 O N v 3 O N V Ih O O f� M f� 0 00 N 00 M 00 0 01 K N_ O (D 00 Cl) 0 N d i+ V LL m� O w V' O O O N LO N 0 T r a� O r+ 0 CM t N V Mn D me ,dam t o r- 0 0 0 0 0 0 o 0 0"t o 0 0 0 0 0 0 0 0 C C 3 0 0 0 0 0 0 0 0 0 v LL N c O O 0 0 N N O. LL w 0 00 f0 O r 00 N V C r N W .- O r N N N E ,. N ( P� OD O O 0 v 3 r O M M C7 Ln M co Cl) LO Cl) M C CL O fM M M V M OD Mll� 00 M a m 0O NNMC) V V qt LO C O 00000N000 NOO 'o 00000000 tf)O 00 f-:006 ai C)O rN y" 0 0 0 0 0 M M M CM M f`') fM CM M Cr) M W F I I I I I F I 1 �J I I I I I I University Heights Subdivision - Existing Detention Pond Storage Routing Analysis Parameters t =60s Detention Pond Elevation Depth Discharge Storage Zen z aft +o n n O, efs s c 306.67 0.00 0.0 0 0.0 0.00 307.00 0.33 1.58 3027 100.9 102.5 308.00 1.33 12.77 42821 1427.4 1440.1 309.00 2.33 29.61 104609 3487.0 3516.6 30912 2.45 31.93 113193 37731 3805.0 310.00 3.33 54.70 183837 6127.9 6182.6 310.50 3.83 70.50 228730 7624.3 7694.8 311.00 4.33 126.10 275201 9173.4 9299.5 311.12 4.45 145.50 286590 9553.0 9698.5 311.50 4.83 218.90 323260 10775.3 10994.2 312.00 5.33 345.10 372710 12423.7 12768.8 University Heights Subdivision - Existing Detention Pond Storage Routing Analysis Parameters Plugged Condition t =60s Detention Pond Elevation Depth Discharge Storage 2 a/t 2 s/t + O ft ft O, efs s, e 306.67 0.00 0 0 0.0 0.0 307.00 0.33 0 3027 100.9 100.9 308.00 1.33 0 42821 1427.4 1427.4 309.00 2.33 0 104609 3487.0 3487.0 309.12 2.45 0 113193 3773.1 3773.1 310.00 3.33 0 183837 6127.9 6127.9 310.50 3.83 0 228730 7624.3 7624.3 311.00 4.33 46 275201 9173.4 9219.0 311.12 4.45 64 286590 9553.0 9616.5 311.50 4.83 134 323260 10775.3 10909.2 312.00 5.33 255 372710 12423.7 12678.8 Pond -data- for - routing. xls N Z . a c Crn d O OM 'O C >� w = N W N Z W �a CL �a N N m y LM d U d N 0 T N ] O 9 N C an B C a O i a y B H V � M N N 1 O` N (Sp) OBJeyasid w 0 LO 0 B m B C �y O B M y B H N B B B B co ' �' C 8 t \ \ ♦ ♦ \ ♦ ♦♦ / ® /. ® \ /. ♦ / ♦\ i ♦ \\ M .0 / % N / \ \ ♦ a \ ♦ ♦ V � M N N 1 O` N (Sp) OBJeyasid w 0 LO 0 m C �y O M y H N 0 0 I I I I I I I I I I I Storage Routing Analysis University Heights Subdivision Existing Detention Pond 2 -Year Storm Event Time I "n°w 1 +12 EXISTING POND- Routing.As I Pond P� Total Pro Time 2stt 2stt+o Discharge Discharge Discharge DDischame iminA 1..1§1 11+31 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 2.94 2.94 2.85 2.94 0.05 2.59 2.64 0.98 2 5.88 8.82 11.31 11.67 0.18 5.19 5.37 1.95 3 8.82 14.70 25.21 26.02 0.40 7.78 8.18 2.93 4 11.76 20.59 44.39 45.80 0.71 10.37 11.08 3.90 5 14.70 26.47 68.67 70.86 1.09 12.97 14.06 4.88 6 17.64 32.35 97.91 101.02 1.56 15.56 17.12 5.85 7 20.59 38.23 132.41 136.14 1.86 18.15 20.01 6.83 8 23.53 44.11 172.13 176.53 2.20 20.74 22.94 7.81 9 26.47 49.99 216.96 222.12 2.58 23.34 25.92 8.78 10 29.41 55.88 266.82 272.83 3.00 25.93 28_93 9.76 11 32.35 61.76 321.64 328.56 3.47 24.63 28.10 10.73 12 35.29 67.64 381.32 389.28 3.98 23.34 27.32 11.71 13 38.23 73.52 445.78 454.84 4.53 22.04 26.57 12.69 14 41.17 79.40 514.95 525.18 5.12 20.74 25.86 13.66 15 44.11 85.28 588.75 600.24 5.74 19.45 25.19 14.64 16 47.05 91.16 667.09 679.91 6.41 18.15 24.56 15.61 17 49.99 97.05 749.91 764.14 7.12 16.85 23.97 16.59 18 52.93 102.93 837.12 852.84 7.86 15.56 23.42 17.56 19 55.88 108.81 928.66 945.93 8.64 14.26 22.90 18.54 20 58.82 114.69 1024.45 1043.35 9.45 12.97 22.42 19.52 21 61.76 120.57 1124.42 1145.02 10.30 11.67 21.97 20.49 22 64.70 126.45 1228.50 1250.87 11.19 10.37 21.56 21.47 23 67.64 132.34 1336.62 136014 12.11 9.08 21.18 22.44 24 70.58 138.22 1448.74 1474.84 13.05 7.78 20.83 23.42 25 73.52 144.10 1564.82 1592.83 14.01 6.48 20.49 24.39 26 72.05 145.57 1660.46 1710.39 14.96 5.19 20.15 25.37 27 70.58 142.63 1791.34 1823.09 15.88 3.89 19.77 26.35 28 69.11 139.69 1897.53 1931.03 16.75 2.59 19.34 27.32 29 67.64 136.75 1999.10 2034.27 17.59 1.30 18.89 28.30 30 66.17 133.81 2096.12 2132.90 18.39 0.00 18.39 29.27 31 64.70 130.87 2188.69 2226.99 19.15 0.00 19.15 30.25 32 63.23 127.92 2276.86 2316.61 19.68 0.00 19.88 31.23 33 61.76 124.98 2380.70 2401.84 20.57 0.00 20.57 3120 34 60.29 122.04 2440.29 2482.74 21.23 0.00 21.23 33.18 35 58.82 119.10 2515.70 2559.39 21.85 0.00 21.85 34.15 36 57.35 116.16 2586.99 2631.86 22.43 0.00 - 22.43 35.13 37 55.88 113.22 2854.23 2700.21 22.99 0.00 22.99 36.10 38 54.40 110.28 2717.49 2764.51 23.51 0.00 23.51 37.08 39 52.93 107.34 2776.83 2824.83 24.00 0.00 24.00 36.59 40 51.46 104.40 2832.32 2881.23 24.46 0.00 24.46 36.10 41 49.99 101.46 2884.01 2933.77 24.88 0.00 24.88 35.62 42 48.52 98.52 2931.97 2982.52 25.28 0.00 25.28 35.13 43 47.05 95.58 2976.25 3027.54 25.64 0.00 25.64 34.64 44 45.58 92.64 3016.93 3068.69 25.98 0.00 25.98 34.15 45 44.11 89.69 3054.06 3106.63 26.29 0.00 26.29 33.66 46 42.64 86.75 3087.68 3140.81 26.56 0.00 26.56 33.18 47 41.17 83.81 3117.87 3171.50 26.81 0.00 26.81 32.69 48 39.70 80.87 3144.68 3198.75 27.03 0.00 27.03 32.20 49 38.23 77.93 3168.16 3222.61 27.23 0.00 27.23 31.71 50 36.76 74.99 3188.37 3243.15 27.39 0.00 27.39 31.23 51 35.29 72.05 3205.35 3260.42 27.53 0.00 27.53 30.74 52 33.82 69.11 3219.17 3274.46 27.65 0.00 27.65 30.25 53 32.35 66.17 3229.87 3285.34 27.73 0.00 27.73 29.76 54 30.88 63.23 3237.50 3293.09 27.80 0.00 27.80 29.27 55 29.41 60.29 3242.11 3297.79 27.84 0.00 27.84 28.79 56 27.94 57.35 3243.76 3299.46 27.85 0.00 27.85 28.30 57 26.47 54.40 3242.49 3298.17 27.84 0.00 27.84 27.81 58 25.00 51.46 3238.35 3293.95 27.80 0.00 27.80 27.32 59 23.53 48.52 3231.37 3286.87 27.75 0.00 27.75 26.83 60 22.06 45.58 3221.62 3276.96 27.67 0.00 27.67 26.35 61 20.59 42.64 3209.14 3264.27 27.56 0.00 27.56 25.86 62 19.12 39.70 3193.96 3248.84 27.44 0.00 27.44 25.37 63 17.64 36.76 3176.14 3230.72 27.29 0.00 27.29 24.88 EXISTING POND- Routing.As I Storage Routing Analysis University Heights Subdivision Existing Detention Pond 2•YearStorm Event �' � �" � �m Ti me Inflow nfl o1 Itrl2 11+12 28/t-0 2s/[ +G Discharge sc Olschame Olschame 1 64 16.17 33.82 3155.71 3209.96 27.12 0.00 27.12 24.39 65 14.70 30.88 3132.72 3186.59 26.93 0.00 26.93 23.91 66 13.23 27.94 3107.21 3160.66 26.72 0.00 26.72 23.42 67 11.76 25.00 3079.23 3132.21 26.49 0.00 26.49 22.93 68 10.29 22.06 3048.80 3101.28 26.24 0.00 26.24 22.44 69 8.82 19.12 3015.97 3067.91 25.97 0.00 25.97 21.96 70 7.35 16.17 2980.78 3032.14 25.68 0.00 25.68 21.47 71 5.88 13.23 2943.27 2994.02 25.37 0.00 25.37 20.98 72 73 4.41 2.94 10.29 7.35 2903.48 2861.43 2953.56 2910.83 25.04 24.70 0.00 0.00 25.04 24.70 20.49 20.00 74 1.47 4.41 2817.18 2865.85 24.33 0.00 24.33 19.52 75 0.00 1.47 2770.75 2818.65 23.95 0.00 23.95 19.03 76 0.00 0.00 2723.83 2770.75 23.56 0.00 23.56 18.54 77 0.00 0.00 2677.27 2723.63 23.18 0.00 23.18 18.05 78 0.00 0.00 2631.66 2677.27 22.80 0.00 22.80 17.56 79 0.00 0.00 2586.80 2631.66 22.43 0.00 22.43 17.08 80 0.00 0.00 2542.66 2586.80 22.07 0.00 22.07 16.59 81 0.00 0.00 2499.24 2542.66 21.71 0.00 21.71 16.10 82 0.00 0.00 2456.52 2499.24 21.36 0.00 21.36 15.61 1 83 0.00 0.00 2414.49 2456.52 21.01 0.00 21.01 15.12 84 0.00 0.00 2373.15 2414.49 20.67 0.00 20.67 14.64 85 0.00 0.00 2332.47 2373.15 20.34 0.00 20.34 14.15 86 0.00 0.00 2292.46 2332.47 20.01 0.00 20.01 13.66 87 0.00 0.00 2253.09 2292.46 19.68 0.00 19.68 13.17 88 0.00 0.00 2214.37 2253.09 19.36 0.00 19.36 12.69 89 0.00 0.00 2176.27 2214.37 19.05 0.00 19.05 12.20 90 0.00 0.00 2138.79 2176.27 18.74 0.00 18.74 11.71 91 0.00 0.00 2101.92 2138.79 18.44 0.00 18.44 11.22 92 0.00 0.00 2065.64 2101.92 18.14 0.00 18.14 10.73 93 0.00 0.00 2029.96 2065.64 17.84 0.00 17.84 10.25 94 0.00 0.00 1994.85 2029.96 17.55 0.00 17.55 9.76 95 0.00 0.00 1960.31 1994.85 17.27 0.00 17.27 9.27 96 0.00 0.00 1926.33 1960.31 16.99 0.00 16.99 8.76 97 0.00 0.00 1892.91 1926.33 16.71 0.00 16.71 8.29 98 0.00 0.00 1860.02 1892.91 16.44 0.00 16.44 7.81 99 0.00 0.00 1827.67 1860.02 16.18 0.00 1818 7.32 100 0.00 0.00 1795.85 1827.67 15.91 0.00 15.91 6.63 101 0.00 0.00 1764.54 1795.85 15.66 0.00 15.66 6.34 102 0.00 0.00 1733.73 1764.54 15.40 0.00 15.40 5.85 103 0.00 0.00 1703.43 1733.73 15.15 0.00 15.15 5.37 104 0.00 0.00 1673.62 1703.43 14.91 0.00 14.91 4.88 105 0.00 0.00 1644.29 1673.82 14.66 0.00 14.66 4.39 1 106 0.00 0.00 1615.44 1644.29 14.43 0.00 14.43 3.90 107 0.00 0.00 1587.06 161544 14.19 0.00 14.19 142 108 0.00 0.00 1559.13 1587.06 13.96 0.00 13.96 2.93 109 0.00 0.00 1531.66 155913 13.74 0.00 13.74 2.44 110 0.00 0.00 1504.64 1531.66 13.51 0.00 13.51 1.95 111 0.00 0.00 1478.05 1504.64 13.29 0.00 13.29 1.46 112 0.00 0.00 1451.89 1478.05 13.08 0.00 13.08 0.98 113 0.00 0.00 1426.16 1451.89 12.87 0.00 12.87 0.49 114 0.00 0.00 1400.86 1426.16 12.65 0.00 12.65 0.00 115 0.00 0.00 1375.97 1400.86 12.44 0.00 12.44 0.00 116 0.00 0.00 1351.51 1375.97 12.23 0.00 12.23 0.00 117 0.00 0.00 1327.45 1351.51 12.03 0.00 12.03 0.00 118 0.00 0.00 1303.79 1327.45 11.83 0.00 11.83 0.00 119 0.00 0.00 1280.53 1303.79 11.63 0.00 11.63 0.00 120 0.00 0.00 1257.66 1280.53 11.44 0.00 11.44 0.00 121 0.00 0.00 1235.18 1257.66 11.24 0.00 11.24 0.00 122 0.00 0.00 1213.05 1235.18 11.06 0.00 11.06 0.00 123 0.00 0.00 1191.32 1213.06 10.87 0.00 10.87 0.00 ' 124 0.00 0.00 1169.95 1191.32 10.69 0.00 10.69 0.00 125 0.00 0.00 1148.93 1169.95 10.51 0.00 10.51 0.00 126 0.00 0.00 1128.26 1148.93 10.33 0.00 10.33 0.00 127 0.00 0.00 1107.93 1128.26 10.16 0.00 10.16 0.00 EXISTING POND- Routing.xls I I I i EXISTING POND- ROU0ng,AS I Storage Routing Analysis University Heights Subdivision Existing Detention Pond 2 -Year Storm Event P one pA 205 TOtal Pre -Dev Time I nflow 11 +12 M 2an+O Dischame Discharge Dischame Discha lmw LQW L91s1 128 0.00 0.00 1087.95 1107.93 9.99 0.00 9.99 0.00 129 0.00 0.00 1068.30 1087.95 9.82 0.00 9.82 0.00 130 0.00 0.00 1048.98 1068.30 9.66 0.00 9.66 0.00 131 0.00 0.00 1029.99 1048.98 9.50 0.00 9.50 0.00 132 0.00 0.00 1011.31 1029.99 9.34 0.00 9.34 0.00 133 0.00 0.00 992.94 1011.31 9.18 0.00 9.18 0.00 134 0.00 0.00 974.89 992.94 9.03 0.00 9.03 0.00 135 0.00 0.00 957.13 974.89 8.88 0.00 8.88 0.00 136 0.00 0.00 939.67 957.13 873 0.00 8.73 0.00 137 0.00 0.00 922.50 939.67 8.58 0.00 8.58 0.00 138 0.00 0.00 905.62 922.50 8.44 0.00 8.44 0.00 139 0.00 0.00 889.03 905.62 8.30 0.00 8.30 0.00 140 0.00 0.00 872.71 889.03 8.16 0.00 8.16 0.00 141 0.00 0.00 856.66 872.71 8.02 0.00 8.02 0.00 142 0.00 0.00 840.88 856.66 7.89 0.00 7.89 0.00 143 0.00 0.00 825.37 640.88 7.76 0.00 7.76 0.00 144 0.00 0.00 810.11 825.37 7.63 0.00 7.63 0.00 145 0.00 0.00 795.11 810.11 7.50 0.00 7.50 0.00 146 0.00 0.00 780.37 795.11 7.37 0.00 7.37 0.00 ' 147 0.00 0.00 765.86 780.37 7.25 0.00 7.25 0.00 148 0.00 0.00 751.60 765.86 7.13 0.00 7.13 0.00 149 0.00 0.00 737.58 751.60 7.01 0.00 7.01 0.00 150 0.00 0.00 723.80 737.58 6.89 0.00 6.89 0.00 151 0.00 0.00 710.24 723.80 6.78 0.00 6.78 0.00 152 0.00 0.00 698.91 710.24 6.66 0.00 6.66 0.00 153 0.00 0.00 683.81 696.91 6.55 0.00 6.55 0.00 154 0.00 0.00 670.92 683.81 6.44 0.00 6.44 0.00 155 0.00 0.00 658.25 670.92 6.34 0.00 6.34 0.00 156 0.00 0.00 645.79 658.25 6.23 0.00 613 0.00 157 0.00 0.00 63154 645.79 6.13 0.00 6.13 0.00 158 0.00 0.00 621.50 633.54 6.02 0.00 6.02 0.00 159 0.00 0.00 609.66 621.50 5.92 0.00 5.92 0.00 160 0.00 0.00 598.01 609.66 5.82 0.00 5.82 0.00 ' 161 0.00 0.00 586.56 598.01 5.73 0.00 5.73 0.00 162 0.00 0.00 575.30 586.56 5.63 0.00 5.63 0.00 163 0.00 0.00 584.23 575.30 5.54 0.00 5.54 0.00 164 0.00 0.00 553.34 564.23 5.44 0.00 544 0.00 1 165 0.00 0.00 542.64 553.34 5.35 0.00 5.35 0.00 166 0.00 0.00 532.12 542.64 5.26 0.00 5.26 0.00 167 0.00 0.00 521.77 532.12 5.17 0.00 5.17 0.00 168 0.00 0.00 511.59 521.77 5.09 0.00 5.09 0.00 169 0.00 0.00 501.59 511.59 5.00 0.00 5.00 0.00 ' 170 0.00 0.00 491.75 501.59 4.92 0.00 4.92 0.00 171 0.00 0.00 482.08 491.75 4.84 0.00 4.84 0.00 172 0.00 0.00 472.57 482.08 4.76 0.00 4.76 0.00 173 0.00 0.00 463.22 472.57 4.68 0.00 4.68 0.00 174 0.00 0.00 454.02 463.22 4.60 0.00 4.60 0.00 175 0.00 0.00 444.98 454.02 4.52 0.00 4.52 0.00 176 0.00 0.00 436.09 444.98 4.45 0.00 4.45 0.00 177 0.00 0.00 427.35 436.09 4.37 0.00 4.37 0.00 178 0.00 0.00 418.75 427.35 4.30 0.00 4.30 0.00 179 0.00 0.00 410.30 418.75 4.23 0.00 4.23 0.00 180 0.00 0.00 401.99 410.30 4.15 0.00 4.15 0.00 I I i EXISTING POND- ROU0ng,AS I N 21 y m A A / QI N_ ] OI 4 9 N N 0 N L m U oo 75 0i U mo CL o E ao M I B d a I F I N t n. D i C O oa •`o T C 2 U) w G • K W w6 E oC 0)z ` W IL }a 0 ( N C Cl) N ° o 0 W. 0 0 0 ! / d / o E M ..r d a F 0 a N / B d a d M ! i P a \ ♦ \ \ \ ♦ % / ♦ \ / \ x ♦ /. % V \ / LO / ♦ / ♦ CD \ / \ �.\ ♦ s ♦ ♦ ♦ ( N C Cl) N ° o 0 W. 0 0 0 N d o E M ..r d F 0 N 0 0 0 0 0 (S)o) Moigno I I I J I I I I I I I I 1 I Storage Routing Analysis University Heights Subdivision Existing Detention Pond 10 -Year Storm Event EXISTING POND- Rodng.zls F Pond DA 201 Total Pre-Dev Time Inflow 11 +12 2en.0 2sx +O Discharge Discharge Discharge Discharge ,MW l91§] 1cfF1 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 4.16 4.16 4.03 4.16 0.06 3.54 3.60 1.40 2 8.32 12.48 16.00 16.51 0.25 7.08 7.33 2.81 3 12.48 20.79 35.66 36.79 0.57 10.61 11.18 4.21 4 16.64 29.11 62.77 84.77 1.00 14.15 15.15 5.62 5 20.79 37.43 97.11 100.20 1.54 17.69 19.23 7.02 6 24.95 45.75 139.02 142.86 1.92 21.23 23.15 8.43 7 29.11 54.06 188.41 193.09 2.34 24.77 27.10 9.83 8 33.27 62.38 245.15 250.79 2.82 28.30 31.12 11.23 9 37.43 70.70 309.12 315.85 3.36 31.84 35.21 12.64 10 41.59 79.02 380.20 388.14 3.97 35.38 39.35 14.04 11 45.75 87.33 458.27 467.54 4.63 33.61 38.24 15.45 12 49.91 95.65 543.21 553.92 5.36 31.84 37.20 16.85 13 54.06 103.97 634.91 647.18 614 30.07 36.21 18.25 14 58.22 112.29 733.25 747.19 6.97 28.30 35.28 19.66 15 62.38 120.61 838.12 853.85 7.87 26.54 34.40 21.06 16 86.54 128.92 949.42 967.04 8.81 24.77 33.58 22.47 17 70.70 137.24 1067.03 1086.66 9.81 23.00 32.81 23.87 18 74.86 145.56 1190.86 1212.59 10.87 21.23 32.09 25.28 19 79.02 153.88 1320.79 1344.73 11.97 19.46 31.43 26.68 20 83.18 162.19 1456.75 1482.98 13.12 17.69 30.81 28.08 21 87.33 170.51 1598.68 1827.26 14.29 15.92 30.21 29.49 22 91.49 178.83 1746.50 1777.51 15.51 14.15 29.66 30.89 23 95.65 187.15 1900.10 1933.64 1637 12.38 29.16 32.30 24 99.81 195.46 2059.39 2095.56 18.09 10.61 28.70 33.70 25 103.97 203.78 2224.28 2263.17 19.44 8.85 28.29 35.11 26 101.89 205.86 2388.54 2430.14 20.80 7.08 27.88 36.51 27 99.81 201.70 2546.05 2590.25 22.10 5.31 27.40 37.91 28 97.73 197.54 2896.91 2743.59 23.34 3.54 26.88 39.32 29 95.65 193.38 2841.23 2890.30 24.53 1.77 26.30 40.72 30 93.57 189.23 2979.12 3030.46 25.67 0.00 25.67 42.13 31 91.49 185.07 3110.69 3164.19 26.75 0.00 26.75 43.53 32 89.41 180.91 3236.02 3291.59 27.79 0.00 27.79 44.93 33 87.33 176.75 3355.24 3412.77 28.77 0.00 2817 46.34 34 85.26 172.59 3468.43 3527.83 29.70 0.00 2970 4714 35 83.18 168.43 3575.70 3636.88 30.58 0.00 30.58 49.15 36 81.10 164.27 3677.16 3739.98 3141 0.00 31.41 50.55 37 79.02 160.11 3772.80 3837.28 32.24 0.00 32.24 51.96 38 76.94 155.98 3862.52 3928.75 33.12 0.00 33.12 $3,36 39 74.86 151.80 3946.45 4014.32 33.93 0.00 33.93 52.86 40 72.78 147.64 4024.69 4094.09 34.70 0.00 34.70 51.96 41 70.70 143.48 4097.35 4168.17 35.41 0.00 35.41 51.25 42 68.62 139.32 4164.54 4236.67 36.06 0.00 36.06 50.55 43 66.54 135.16 4226.37 4299.70 36.67 0.00 36.67 49.85 44 64.46 131.00 4282.93 4357.37 37.22 0.00 37.22 49.15 45 62.38 126.84 4334.33 440977 37.72 0.00 37.72 48.45 46 60.30 122.68 4380.67 4457.02 38.17 0.00 38.17 47.74 47 58.22 118.53 4422.04 4499.19 38.58 0.00 38.58 47.04 48 56.14 114.37 4456.53 4536.40 38.93 0.00 38.93 46.34 49 54.06 110.21 4490.25 4568.74 39.24 0.00 39.24 45.64 50 51.98 106.05 4517.29 4596.30 39.51 0.00 39.51 44.93 51 49.91 101.89 4539.72 4619.18 39.73 0.00 39.73 4423 52 47.83 97.73 4557.65 4637.45 39.90 0.00 39.90 43.53 53 45.75 93.57 4571.15 4651.22 40.03 0.00 40.03 42.83 54 43.67 89.41 4580.32 4660.57 40.12 0.00 40.12 42.13 55 41.59 85.26 4585.23 4665.58 40.17 0.00 40.17 41.42 56 39.51 81.10 4585.97 4666.33 40.18 0.00 40_18 4072 57 37.43 76.94 4582.62 4662.91 40.15 0.00 40.15 40.02 58 35.35 72.78 4575.25 4655.40 40.07 0.00 40.07 39.32 59 33.27 68.62 4563.94 4643.87 39.96 0.00 39.96 38.62 so 31.19 64.48 4548.77 4628.40 39.82 0.00 39.82 37.91 61 29.11 60.30 4529.81 4609.07 39.63 0.00 39.63 3711 tit 27.03 56.14 4507.14 4585.96 39.41 0.00 39.41 36.51 EXISTING POND- Rodng.zls F P 1 I I 1 I I I I L I I L� I 1 Storage Routing Analysis University Heights Subdivision Existing Detention Pond 10•Year Storm Event EXISTING POND- Routin9.xls Pond DA 201 Total Pre -Dev T ime Inflow 1111 +12 2sK-0 2s +O MCharge Discharge Discharge Qlach (91in. (am LCd>31 63 24.95 51.98 4480.82 4559.12 39.15 0.00 39.15 35.81 84 22.87 47.83 4450.93 4528.65 38.86 0.00 38.86 35.11 65 20.79 43.67 4417.52 4494.59 38.53 0.00 38.53 34.40 66 18.71 39.51 4380.68 4457.03 38.17 0.00 38.17 3170 67 16.64 35.35 4340.47 4416.03 37.78 0.00 3718 33.00 68 14.56 31.19 4296.95 4371.66 37.36 0.00 37.36 32.30 Be 12.48 27.03 4250.18 4323.98 36.90 0.00 36.90 31.59 70 10.40 22.87 4200.23 4273.05 36.41 0.00 36.41 30.89 71 8.32 18.71 4147.15 4218.94 35.89 0.00 35.89 30.19 72 6.24 14.56 4091.02 4161.71 35.35 0.00 35.35 29.49 73 4.16 10.40 4031.88 4101.41 3477 0.00 34.77 28.79 74 2.08 6.24 3969.79 4038.11 34.16 0.00 34.16 28.08 75 0.00 2.08 3904.81 3971.87 33.53 0.00 33.53 27.38 76 0.00 0.00 3839.04 3904.81 32.89 0.00 32.89 26.68 77 0.00 0.00 3774.53 3839.04 32.26 0.00 32.26 25.98 78 0.00 0.00 3711.16 3774.53 31.68 0.00 31.68 25.28 79 0.00 0.00 3648.81 3711.16 31.18 0.00 31.18 24.57 80 0.00 0.00 3587.46 3648.81 30.67 0.00 30.67 23.87 81 0.00 0.00 3527.10 3587.46 30.18 0,00 WAS 23.17 82 0.00 0.00 3467.71 3527.10 29.69 0.00 29.69 22.47 83 0.00 0.00 340929 3467.71 29.21 0.00 29.21 21.77 84 0.00 0.00 3351.81 3409.29 28.74 0.00 28.74 21.08 85 0.00 0.00 329526 3351.81 28.27 0.00 28.27 20.36 86 0.00 0.00 3239.63 3295.26 27.81 0.00 27.81 19.68 87 0.00 0.00 3184.90 3239.63 27.36 0.00 27.36 18.96 88 0.00 0.00 3131.06 3184.90 26.92 0.00 26.92 18.25 89 0.00 0.00 3078.10 3131.06 26.48 Ooo 26.48 17.55 90 0.00 0.00 3025.99 3078.10 26.05 0.00 26.05 16.85 91 0.00 0.00 2974.73 3025.99 25.63 0.00 25.63 16.15 92 0.00 0.00 2924.29 2974.73 25.22 0.00 2522 15.45 93 0.00 0.00 2874.68 2924.29 24.81 0.00 24.81 14.74 94 0.00 0.00 2825.87 2874.68 24.40 0.00 24.40 14.04 95 0.00 0.00 2777.86 2825.87 24.01 0.00 24.01 13.34 98 0.00 0.00 2730.62 2777.86 23.62 0.00 - 23.62 12.64 97 0.00 0.00 2684.15 2730.62 23.24 0.00 23.24 11.94 98 0.00 0.00 2638.43 2684.15 22.86 0.00 22.86 11.23 99 0.00 0.00 2593.45 2638.43 22.49 0.00 22.49 10.53 100 0.00 0.00 2549.21 2593.45 22.12 0.00 22.12 9.83 101 0.00 0.00 2505.88 2549.21 21.76 0.00 21.76 9.13 102 0.00 0.00 2462.85 2505.68 21.41 0.00 21.41 8.43 103 0.00 0.00 2420.72 2462.85 21.06 0.00 21.06 7.72 104 0.00 0.00 2379.28 2420.72 2032 0.00 20.72 7.02 105 0.00 0.00 2338.51 2379.28 20.39 0.00 20.39 6.32 106 0.00 0.00 2298.39 2338.51 20.06 0.00 20.06 5.62 107 0.00 0.00 2258.93 2298.39 19.73 0.00 19.73 4.91 108 OM 0.00 2220.11 2258.93 19.41 0.00 19.41 4.21 109 0.00 0.00 2181.92 2220.11 19.10 0.00 19.10 3.51 110 0.00 0.00 2144.35 2181.92 18.79 0.00 18.79 2.81 111 0.00 0.00 2107.39 2144.35 18.48 0.00 18.48 2.11 112 0.00 0.00 2071.02 2107.39 16.18 0.00 18.18 1.40 113 0.00 0.00 2035.25 2071.02 17.89 0.00 17.89 0.70 114 0.00 0.00 2000.06 2035.25 17.60 0.00 17.60 0.00 115 0.00 0.00 1965.43 2000.06 17.31 0.00 17.31 0.00 118 0.00 0.00 1931.37 1965.43 17.03 0.00 17.03 0.00 117 0.00 0.00 1897.86 1931.37 16.75 0.00 16.75 0.00 118 0.00 0.00 1864.90 1897.86 16.48 0.00 16.48 0.00 119 0.00 0.00 1832.47 1864.90 16.22 0.00 1622 0.00 120 0.00 0.00 1800.57 1832.47 15.95 0.00 15.95 0.00 121 0.00 0.00 1769.18 1800.57 15.69 0.00 15.69 0.00 122 0.00 0.00 1738.30 1769.18 15.44 0.00 15.44 0.00 123 0.00 0.00 1707.93 1738.30 15.19 0.00 1519 0.00 124 0,00 0.00 1678.04 1707.93 14.94 0.00 14.94 0.00 125 0.00 0.00 1648.64 1678.04 14.70 0.00 14.70 0.00 EXISTING POND- Routin9.xls I 1 EXISTING POND- Routing.xls I Storage Routing Analysis University Heights Subdivision Existing Detention Pond 10 -Year Storm Event P DA 2-1- Total P e- P Time Inflow 11 +12 - 2en.0 Zstt+O Discharge Discharge Discharge Dlschamo 1mID.1 LCN f9w ' 126 0.00 0.00 1619.72 1648.64 14.46 0.00 14.46 0.00 127 0.00 0.00 1591.27 161972 14.23 0.00 14.23 0.00 128 0.00 0.00 1563.27 1591.27 14.00 0.00 14.00 0.00 129 0.00 0.00 1535.74 1563.27 13.77 0.00 13.77 0.00 130 0.00 0.00 1508.65 1535.74 13.55 0.00 13.55 0.00 131 0.00 0.00 1481.99 1508.65 13.33 0.00 13.33 0.00 132 0.00 0.00 1455.77 1481.99 13.11 0.00 13.11 0.00 133 0.00 0.00 1429.98 1455.77 12.90 0.00 12.90 0.00 134 0.00 0.00 1404.61 1429.98 12.69 0.00 12.69 0.00 135 0.00 0.00 1379.66 1404.61 12.47 0.00 12.47 0.00 136 0.00 0.00 1355.13 1379.86 12.26 0.00 12.26 0.00 137 0.00 0.00 1331.02 1355.13 12.06 0.00 1206 . 0.00 138 0.00 0.00 1307.30 1331.02 11.86 0.00 11.86 0.00 139 0.00 0.00 1283.98 1307.30 11.66 0.00 11.66 0.00 140 0.00 0.00 1261.05 1283.98 11.46 0.00 11.46 0.00 141 0.00 0.00 1238.51 1261.05 11.27 0.00 11.27 0.00 142 0.00 0.00 1216.34 1238.51 11.08 0.00 11.08 0.00 143 144 0.00 0.00 0.00 0.00 1194.55 1173.12 1216.34 1194.55 10.90 10.72 0.00 0.00 10.90 10.72 0.00 0.00 145 0.00 0.00 1152.04 1173.12 10.54 0.00 10.54 0.00 146 0.00 0.00 1131.32 1152.04 10.36 0.00 10.36 0.00 147 0.00 0.00 1110.95 1131.32 10.19 0.00 10.19 0.00 148 0.00 0.00 1090.92 1110.95 10.02 0.00 10.02 0.00 149 0.00 0.00 1071.22 1090.92 9.85 0.00 9.85 0.00 150 0.00 0.00 1051.85 1071.22 9.68 0.00 9.68 0.00 151 0.00 0.00 1032.81 1051.85 9.52 0.00 9.52 0.00 152 0.00 0.00 1014.08 1032.81 9.36 0.00 9.36 0.00 153 0.00 0.00 995.67 1014.08 9.21 0.00 9.21 0.00 154 0.00 0.00 977.56 995.67 9.05 0.00 9.05 0.00 155 0.00 0.00 959.76 977.56 8.90 0.00 8.90 0.00 156 0.00 0.00 942.26 959.76 8.75 0.00 6.75 0.00 157 158 0.00 0.00 0.00 0.00 925.05 908.13 942.26 925.05 8.61 8.46 0.00 0.00 8.61 8.46 0.00 0.00 159 0.00 0.00 891.49 908.13 8.32 0.00 - 8.32 0.00 160 0.00 0.00 875.13 891.49 8.18 0.00 8.18 0.00 161 0.00 0.00 859.04 875.13 8.04 0.00 8.04 0.00 162 0.00 0.00 843.22 859.04 7.91 0.00 7.91 0.00 163 0.00 0.00 827.67 843.22 7.78 0.00 7.78 0.00 164 0.00 0.00 812.38 827.67 7.65 0.00 7.65 0.00 165 0.00 0.00 797.34 812.38 7.52 0.00 7.52 0.00 166 0.00 0.00 782.55 797.34 7.39 0.00 7.39 0.00 187 0.00 0.00 768.01 782.55 7.27 0.00 7.27 0.00 ' 168 0.00 0.00 753.72 768.01 7.15 0.00 7.15 0.00 169 0.00 0.00 739.66 753.72 7.03 0.00 7.03 0.00 170 0.00 0.00 725.84 739.66 6.91 0.00 6.91 0.00 171 0.00 0.00 712.25 725.84 6.79 0.00 6.79 0.00 I 172 0.00 0.00 698.89 712.25 5.58 0.00 6.68 0.00 173 0.00 0.00 685.75 696.89 6.57 0.00 6.57 0.00 174 0.00 0.00 672.63 685.75 6.46 0.00 6.46 0.00 175 0.00 0.00 860.13 672.83 6.35 0.00 6.35 0.00 176 0.00 0.00 647.64 660.13 6.24 0.00 8.24 0.00 177 0.00 0.00 635.36 647.64 6.14 0.00 6.14 0.00 178 0.00 0.00 623.26 635.36 6.04 0.00 6.04 0.00 179 0.00 0.00 611.41 623.28 5.94 0.00 5.94 0.00 180 0.00 0.00 599.74 611.41 5.84 0.00 5.84 0.00 I 1 EXISTING POND- Routing.xls I d N m �N y _ d 2' U N_ N > e � O N O N N C m 0 L ° o y B a'o I I r ao I I N t a- r 00 0a W T C = N C X d W W (� X 00 y Z �w IL �Q U) N O O O O O O O O O O O O O O O O O O I� O TSI GBJeyassa ` O O O r W. M 0 Cl) d e m C LL B O M d B E / N / U v, \ a / q / 1 \ \ \ O O O O O O O O O O O O O O O O O O I� O TSI GBJeyassa ` O O O r W. M 0 Cl) d m C LL E O M d E 0 N O O O O O ' Storage Routing Analysis University Heights Subdivision Existing Detention Pond ' 25 -Year Storm Event Pond DA Total P ro-Dev Time Inflow 11 +12 2sn-0 2s1[ +O Discharge Discharge Discharge Disehaive I011e� 19fS1 191§1 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 4.78 4.78 4.63 4.78 0.07 4.04 4.11 1.62 2 9.55 14.33 18.37 18.95 0.29 8.08 8.37 3.23 3 14.33 23.88 40.94 4125 0.65 1212 12.77 4.85 4 19.10 33.43 72.08 74.37 1.15 16.16 17.31 8.47 5 23.88 42.98 111.51 115.05 1.77 20.21 21.98 8.09 6 28.65 52.53 159.84 164.03 2.09 24.25 26.34 9.70 7 33.43 62.08 216.76 221.92 2.58 26.29 30.87 11.32 8 36.20 71.63 282.12 288.39 3.14 32.33 35.46 12.94 ' 9 42.98 81.18 355.78 363.30 3.76 35.37 40.13 14.55 10 47.75 90.73 437.59 446.50 4.46 40.41 44.87 16.17 11 52.53 105.05 532.12 542.64 5.26 38.39 43.65 17.79 12 57.30 109.83 629.76 641.95 6.09 36.37 42.46 19.41 13 62.08 114.60 730.47 744.37 6.95 34.35 41.30 21.02 14 66.85 128.93 643.57 859.40 7.91 32.33 4024 22.64 15 71.63 138.48 964.18 982.06 8.94 30.31 39.25 24.26 16 76.40 148.03 1092.16 1112.21 10.03 28.29 38.31 25.87 ' 17 18 81.18 85.95 157.58 167.13 1227.38 1369.74 1249.74 1394.52 11.18 12.39 26.27 24.25 37.44 36.63 27.49 29.11 19 90.73 176.68 1519.16 1648.42 13.63 22.23 35.86 30.73 20 95.50 186.23 1675.55 1705.39 14.92 20.21 35.13 32.34 21 100.28 195.78 1838.79 1871.33 16.27 18.18 34.45 33.96 22 105.05 205.33 2008.79 2044.13 17.67 16.16 33.83 35.58 23 109.83 214.88 2185.43 2223.68 19.12 14.14 33.27 37.19 24 114.60 224.43 2368.59 2409.86 20.63 12.12 32.76 38.81 25 119.38 233.98 2558.18 2602.58 22.20 10.10 32.30 40.43 26 116.99 236.37 2747.04 2794.55 23.75 8.08 31.84 42.04 27 114.60 231.60 2928.15 2978.64 25.25 6.06 31.31 43.66 28 112.22 226.82 3101.62 3154.97 26.68 4.04 30.72 45.28 -- 29 109.83 222.05 3267.57 3323.66 28.05 2.02 30.07 46.90 30 107.44 217.27 3426.14 3484.84 29.35 0.00 29.35 48.51 31 105.05 212.50 3577.45 3638.63 30.59 0.00 30.59 50.13 32 102.67 207.72 3721.83 3785.17 31.77 0.00 31.77 51.75 33 100.28 202.95 3858.43 3924.58 33.08 0.00 - 33.08 53.36 34 97.89 198.17 3987.92 4056.60 34.34 0.00 34.34 54.98 35 95.50 19140 4110.25 4181.31 35.53 0.00 35.53 56.60 36 93.12 188.62 4225.55 4298.87 36.66 0.00 36.66 58.22 37 90.73 183.85 4333.96 4409.39 37.72 0.00 37.72 59.83 38 88.34 179.07 4435.60 4513.03 38.71 0.00 38.71 61.45 39 85.95 174.29 4530.62 4609.90 39.64 0.00 39.64 60.64 40 83.57 169.52 4619.14 4700.14 40.50 0.00 40.50 59.83 41 81.18 164.74 4701.27 4783.88 41.30 0.00 41.30 59.02 ' 42 78.79 159.97 4777.15 4861.24 42.05 0.00 42.05 58.22 43 76.40 155.19 4846.89 4932.34 42.73 0.00 42.73 57.41 44 74.02 150.42 4910.61 4997.31 43.35 0.00 43.35 56.60 45 71.63 145.64 4968.43 5058.26 43.91 0.00 43.91 55.79 1 46 69.24 140.87 5020.46 5109.30 44.42 0.00 44.42 54.98 47 65.85 136.09 5066.80 5156.55 44.87 0.00 44.87 64.17 48 64.47 131.32 5107.58 5198.12 45.27 0.00 45.27 53.36 49 62.08 126.54 5142.89 5234.12 45.62 0.00 45.62 52.56 50 59.69 121.77 5172.84 5264.65 45.91 0.00 45.91 51.75 51 57.30 116.99 5197.53 5289.83 46.15 0.00 46.15 50.94 52 54.91 112.22 5217.06 5309.75 46.34 0.00 46.34 50.13 53 52.53 107.44 5231.64 5324.51 46.48 0.00 46.48 49.32 54 55 50.14 47.75 102.67 97.89 5241.06 5245.71 5334.21 5338.95 46.58 46.62 0.00 0.00 46.58 46.62 48.51 4730 56 45.36 93.12 5245.59 5338.83 46.62 0.00 46.62 46.90 57 42.98 88.34 5240.78 5333.93 46.57 0.00 46.57 46.09 58 40.59 83.57 5231.39 5324.35 46.48 0.00 46.48 45.28 59 38.20 78.79 5217.49 5310.18 46.34 0.00 46.34 44.47 60 35.81 74.02 5199.17 5291.50 46.17 0.00 46.17 43.66 61 33.43 69.24 5176.52 5268.41 45.94 0.00 45.94 42.85 62 31.04 64.47 5149.62 5240.99 45.68 0.00 45.68 42.04 EXISTING POND- ROUSng.xls Storage Routing Analysis University Heights Subdivision Existing Detention Pond 25-Year Storm Event Pon DA 201 Total Pre-Dev Time Inflow +1 2attA 2300 h e Discharge lac a Discharge infloi LPG IE}§l 63 28.65 59.89 5118.56 5209.31 45.38 0.00 45.38 41.24 64 26.26 54.91 5083.40 5173.47 45.04 0.00 45.04 40.43 65 23.88 50.14 5044.23 5133.54 44.65 0.00 44.65 39.62 66 21.49 45.36 5001.13 5089.60 44.23 0.00 44.23 38.81 67 19.10 40.59 4954.17 5041.72 43.77 0.00 43.77 38.00 68 16.71 35.81 4903.43 4989.99 43.28 0.00 43.28 37.19 69 14.33 31.04 4848.98 4934.47 42.75 0.00 42.75 36.38 70 11.94 26.26 4790.88 4875.24 42.18 0.00 42.18 35.58 71 9.55 21.49 4729.21 4812.37 41.58 0.00 41.58 34.77 72 7.16 16.71 4664.04 4745.93 40.94 0.00 40.94 3196 73 4.78 11.94 4595.44 4675.98 40.27 0.00 40.27 33.15 74 2.39 7.16 4523.47 4602.60 39.57 0.00 39.57 32.34 75 0.00 2.39 4448.19 4525.85 38.83 0.00 38.83 31.53 76 0.00 0.00 4372.01 4448.19 38.09 0.00 38.09 30.73 77 0.00 0.00 4297.29 4372.01 37.36 0.00 37.36 29.92 78 0.00 0.00 4224.00 4297.29 36.64 0.00 36.64 29.11 79 0.00 0.00 4152.11 4224.00 35.94 0.00 35.94 28.30 1 80 81 0.00 0.00 0.00 0.00 4081.60 4012.45 4152.11 4081.60 35.25 34.58 0.00 0.00 35.25 34.58 27.49 26.68 82 0.00 0.00 3944.61 4012.45 33.92 0.00 33.92 25.87 83 0.00 0.00 3878.08 3944.61 33.27 0.00 33.27 25.07 84 0.00 0.00 3812.82 3878.08 32.63 0.00 32.63 24.26 85 0.00 0.00 3748.81 3812.82 32.00 0.00 32.00 23.45 88 0.00 0.00 3685.85 3748.81 31.48 0.00 31.48 22.64 87 0.00 0.00 3623.91 3685.85 30.97 0.00 30.97 21.83 88 0.00 0.00 3562.96 3623.91 30.47 0.00 30.47 21.02 89 0.00 0.00 3503.00 3562.96 29.98 0.00 29.98 20.21 90 0.00 0.00 3444.00 3503.00 29.50 0.00 29.50 19.41 91 0.00 0.00 3385.96 3444.00 29.02 0.00 29.02 18.60 92 0.00 0.00 3328.85 3385.96 28.55 0.00 28.55 17.79 93 0.00 0.00 3272.68 3328.85 28.09 0.00 28.09 18.98 94 0.00 0.00 3217.42 3272.68 27.63 0.00 27.63 16.17 1 95 0.00 0.00 3163.05 3217.42 27.18 0.00 27.18 15.36 96 0.00 0.00 3109.56 3163.05 26.74 0.00 26.74 14.55 97 0.00 0.00 3056.94 3109.55 26.31 0.00 26.31 13.75 98 0.00 0.00 3005.18 3056.94 25.88 0.00 25.88 12.94 99 0.00 0.00 2954.26 3005.18 25.46 0.00 25.46 12.13 100 0.00 0.00 2904.16 2954.26 25.05 0.00 25.05 11.32 101 0.00 0.00 2854.87 2904.16 24.64 0.00 24.64 10.51 102 0.00 0.00 2806.38 2854.87 24.24 0.00 24.24 9.70 103 104 0.00 0.00 0.00 0.00 2758.68 2711.76 2806.38 2758.68 23.85 23.46 0.00 0.00 23.85 23.46 8.89 8.09 105 0.00 0.00 2665.59 2711.76 23.08 0.00 23.08 7.28 108 0.00 0.00 2620.17 2665.59 22.71 0.00 22.71 6.47 107 0.00 0.00 2575.49 2620.17 22.34 0.00 22.34 5.68 108 0.00 0.00 2531.54 2575.49 21.98 0.00 21.98 4.85 1 109 0.00 0.00 2488.29 2531.54 21.62 0.00 21.62 4.04 110 0.00 0.00 2445.75 2488.29 21.27 0.00 21.27 3.23 111 0.00 0.00 2403.90 2445.75 20.93 0.00 20.93 2.43 112 0.00 0.00 2362.73 2403.90 20.59 0.00 20.59 1.62 113 0.00 0.00 232222 2362.73 20.25 0.00 20.25 0.81 114 0.00 0.00 2282.38 2322.22 19.92 0.00 19.92 0.00 115 0.00 0.00 2243.18 2282.38 19.60 0.00 19.60 0.00 116 0.00 0.00 2204.61 2243.18 19.28 0.00 19.28 0.00 117 118 0.00 0.00 0.00 0.00 2166.67 2129.35 2204.61 2168.67 18.97 18.66 0.00 0.00 18.97 18.66 0.00 0.00 119 0.00 0.00 2092.63 2129.35 18.36 0.00 18.36 0.00 120 0.00 0.00 2056.50 2092.63 18.08 0.00 18.06 0.00 121 0.00 0.00 2020.96 2058.50 17.77 0.00 17.77 0.00 122 0.00 0.00 1986.00 2020.96 17.48 0.00 17.48 0.00 123 0.00 0.00 1951.61 1986.00 17.20 0.00 17.20 0.00 124 0.00 0.00 1917.77 1951.61 16.92 0.00 16.92 0.00 125 0.00 0.00 1884.48 1917.77 16.64 0.00 16.64 0.00 • EXISTING POND- Routing.xls I EXISTING POND -Rou ing.xls Storage Routing Analysis University Heights Subdivision Existing Detention Pond 25 -Year Storm Event Pond DA 201 Total PrePreDev Time Inflow 11 +12 2%R-0 2sd +O Disch Discharge oischaroe Discharge (min.l IM LOW 126 0.00 0.00 1651.74 1884.48 16.37 0.00 16.37 0.00 127 0.00 0.00 1819.52 1851.74 16.11 0.00 16.11 0.00 128 0.00 0.00 1787.83 1819.52 15.85 0.00 15.85 0.00 129 130 0.00 0.00 0.00 0.00 1756.65 1725.97 1787.83 1758.65 15.59 15.34 0.00 0.00 15.59 15.34 0.00 0.00 131 0.00 0.00 1695.80 1725.97 15.09 0.00 15.09 0.00 132 0.00 0.00 1666.11 1695.80 14.84 0.00 14.84 0.00 133 0.00 0.00 1636.90 1666.11 14.60 0.00 14.60 0.00 134 0.00 0.00 1608.17 1636.90 14.37 0.00 14.37 0.00 ' 135 0.00 0.00 1579.90 1608.17 14.13 0.00 14.13 0.00 136 0.00 0.00 1552.10 1579.90 13.90 0.00 13.90 0.00 137 0.00 0.00 1524.74 1552.10 13.68 0.00 13.68 0.00 138 0.00 0.00 1497.83 1524.74 13.46 0.00 13.46 0.00 139 0.00 0.00 1471.35 1497.83 13.24 0.00 13.24 0.00 ' 140 0.00 0.00 1445.30 1471.35 13.02 0.00 13.02 0.00 141 0.00 0.00 1419.68 1445.30 12.81 0.00 12.81 0.00 142 0.00 0.00 1394.48 1419.68 12.60 0.00 12.60 0.00 143 0.00 0.00 1369.70 1394.48 12.39 0.00 12.39 0.00 144 0.00 0.00 1345.34 1369.70 12.18 0.00 12.18 0.00 145 0.00 0.00 1321.39 1345.34 11.98 0.00 11.98 0.00 146 0.00 0.00 1297.83 1321.39 11.78 0.00 11.78 0.00 147 0.00 0.00 1274.67 1297.83 11.58 0.00 11.58 0.00 148 0.00 0.00 1251.90 1274.67 11.39 0.00 11.39 0.00 149 0.00 0.00 1229.51 1251.90 11.20 0.00 11.20 0.00 150 0.00 0.00 1207.49 1229.51 11.01 0.00 11.01 0.00 151 0.00 0.00 1185.85 1207.49 10.82 0.00 10.82 0.00 152 0.00 0.00 1164.56 1185.65 10.64 0.00 10.64 0.00 153 0.00 0.00 1143.63 1164.55 10.46 0.00 10.46 0.00 ' 154 0.00 0.00 1123.05 1143.63 10.29 0.00 10.29 0.00 155 0.00 0.00 1102.82 1123.05 10.12 0.00 10.12 0.00 156 0.00 0.00 1082.92 1102.82 9.95 0.00 9.95 0.00 157 0.00 0.00 1063.35 1082.92 9.78 0.00 9.78 0.00 ' 158 0.00 0.00 1044.12 1063.35 9.62 0.00 9.62 0.00 159 0.00 0.00 1025.20 1044.12 9.46 0.00 9.46 0.00 160 0.00 0.00 1006.61 1025.20 9.30 0.00 9.30 0.00 161 0.00 0.00 988.32 1005.61 9.14 0.00 9.14 0.00 162 0.00 0.00 970.34 988.32 8.99 0.00 8.99 0.00 183 0.00 0.00 952.66 970.34 8.84 0.00 8.84 0.00 164 0.00 0.00 935.27 952.66 8.69 0.00 8.69 0.00 165 0.00 0.00 918.18 935.27 8.55 0.00 8.55 0.00 166 167 0.00 0.00 0.00 0.00 901.37 884.85 918.16 901.37 8.40 8.26 0.00 0.00 8.40 8.26 0.00 0.00 168 0.00 0.00 868.60 884.85 8.12 0.00 8.12 0.00 169 0.00 0.00 852.62 868.60 7.99 0.00 7.99 0.00 170 0.00 0.00 836.91 852.62 7.86 0.00 7.86 0.00 171 0.00 0.00 821.46 836.91 7.72 0.00 7.72 0.00 ' 172 0.00 0.00 806.27 821.46 7.59 0.00 7.59 0.00 173 0.00 0.00 791.34 806.27 7.47 0.00 7.47 0.00 174 0.00 0.00 776.65 791.34 7.34 0.00 7.34 0.00 175 0.00 0.00 762.21 776.65 7.22 0.00 7.22 0.00 176 0.00 0.00 748.01 76221 7.10 0.00 7.10 0.00 177 0.00 0.00 734.05 748.01 6.98 0.00 8.96 0.00 178 0.00 0.00 720.33 734.05 6.86 0.00 6.86 0.00 179 0.00 0.00 708.83 720.33 6.75 0.00 6.75 0.00 I 180 0.00 0.00 693.56 706.83 6.64 0.00 6.64 0.00 I EXISTING POND -Rou ing.xls v d v H v u N v ] p C3 p 10 0 N R a N N q N N ii o 'o E 'o IL / a` N I E / 0 I 1 N L CL 1 0 m c 0 0 0 I 0) T C S y .. yW W (9 EX 00 yZ `m IL �Q 0 N C0 C0 ° 0 C0 ° o 0 0 0 0 0 0 0 0 m r co (SIO) 16eeyosl4 N W. 0 UD 0 e v v / m 9 rn / S ii E o / M N E / 0 N / e / / \ \ s \ \ \ a a i \ \♦ �. a � \ i i e a \ \ \ C0 C0 ° 0 C0 ° o 0 0 0 0 0 0 0 0 m r co (SIO) 16eeyosl4 N W. 0 UD 0 v v m 9 rn S ii E o M N E 0 N 0 0 0 0 0 ' Storage Routing Analysis University Heights Subdivision Existing Detention Pond ' 50 -Year Storm Event Pond DA 201 Total Pre -Dev Time Info 11+12 2stt-0 2s/t+O Discharge Discharg a Discharge Discharge iminj Lcfil WS) 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 5.43 5.43 5.26 5.43 0.08 4.57 4.65 1.84 2 10.85 16.28 20.88 21.54 0.33 9.14 9.47 3.69 3 16.28 27.13 46.53 48.01 0.74 13.70 14.44 5.53 4 21.71 37.99 81.91 84.52 1.30 18.27 19.57 7.37 ' 5 27.13 48.84 126.72 130.75 2.02 22.84 24.86 9.22 6 32.56 59.69 181.85 186.42 2.28 27.41 29.69 11.06 7 37.99 70.55 246.73 252.40 2.83 31.98 34.81 12.90 8 43.41 81.40 321.20 328.13 3.47 36.54 40.01 14.75 9 48.84 92.26 405.09 413.46 4.18 41.11 45.29 16.59 ' 10 54.27 103.11 498.25 50820 4.97 45.68 50.65 18.43 11 59.69 119.39 605.86 617.64 5.89 43.40 49.29 2018 12 65.12 124.82 717.01 730.68 6.84 41.11 47.95 22.12 13 70.55 130.24 831.63 847.25 7.81 38.83 46.64 23.96 14 75.98 146.52 960.35 978.16 8.91 36.54 45.45 25.81 15 81.40 157.38 1097.58 1117.72 10.07 34.26 44.33 27.65 16 86.83 168.23 1243.18 1265.81 11.31 31.98 43.29 29.49 17 92.26 179.08 1397.03 1422.27 12.62 29.69 42.31 31.34 18 97.68 189.94 1559.04 1586.96 1196 27.41 41.37 33.18 ' 19 103.11 200.79 1729.11 1759.83 15.36 25.12 40.49 35.03 20 108.54 211.65 1907.09 1940.75 16.83 22.84 39.67 36.87 21 113.96 222.50 2092.87 2129.59 18.36 20.56 38.92 38.71 22 23 119.39 124.82 233.35 244.21 2286.31 2487.29 2326.22 2530.51 19.96 21.61 18.27 15.99 38.23 37.60 40.56 42.40 24 130.24 255.06 2695.69 2742.35 23.33 13.70 37.03 44.24 25 135.67 265.91 2911.38 2961.60 25.11 11.42 36.53 46 +09 26 132.96 268.63 3126.25 3180.01 26.88 9.14 36.02 47.93 27 130.24 263.20 3332.29 3389.45 28.58 6.85 35.43 49.77 ' 28 127.53 257.77 3529.66 3590.06 30.20 4.57 34.77 51.62 29 124.82 252.35 3718.52 3782.01 31.75 2.28 34.03 53.46 30 122.10 246.92 3898.50 3965.44 33.47 0.00 33.47 55.30 31 32 119.39 116.68 241.49 236.07 4069.72 4232.33 4140.00 4305.78 35.14 36.73 0.00 0.00 35.14 36.73 57.15 58.99 33 113.96 230.64 4386.51 4462.97 38.23 0.00 38.23 60.83 34 111.25 225.21 4532.41 4611.72 39.66 0.00 39.66 62.68 35 108.54 219.79 4670.19 4752.19 41.00 0.00 41.00 64.52 36 105.82 214.36 4800.01 4884.55 42.27 0.00 42.27 66.36 ' 37 103.11 208.93 4922.03 5008.95 43.46 0.00 43.46 68.21 38 100.40 203.51 5036.38 5125.53 44.58 0.00 44.58 70_05 39 97.68 198.08 5143.22 5234.46 45.62 0.00 45.62 69.13 40 94.97 192.65 5242.69 5335.87 46.59 0.00 46.59 68.21 41 92.26 187.22 5334.93 5429.91 47.49 0.00 47.49 67.28 ' 42 89.54 181.80 5420.08 5516.72 48.32 0.00 48.32 66.36 43 86.83 176.37 5498.28 5596.45 49.09 0.00 49.09 65.44 44 84.12 170.94 5569.65 5669.22 49.78 0.00 49.78 64.52 45 81.40 165.52 5634.34 5735.17 50.42 0.00 50.42 63.60 ' 46 78.89 160.09 5692.47 5794.43 50.98 0.00 50.98 62.68 47 75.98 154.66 5744.16 5847.13 51.49 0.00 51.49 61.75 48 73.26 149.24 5789.53 5893.39 51.93 0.00 51.93 60.83 49 70.55 143.81 5828.72 5933.34 52.31 0.00 52.31 59.91 50 67.84 138.38 5861.83 5967.10 52.64 0.00 52.64 58.99 51 65.12 132.96 5888.98 5994.78 52.90 0.00 52.90 58.07 52 62.41 127.53 5910.29 6016.51 53.11 0.00 53.11 57.15 53 59.69 122.10 5925.87 6032.40 53.26 0.00 53.26 56.22 54 56.98 116.68 5935.83 6042.55 53.36 0.00 53.36 55.30 55 54.27 111.25 5940.28 6047.08 53_40 0.00 53_40 54.38 56 51.55 105.82 5939.31 6046.10 53.39 0.00 53.39 53.46 57 48.84 100.40 5933.05 6039.71 53.33 0.00 53.33 52.54 58 46.13 94.97 5921.58 6028.02 53.22 0.00 53.22 51.62 59 43.41 89.54 5905.00 6011.12 53.06 0.00 53.06 50.69 60 40.70 84.12 5883.42 5989.12 52.85 0.00 52.85 49.77 61 37.99 78.69 5856.94 5962.11 52.59 0.00 52.59 48.85 62 35.27 73.26 5825.63 5930.20 52.28 0.00 52.28 47.93 EXISTING POND- Routing.xls 1 ' Storage Routing Analysis University Heights Subdivision Existing Detention Pond ' 50 -Year Storm Event T ime Inflow 11+12 Pod DA 201 Total Pr Dev (min 1 LEW 1cfs) 2sk-0 29A +0 Discha Discharge Discharge Discharg e 63 32.56 67.84 5789.61 5893.47 51.93 0.00 51.93 47.01 64 29.85 62.41 5748.95 5852.01 51.53 0.00 51.53 46.09 65 27.13 56.98 5703.74 5805.93 51.09 0.00 51.09 45.16 66 24.42 51.55 5654.08 5755.30 50.61 0.00 50.61 44.24 67 21.71 46.13 5600.05 5700.21 $0.08 0.00 50.08 43.32 68 18.99 40.70 5541.73, 5640.75 49.51 0.00 49.51 42.40 69 16.28 35.27 5479.20 5577.00 48.90 0.00 48.90 41.48 70 13.57 29.85 5412.55 5509.05 48.25 0.00 48.25 40.56 71 10.85 24.42 5341.85 6436.97 47.56 0.00 47.56 39.63 72 8.14 18.99 5267.19 5360.85 46.83 0.00 46.83 38.71 ' 73 5.43 13.57 5188.63 5280.75 46.06 0.00 46.06 37.79 74 2.71 8.14 5106.25 5196.77 45.26 0.00 45.26 36.87 75 0.00 2.71 5020.13 5108.96 44.42 0.00 44.42 35.95 ' 76 77 0.00 0.00 0.00 0.00 4932.99 4847.53 5020.13 4932.99 43.57 42.73 0.00 0.00 43.57 42.73 35.02 34.10 78 0.00 0.00 4763.70 4847.53 41.91 0.00 41.91 33.18 79 0.00 0.00 4681.48 4763.70 41.11 0.00 41.11 32.26 80 0.00 0.00 4600.83 4681.48 40.32 0.00 40.32 31.34 81 0.00 0.00 4521.73 4600.83 39.55 0.00 39.55 30.42 1 82 0.00 0.00 4444.14 4521.73 38.79 0.00 38.79 29.49 83 0.00 0.00 4368.04 4444.14 38.05 0.00 38.05 28.57 84 0.00 0.00 4293.39 4368.04 37.32 0.00 37.32 27.65 85 0.00 0.00 4220.18 4293.39 36.61 0.00 36.61 26.73 86 0.00 0.00 4148.36 4220.18 35.91 0.00 35.91 25.81 87 0.00 0.00 4077.93 4148.36 35.22 0.00 35.22 24.89 88 0.00 0.00 4008.84 4077.93 34.54 0.00 34.54 23.96 89 0.00 0.00 3941.08 4008.84 33.88 0.00 33.88 23.04 90 0.00 0.00 3874.61 3941.08 33.23 0.00 33.23 22.12 ' 91 0.00 0.00 3809.42 3874.61 32.60 0.00 32.60 21.20 92 0.00 0.00 3745.47 3809.42 31.97 0.00 31.97 20.28 93 0.00 0.00 3682.57 3745.47 31.45 0.00 31.45 19.36 94 0.00 0.00 3620.68 368157 30.95 0.00 30.95 18.43 ' 95 0.00 0.00 3559.78 3620.68 30.45 0.00 30.45 17.51 96 0.00 0.00 3499.87 3559.78 29.96 0.00 29.96 16.59 97 0.00 0.00 3440.92 3499.87 29.47 0.00 29.47 15.67 98 0.00 0.00 3382.93 3440.92 29.00 0.00 29.00 14.75 99 0.00 0.00 3325.88 3382.93 28.53 0.00 28.53 13.83 ' 100 0.00 0.00 3269.75 3325.88 28.06 0.00 28.08 12.90 101 0.00 0.00 3214.53 3269.75 27.61 0.00 27.61 11.98 102 0.00 0.00 3160.21 3214.53 27.16 0.00 27.16 11.06 103 0.00 0.00 3106.77 3160.21 26.72 0.00 26.72 10.14 104 0.00 0.00 3054.20 3106.77 26.29 0.00 26.29 9.22 105 0.00 0.00 3002.48 3054.20 25.86 0.00 25.86 8.30 106 0.00 0.00 2951.60 3002.48 25.44 0.00 25.44 7.37 107 0.00 0.00 2901.54 2951.60 25.03 0.00 25.03 6.45 108 109 0.00 0.00 0.00 0.00 2852.30 2803.85 2901.54 2852.30 24.62 24.22 0.00 0.00 24.62 24.22 5.53 4.61 110 0.00 0.00 2756.19 2803.85 23.83 0.00 23.83 3.69 111 0.00 0.00 2709.31 2756.19 23.44 0.00 23.44 2.77 112 0.00 0.00 2663.18 2709.31 23.06 0.00 23.06 1.84 113 0.00 0.00 2617.80 2663.18 2169 0.00 22.69 0.92 114 0.00 0.00 2573.16 2617.80 22.32 0.00 22.32 0.00 115 0.00 0.00 2529.24 2573.16 21.96 0.00 21.96 0.00 116 0.00 0.00 2486.04 2529.24 21.60 0.00 21.60 0.00 117 118 0.00 0.00 0.00 0.00 2443.53 2401.72 2486.04 2443.53 21.25 20.91 0.00 0.00 21.25 20.91 0.00 0.00 119 0.00 0.00 2360.58 2401.72 20.57 0.00 20.57 0.00 120 0.00 0.00 2320.11 2360.58 20.23 0.00 20.23 0.00 121 0.00 0.00 2280.30 2320.11 19.91 0.00 19.91 0.00 122 0.00 0.00 2241.13 2280.30 19.58 0.00 19.58 0.00 ' 123 0.00 0.00 2202.60 2241.13 19.27 0.00 19.27 0.00 124 0.00 0.00 2164.69 2202.60 18.95 0.00 18.95 0.00 125 0.00 0.00 2127.40 2164.69 18.65 0.00 18.65 0.00 EXISTING POND- RouSng.xls n L ' Storage Routing Analysis University Heights Subdivision Existing Detention Pond ' 50 -Year Storm Event and DA 201 Total Pre -Dev Time Inflow 11+12 . 2SR-0 2s / +O Discharge Discharge Discharge Discharge ( mm. 1 (Sw (cfs) 126 0.00 0.00 2090.71 2127.40 18.34 0.00 18.34 0.00 127 0.00 0.00 2054.62 2090.71 18.05 0.00 18.05 0.00 128 0.00 0.00 2019.11 2054.62 17.75 0.00 17.75 0.00 129 0.00 0.00 1984.18 2019.11 17.47 0.00 17.47 0.00 130 0.00 0.00 1949.81 1984.18 17.18 0.00 17.18 0.00 ' 131 0.00 0.00 1916.01 1949.81 16.90 0.00 16.90 0.00 132 0.00 0.00 1882.75 1916.01 16.63 0.00 16.63 0.00 133 0.00 0.00 1850.03 1882.75 16.36 0.00 16.36 0.00 134 0.00 0.00 1817.84 1850.03 16.09 0.00 16.09 0.00 135 0.00 0.00 1786.17 1817.84 15.83 0.00 15.83 0.00 ' 136 0.00 0.00 1755.02 1786.17 15.58 0.00 15.58 0.00 137 0.00 0.00 1724.37 1755.02 15.32 0.00 15.32 0.00 138 0.00 0.00 1694.22 1724.37 15.08 0.00 15.08 0.00 ' 139 140 0.00 0.00 0.00 0.00 1664.56 1635.38 1694.22 1664.56 14.83 14.59 0.00 0.00 14.83 14.59 0.00 0.00 141 0.00 0.00 1606.67 1635.38 14.35 0.00 14.35 0.00 142 0.00 0.00 1578.43 1606.67 14.12 0.00 14.12 0.00 143 0.00 0.00 1550.65 1578.43 13.89 0.00 13.89 0.00 144 0.00 0.00 1523.31 1550.65 13.67 0.00 13.67 0.00 ' 145 0.00 0.00 1496.42 1523.31 13.44 0.00 13.44 0.00 146 0.00 0.00 1469.97 1496.42 13.23 0.00 13.23 0.00 147 0.00 0.00 1443.95 1469.97 13.01 0.00 13.01 0.00 ' 148 149 0.00 0.00 0.00 0.00 1418.34 1393.17 1443.95 1418.34 12.80 12.59 0.00 0.00 12.80 12.59 0.00 0.00 150 0.00 0.00 1368.41 1393.17 12.38 0.00 12.38 0.00 151 0.00 0.00 1344.07 1368.41 12.17 0.00 12.17 0.00 152 0.00 0.00 1320.14 1344.07 11.97 0.00 11.97 0.00 153 0.00 0.00 1296.61 1320.14 11.77 0.00 11.77 0.00 154 0.00 0.00 1273.47 1296.61 11.57 0.00 11.57 0.00 155 0.00 0.00 1250.71 1273.47 11.38 0.00 11.38 0.00 156 0.00 0.00 1228.34 1250.71 11.19 0.00 11.19 0.00 157 0.00 0.00 1206.35 1228.34 11.00 0.00 11.00 0.00 158 0.00 0.00 1184.72 1206.35 10.81 0.00 10.81 0.00 ' 159 0.00 0.00 1163.45 1184.72 10.63 0.00 10.63 0.00 160 0.00 0.00 1142.54 1163.45 10.46 0.00 10.46 0.00 161 0.00 0.00 1121.98 1142.54 10.28 0.00 10.28 0.00 162 0.00 0.00 1101.76 1121.98 10.11 0.00 10.11 0.00 163 0.00 0.00 1081.88 1101.76 9.94 0.00 9.94 0.00 164 0.00 0.00 1062.33 1081.88 9.77 0.00 9.77 0.00 165 0.00 0.00 1043.12 1062.33 9.61 0.00 9.61 0.00 166 0.00 0.00 1024.22 1043.12 9.45 0.00 9.45 0.00 167 0.00 0.00 1005.64 1024.22 9.29 0.00 9.29 0.00 168 0.00 0.00 987.36 1005.64 9.14 0.00 9.14 0.00 169 0.00 0.00 969.40 987.36 8.98 0.00 8.98 0.00 170 0.00 0.00 951.74 969.40 813 0.00 8.83 0.00 171 0.00 0.00 934.37 951.74 8.68 0.00 8.68 0.00 ' 172 0.00 0.00 917.29 934.37 8.54 0.00 8.54 0.00 173 0.00 0.00 900.50 917.29 8.40 0.00 8.40 0.00 174 0.00 0.00 883.98 900.50 8.26 0.00 8.26 0.00 175 0.00 0.00 867.75 883.98 8.12 0.00 8.12 0.00 176 0.00 0.00 851.78 867.75 7.98 0.00 7.98 0.00 177 0.00 0.00 836.09 851.78 7.85 0.00 7.85 0.00 178 0.00 0.00 820.65 836.09 7.72 0.00 7.72 0.00 179 0.00 0.00 805.48 820.65 7.59 0.00 7.59 0.00 ' 180 0.00 0.00 790.56 805.48 7.46 0.00 7.46 0.00 i EXISTING POND- Routing.xls a) Ir a) 2 7 w t t N d U N L L 'o N V (o O U O (L o o Q/ (L o I � I N CI d t C 2 CL L V 0) � C C N . �W W ' K r � U) Z . W ma } a o 0 r ° o ° o ° 0 0 0 co Or O N M N 0 0 0 r 0 O / 7 N / d rn / C IL O / M Q/ E F- O N / / I I / co N m / nl / ♦ \ \ a ♦ /. ♦ a /. ♦ a ♦ / ♦ \ / \♦ i' a a ♦ ♦ ° o ° o ° 0 0 0 co Or O N M N 0 0 0 r 0 O 7 N d rn C IL O M Q/ E F- O N 0 (s;o) 06je4osla r Storage Routing Analysis University Heights Subdivision Existing Detention Pond 100 -Year Storm Event Pond DA 205 Total Pre-Dev Ti me Inflow 1 +12 2sh-0 2stt+O Discharge Dischame Discharge Discharge 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 5.67 5.67 5.49 5.67 0.09 4.57 4.66 1.93 2 11.33 17.00 21.79 22.49 0.35 9.14 9.48 3.86 3 17.00 28.33 48.58 50.12 0.77 13.70 14.48 5.78 4 22.66 39.66 85.52 88.24 1.36 18.27 19.63 7.71 ' 5 28.33 50.99 132.30 136.51 2.10 22.84 24.94 9.64 6 33.99 62.32 189.92 194.62 2.35 27.41 29.76 11.57 7 39.66 73.65 257.72 263.57 2.93 31.98 34.90 13.50 ' 8 9 45.32 50.99 84.98 96.32 335.52 423.17 342.70 431.84 3.59 4.34 36.54 41.11 40.13 45.45 15.42 17.35 10 56.66 107.65 520.49 530.81 6.16 45.68 50.84 19.28 11 62.32 124.64 632.89 645.13 6.12 43.40 49.52 21.21 12 67.99 130.31 748.98 783.20 7.11 41.11 48.22 23.13 13 73.65 135.97 868.71 884.96 8.13 38.83 46.95 25.06 14 79.32 152.97 1003.14 1021.68 9.27 36.54 45.81 26.99 15 84.98 164.30 1146.46 1167.44 10.49 34.26 44.75 28.92 16 90.65 175.63 1298.53 1322.10 11.78 31.98 43.76 30.85 17 18 96.32 101.98 186.96 198.30 1459.22 1628.45 1485.50 1657.52 13.14 14.53 29.69 27.41 42.83 41.94 32.77 34.70 19 107.65 209.63 1806.08 1838.08 16.00 25.12 41.12 36.63 20 113.31 220.96 1991.98 2027.04 17.53 22.84 40.37 38.56 21 118.98 232.29 2186.01 2224.27 19.13 20.56 39.69 40.49 22 124.64 243.62 2388.04 2429.63 20.79 18.27 39.07 42.41 ' 23 130.31 254.95 2597.94 2642.99 22.53 15.99 38.51 44.34 24 135.97 266.28 2815.59 2864.23 24.32 1170 38.02 46.27 25 141.64 277.61 3040.85 3093.20 26.18 11.42 37.60 48.20 26 138.81 280.45 3265.24 3321.30 28.03 9.14 37.16 50.13 27 135.97 274.78 3480.43 3540.03 29.80 8.85 36.65 52.05 28 133.14 269.12 3686.58 3749.55 31.48 4.57 36.05 53.98 29 130.31 263.45 3883.39 3950.03 33.32 2.28 35.60 55.91 30 127.48 257.78 4070.88 4141.18 35.15 0.00 35.15 57.84 31 124.64 252.12 4249.21 4323.00 36.89 0.00 36.89 59.76 ' 32 121.81 246.45 4418.58 4495.67 38.54 0.00 38.54 61.69 33 118.98 240.79 4579.14 4659.37 40.11 0.00 + 40.11 63.62 34 116.14 235.12 4731.07 4814.26 41.60 0.00 41.60 65.55 35 113.31 229.46 4874.54 4960.53 43.00 0.00 43.00 67.48 36 110.48 223.79 5009.70 5098.33 44.32 0.00 44.32 69.40 ' 37 107.65 218.13 5136.71 5227.82 45.56 0.00 45.56 71.33 38 104.81 212.46 5255.73 5349.17 46.72 0.00 46.72 73.26 39 101.98 206.79 5366.92 5462.53 47.80 0.00 47.80 72.30 40 99.15 201.13 5470.42 5568.05 48.81 0.00 48.81 71.33 41 96.32 195.46 5566.38 5665.88 49.75 0.00 49.75 70.37 42 93.48 189.80 5654.94 5756.18 50.62 0.00 50.62 69.40 43 90.65 184.13 5736.26 5839.08 51.41 0.00 51.41 68.44 44 87.82 178.47 5810.45 5914.72 52.13 0.00 52.13 67.48 45 84.98 172.80 5877.67 5983.25 52.79 0.00 52.79 66.51 ' 46 82.15 167.14 5938.05 6044.81 53.38 0.00 53.38 65.55 47 79.32 161.47 5991.71 6099.52 53.90 0.00 53.90 64.58 48 76.49 155.80 6038.78 6147.51 54.36 0.00 54.36 63.62 ' 49 50 73.65 70.82 150.14 144.47 6079.39 6113.60 6188.92 6223.86 54.77 55.13 0.00 0.00 54.77 55.13 62.66 61.69 51 67.99 138.81 6141.55 6252.41 55.43 0.00 55.43 60.73 52 65.15 133.14 6163.37 6274.69 56.66 0.00 55.66 59.76 53 62.32 127.48 6179.18 6290.84 55.83 0.00 55.83 58.80 54 59.49 121.81 6189.12 6300.99 55.94 0.00 55.94 57.84 ' 55 56.66 116.14 6193.30 6305.26 55.98 0.00 55.98 56.87 56 53.82 110.48 6191.85 6303.78 55.97 0.00 55.97 55.91 57 50.99 104.81 6184.88 6296.66 55.89 0.00 55.89 54.95 ' 58 59 48.16 45.32 99.15 93.48 6172.50 6154.84 6284.02 6265.99 55.76 55.57 0.00 0.00 55.76 55.57 53.98 53.02 60 42.49 87.82 6132.11 6242.66 55.28 0.00 55.28 52.05 61 39.66 82.15 6104.26 6214.26 55.00 0.00 55.00 51.09 62 36.83 76.49 6071.38 6180.74 64.68 0.00 54.68 50.13 EXISTING POND- RouBng.xls I Storage Routing Analysis University Heights Subdivision ' Existing Detention Pond 100 -Year Storm Event Pond DA 205 Total Pre-Dev Time In w tl +12 9/t 2s /t +0 Discharge Discharge Discharge Discharn e ' 63 33.99 70.82 603157 6142.20 54.31 0.00 54.31 49.16 64 31.16 65.15 5990.93 6098.73 53.90 0.00 53.90 48.20 65 28.33 59.49 5943.55 6050.42 53.43 0.00 53.43 47.23 66 25.50 53.82 5891.52 5997.38 52.93 0.00 52.93 46.27 ' 67 22.66 48.16 5834.93 5939.68 52.37 0.00 52.37 45.31 68 19.83 42.49 577187 5877.43 51.78 0.00 51.78 44.34 69 17.00 36.83 5708.42 5810.70 51.14 0.00 51.14 43.38 70 14.16 31.16 5638.67 5739.58 50.46 0.00 50.46 42.41 71 11.33 25.50 5564.69 5664.16 49.73 0.00 49.73 41.45 72 8.50 19.83 5486.58 5584.52 48.97 0.00 48.97 40.49 73 5.67 14.16 5404.40 5500.74 48.17 0.00 48.17 39.52 74 2.83 8.50 5318.24 5412.90 47.33 0.00 47.33 38.56 75 0.00 2.83 5228.18 5321.08 46.45 0.00 46.45 37.59 76 0.00 0.00 5137.06 5228.18 45.56 0.00 45.56 36.63 77 0.00 0.00 5047.68 5137.06 44.69 0.00 44.69 35.67 78 0.00 0.00 4960.02 5047.68 43.83 0.00 43.83 34.70 79 0.00 0.00 4874.04 4960.02 42.99 0.00 42.99 33.74 80 0.00 0.00 4789.70 4874.04 42.17 0.00 42.17 32.77 ' 81 0.00 0.00 4706.98 4789.70 41.36 0.00 41.36 31.81 82 0.00 0.00 4625.85 4706.98 40.57 0.00 40.57 30.85 83 0.00 0.00 4546.26 4625.85 39.79 0.00 39.79 29.88 84 0.00 0.00 446810 4546.26 39.03 0.00 39.03 28.92 85 0.00 0.00 4391.64 4468.20 38.28 0.00 38.28 27.95 ' 86 0.00 0.00 4316.55 4391.64 37.55 0.00 37.55 26.99 87 0.00 0.00 4242.89 4316.55 36.83 0.00 36.83 26.03 88 0.00 0.00 4170.64 424189 36.12 0.00 36.12 25.06 89 90 0.00 0.00 0.00 0.00 4099.78 4030.27 4170.64 4099.78 35.43 34.75 0.00 0.00 35.43 34.75 24.10 23.13 91 0.00 0.00 3962.10 4030.27 34.09 0.00 34.09 22.17 92 0.00 0.00 3895.23 3962.10 33.43 0.00 33.43 21.21 93 0.00 0.00 3829.92 389513 32.66 0.00 32.66 20.24 94 0.00 0.00 3765.65 3829.92 32.13 0.00 32.13 19.28 95 0.00 0.00 3702.43 3765.65 31.61 0.00 31.61 18.32 96 0.00 0.00 3640.22 3702.43 31.10 0.00 31.10 17.35 97 0.00 0.00 3578.99 3640.22 30.61 0.00 30.61 16.39 98 99 0.00 0.00 0.00 0.00 3518.76 3459.51 3578.99 3518.76 30.12 29.63 0.00 0.00 30.12 29.63 15.42 14.46 100 0.00 0.00 3401.21 3459.51 29.15 0.00 29.15 13.50 101 0.00 0.00 3343.86 3401.21 28.67 0.00 28.67 12.53 102 0.00 0.00 3287.45 3343.86 28.21 0.00 28.21 11.57 103 0.00 0.00 3231.94 3287.45 27.75 0.00 27.75 10.60 ' 104 0.00 0.00 3177.34 3231.94 27.30 0.00 27.30 9.64 105 0.00 0.00 3123.62 3177.34 26.86 0.00 26.86 8.68 106 0.00 0.00 3070.78 3123.62 26.42 0.00 26.42 7.71 107 0.00 0.00 3018.79 3070.78 25.99 0.00 25.99 6.75 108 0.00 0.00 2967.64 3018.79 25.57 0.00 25.57 518 ' 109 0.00 D.00 2917.32 2967.64 25.16 0.00 25.16 4.82 110 0.00 0.00 2867.82 2917.32 24.75 0.00 24.75 3.86 111 0.00 0.00 2819.13 2867.82 24.35 0.00 24.35 2.89 112 0.00 0.00 2771.22 2819.13 23.95 0.00 2195 1.93 ' 113 0.00 0.00 2724.09 2771.22 23.57 0.00 23.57 0.96 114 0.00 0.00 2677.72 2724.09 23.18 0.00 23.18 0.00 115 0.00 0.00 2632.11 2677.72 22.81 0.00 22.81 0.00 116 0.00 0.00 2587.24 2632.11 22.44 0.00 22.44 0.00 117 0.00 0.00 2543.09 2587.24 22.07 0.00 22.07 0.00 ' 118 0.00 0.00 2499.66 2543.09 21.72 0.00 21.72 0.00 119 0.00 0.00 2456.93 2499.66 21.36 0.00 21.36 0.00 120 0.00 0.00 2414.90 2456.93 21.02 0.00 21.02 0.00 121 0.00 0.00 2373.55 2414.90 20.68 0.00 20.68 0.00 ' 122 0.00 0.00 2332.87 2373.55 20.34 0.00 20.34 0.00 123 0.00 0.00 2292.85 2332.87 20.01 0.00 20.01 0.00 124 0.00 0.00 2253.48 2292.85 19.69 0.00 19.69 0.00 125 0.00 0.00 2214.75 2253.48 19.37 0.00 19.37 0.00 EXISTING POND- Routing.xls I I 1 1 C Ll L7 1 1 1 Time Inflow 11 +12 126 0.00 0.00 127 0.00 0.00 128 0.00 0.00 129 0.00 0.00 130 0.00 0.00 131 0.00 0.00 132 0.00 0.00 133 0.00 0.00 134 0.00 0.00 135 0.00 0.00 136 0.00 0.00 137 0.00 0.00 138 0.00 0.00 139 0.00 0.00 140 0.00 0.00 141 0.00 0.00 142 0.00 0.00 143 0.00 0.00 144 0.00 0.00 145 0.00 0.00 146 0.00 0.00 147 0.00 0.00 148 0.00 0.00 149 0.00 0.00 150 0.00 0.00 151 0.00 0.00 152 0.00 0.00 153 0.00 0.00 154 0.00 0.00 155 0.00 0.00 156 0.00 0.00 157 0.00 0.00 158 0.00 0.00 159 0.00 0.00 160 0.00 0.00 181 0.00 0.00 162 0.00 0.00 163 0.00 0.00 164 0.00 0.00 165 0.00 0.00 166 0.00 0.00 167 0.00 0.00 168 0.00 0.00 169 0.00 0.00 170 0.00 0.00 171 0.00 0.00 172 0.00 0.00 173 0.00 0.00 174 0.00 0.00 175 0.00 0.00 176 0.00 0.00 177 0.00 0.00 178 0.00 0.00 179 - 0.00 0.00 180 0.00 0.00 Storage Routing Analysis University Heights Subdivision Existing Detention Pond 100 -Year Storm Event Pond 2s /t-0 2slt +O D schar a i 2176.64 2214.75 19.05 2139.16 2176.64 18.74 2102.28 2139.16 18.44 2066.00 2102.28 18.14 2030.31 2066.00 17.85 1995.19 2030.31 17.56 1960.65 1995.19 17.27 1926.67 1960.65 16.99 1893.23 1926.67 16.72 1860.34 1893.23 16.44 1827.99 1860.34 16.18 1796.16 1827.99 15.92 1764.84 1796.16 15.66 1734.03 1764.84 15.40 1703.73 1734.03 15.15 1673.91 1703.73 14.91 44 16.58 1673.91 14.67 1615.72 1644.58 14.43 1587.33 1615.72 14.19 1559.41 1587.33 13.96 1531.93 1559.41 13.74 1504.90 1531.93 13.51 1478.31 1504.90 13.30 1452.13 1478.31 13.09 1426.39 1452.13 12.87 1401.08 1426.39 12.66 1376.19 1401.08 12.44 1351.72 1376.19 12.24 1327.66 1351.72 12.03 1304.00 1327.66 11.83 1280.74 1304.00 11.63 1257.86 1280.74 11.44 1235.37 1257.86 11.25 1213.26 1235.37 11.06 1191.51 1213.26 10.87 1170.13 1191.51 10.69 1149.11 1170.13 10.51 1128.44 1149.11 10.34 1108.11 1128.44 10.16 1088.13 1108.11 9.99 1068.48 1088.13 9.83 1049.16 1068.48 9.66 1030.16 1049.16 9.50 1011.48 1030.16 9.34 993.11 1011.48 9.18 975.05 993.11 9.03 957.29 975.05 8.88 939.82 957.29 8.73 922.66 939.82 8.58 905.77 922.66 8.44 889.17 905.77 8.30 872.85 889.17 8.16 856.80 872.85 8.02 841.02 856.80 7.89 825.50 841.02 7.76 EXISTING POND- ROUSngAs DA 205 Total Pre-Day schar a Discharge Discharg e 0.00 19.05 0.00 0.00 18.74 0.00 0.00 18.44 0.00 0.00 18.14 0.00 0.00 17.85 0.00 0.00 17.56 0.00 0.00 17.27 0.00 0.00 16.99 0.00 0.00 16.72 0.00 0.00 16.44 0.00 0.00 16.18 0.00 0.00 15.92 0.00 0.00 15.66 0.00 0.00 15.40 0.00 0.00 15.15 0.00 0.00 14.91 0.00 0.00 14.67 0.00 0.00 14.43 0.00 0.00 14.19 0.00 0.00 13.96 0.00 0.00 13.74 0.00 0.00 13.51 0.00 0.00 13.30 0.00 0.00 13.09 0.00 0.00 1187 0.00 0.00 12.66 0.00 0.00 12.44 0.00 0.00 12.24 0.00 0.00 12.03 0.00 0.00 11.83 0.00 0.00 11.63 0.00 0.00 11.44 0.00 0.00 11.25 0.00 0.00 11.06 0.00 0.00 10.87 0.00 0.00 10.69 0.00 0.00 10.51 0.00 0.00 10.34 0.00 0.00 10.16 0.00 0.00 9.99 0.00 0.00 9.83 0.00 0.00 9.66 0.00 0.00 9.50 0.00 0.00 9.34 0.00 0.00 9.18 0.00 0.00 9.03 0.00 0.00 8.88 0.00 0.00 8.73 0.00 0.00 8.58 0.00 0.00 8.44 0.00 0.00 8.30 0.00 0.00 8.16 0.00 0.00 8.02 0.00 0.00 7.89 0.00 0.00 7.76 0.00 u u 7 I I 1 I 1 I 1 I r l D I Appendix H Detention Pond 2 I c 'v � > c O a +' 7 R rn � _v L N R U =a c d L M A acd+ C 0 7 € N O CC O to O o o o a wma w VI U Q II II II d d N � a V W T W > O O _ O T T C C � Q r o N t o N o N a� .., J vi 10 ei a O II p II o 0 w II 11 11 L L m � d L d y T m — 2 ry LO N o N b O N r m A Oi Oi Oi E h II II II IO O Y N a O $ d € tf 0 ; 2 s w o w w t0 U U � d m N N N Q Q v .Y E o � O 0 0 N 0 0 N � 2 a II Lq O i 0 N - r r ao ac eC m w m lh m N N O d� v _ II 11 II w a o V LL d c c Q o I'D II It II II II L d l N Of K 0 0 N t7 O O L W Pi t+l 0 v w vi iri h E 0 0 0 0 0 a a < Qi M O M N O t0 Yl m G G O a a 7 € N O CC O to O o o o a wma w VI U Q II II II d Y N � a V W T W > O O _ O T T cc L U M W N a� J 10 C O II p II o 0 w II 11 11 L d � d L d y T > ry LO N o N b O N r C m aD O a a E h II II II IO a a W co c O € tf 0 ; 2 s o w w t0 U U � oo n U m N N N Q Q v .Y E o - O 0 0 h m 0) 0 0 co O a II Lq 0 b 0 M M O D N II 11 II R � m w 0 v oU c If) to w N O QQ O 7 m Cl) O n M QD M M r N P rn 1 m O C t0 C C IL T d m € s VI b W L W T T M N N € 3aoaoo w II 11 11 L d o a u a a d a � GO ay t0 U � Q Q v - 0 0 0 b M M O D 0 b m l0 f0 d d m w 0 v oU c If) to w N QQ C v _ II 11 II m a o V LL d c c Q o I'D II It II II II m Cl) O n M QD M M r N P rn 1 m O C t0 C C IL T d m University Heights Subdivision ' Detention Pond 2 Detention Pond Area - Capacity Data ' Parking Lot Volume Equation V = H * ([Al +A2 + (Al *A2)") / 3) V = volume, ft A = area, ft ' H = difference in elevation, ft I 1 1 1 1 Pond Storage 90 Elevation Depth Area Volume Cumulative Cumulative Volume Volume ft ft (f (ft') (ft' (ft' 313.80 —0 -00 - 0 —0 - 0 0 -------------------- 314.00 - ----------------------- ----- --------------------------- 272 --- - - - - 16 ---- 315.00 -- -- 1 - �0 ----------- 3,314 --- -- - - - -- 1,512- --- - - - - -- 1,530 1.377— ------ 316.00 ----------- 2 = 20 - - -- - - - - -- 4,304 - - -- - - - -- 3,798 - - --- - - - -- 5,328 -- - — 4,795 317.00— .____3._20 ... - - - - -- 5,395 ............. 4 - - - -- ..... 10,167 - - - -- — 9,151 - - - -- 318.00 4.20 6,586 5,981 16,148 14,533 University Heights Subdivision Detention Pond 2 Elevation - Discharge Data Notes: 1. The Outlet Structure is a 12" diameter pvc pipe at 0.50% slope, with a control structure to limit flow. This structure is a 3'x3 concrete structure, 3.2' high, with a 2" wide slot in one face. 2. The overflow spillway is a trapezoidal channel with a crest elevation of 317.00 and a bottom width of 10 feet University Heights Subdivision Detention Pond 2 Elevation - Discharge Data Clogged Condition Depth -Discharge Data Elevation (ft) Pond Depth (ft) 2" Wide Slot 12" Pipe Flow (cfs) Overflow Spillway Flow (cfs) Total Design Flow (cfs) 313.8 0.0 0.00 0.00 0.00 0.00 314.0 0.2 0.05 0.10 0.00 0.05 315.0 1.2 0.66 3.00 0.00 0.66 316.0 2.2 1.63 5.60 0.00 1.63 317.0 3.2 2.86 7.20 0.00 2.86 318.0 4.2 0.00 8.50 21.70 30.20 Notes: 1. The Outlet Structure is a 12" diameter pvc pipe at 0.50% slope, with a control structure to limit flow. This structure is a 3'x3 concrete structure, 3.2' high, with a 2" wide slot in one face. 2. The overflow spillway is a trapezoidal channel with a crest elevation of 317.00 and a bottom width of 10 feet University Heights Subdivision Detention Pond 2 Elevation - Discharge Data Clogged Condition Notes: 1. The Outlet Structure and pipe are plugged under this scenario. 2. The overflow spillway is a trapezoidal channel with a crest elevation of 317.00 and a bottom width of 10 feet Depth - Discharge Data Elevation ft Pond Depth (ft) 2" Wide Slot 12" Pipe Flow cfs) Overflow Spillway Flow (cfs) Total Design Flow (cfs) 313.8 0.0 0.00 0.00 0.00 0.00 314.0 0.2 0.00 0.00 0.00 0.00 315.0 1.2 0.00 0.00 0.00 0.00 316.0 2.2 0.00 0.00 0.00 0.00 317.0 3.2 0.00 0.00 0.00 0.00 318.0 4.2 0.00 0.00 21.70 1 21.70 Notes: 1. The Outlet Structure and pipe are plugged under this scenario. 2. The overflow spillway is a trapezoidal channel with a crest elevation of 317.00 and a bottom width of 10 feet I 1 1 1 1 1 1 1 University Heights Subdivision - Detention Pond 2 Storage Routing Analysis Parameters ranrl Detention Pond Elevation Depth Discharge Storage 2 s/t 2 slt + 0 ft ft O, cfs s, c 313.8 0.0 0.0 0.0 0.0 0.00 314.0 0.2 0.05 16.0 0.5 0.58 315.0 1.2 0.66 1377.0 45.9 46.56 316.0 2.2 1.63 4795.0 159.8 161.46 317.0 3.2 2.86 9151.0 305.0 307.89 318.0 4.2 30.20 14533.0 484.4 514.63 University Heights Subdivision - Detention Pond 2 Storage Routing Analysis Parameters Plugged Condition t_anq I 1 1 i 1 I 1 1 1 Detention Pond Elevation Depth Discharge Storage 2 sit 2 slt + O ft ft O, cfs s, c 313.8 0.0 0.0 0.0 0.0 0.0 314.0 0.2 0.0 16.0 0.5 0.5 315.0 1.2 0.0 1377.0 45.9 45.9 316.0 2.2 0.0 4795.0 159.8 159.8 317.0 3.2 0.0 9151.0 305.0 305.0 318.0 4.2 21.7 14533.0 484.4 506.1 1 Pond -data- for- routing.xls d 2) N � m d . 0 u Uny rn N N a° o d so F- a'o O I � d 0 i I 0 N L Q R p� N O �p a T o = a c= >X W 0 i W 2 C cQ } N M LO N N r N r (SID) OBJeyasia O Em 0 Ln O d . 0 0 0 C l m LL 0 O � d 0 E 0 O N 0 0 0 0 0 0 ° 0 0 ol 0 / / / o / OF /. � o / N / \ ae N �a moo r M LO N N r N r (SID) OBJeyasia O Em 0 Ln O d . C l m LL O � d E O N O I I Pond2- Routing.xls Storage Routing Analysis University Heights Subdivision Detention Pond 2 2 -Year Storm Pond Event DA 305C. 308 & Total Pm Dev Time low 11+12 Inlet Bypass zan o 2s /t+0 plscharce Dis �� Discharge 1®in.1 Law left) Discharce 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 0.22 0.22 0.18 0.22 0.02 0.14 0.16 0.13 2 0.43 0.65 0.72 0.83 0.05 0.28 0.33 0.26 3 0.65 1.08 1.68 1.81 0.07 0.42 0.49 0.39 4 0.87 1.52 3.02 3.19 0.08 0.56 0.65 0.52 5 1.08 1.95 4.76 4.98 0.11 0.70 0.81 0.65 6 1.30 2.39 6.67 7.14 0.14 0.84 0.98 0.77 7 1.52 2.82 9.35 9.69 0.17 0.99 1.16 0.90 8 1.74 3.25 12.18 12.60 0.21 1.13 1.34 1.03 9 1.95 3.69 15.36 15.87 0.25 1.27 1.52 1.16 10 2.17 4.12 18.88 19.48 0.30 1.41 1.71 1.29 11 2.39 4.55 22.73 23.44 0.35 1.55 1.90 1.42 12 2.60 4.99 26.90 27.72 0.41 1.69 2.10 1.55 13 2.82 5.42 31.38 32.32 0.47 1.83 2.30 1.68 14 3.04 5.86 36.16 37.23 0.54 1.97 2.51 1.81 15 3.25 6.29 41.24 42.45 0.61 1.90 _2.51 1.94 16 3.47 6.72 46.62 47.96 0.67 1.83 2.50 2.06 17 3.36 6.83 52.01 53.45 0.72 1.76 2.48 2.19 18 3.25 6.61 57.11 58.63 0.76 1.69 2.45 2.32 19 3.14 6.40 61.90 63.50 0.80 1.62 2.42 2.45 �. 20 3.04 6.18 66.39 68.08 0.84 1.55 139 2.58 21 2.93 5.96 70.60 72.36 0.88 1.48 2.36 2.52 22 2.82 5.75 74.53 76.35 0.91 1.41 2.32 2.45 23 2.71 5.53 78.17 80.06 0.94 1.34 2.28 2.39 24 2.60 5.31 81.54 8149 0.97 1.27 2.24 2.32 25 2.49 5.10 84.64 86.64 1.00 1.20 2.19 2.26 26 2.39 4.88 87.48 89.52 1.02 1.13 2.15 2.19 27 2.28 4.66 90.05 92.14 1.04 1.06 2.10 2.13 28 2.17 4.45 92.37 94.50 1.06 0.99 2.05 2.06 29 2.06 4.23 94.43 96.60 1.08 0.91 2.00 2.00 30 1.95 4.01 96.25 98.44 1.10 0.84 1.94 1.94 31 1.84 3.80 97.82 100.04 1.11 0.77 1.89 1.87 32 1.74 3.58 99.15 101.40 1.12 0.70 1.83 1.81 33 1.63 3.36 100.25 102.51 1.13 0.63 1.77 1.74 34 1.52 3.14 101.11 103.39 1.14 0.56 1.70 1.68 35 1.41 2.93 101.75 104.04 1.15 0.49 1.64 1.61 36 1.30 2.71 102.16 104.46 1.15 0.42 1.57 1.55 37 1.19 2.49 102.36 104.66 1.15 0.35 1.50 1.48 36 1.08 2.28 102.33 104.63 1.15 0.28 1.43 1.42 39 0.98 2.06 102.10 104.39 1.15 0.21 1.36 1.35 40 0.87 1.94 101.65 103.94 1.14 0.14 1.29 1.29 41 0.76 1.63 101.00 103.28 1.14 0.07 1.21 1.23 42 0.65 1.41 100.15 102.41 1.13 0.00 1.13 1.16 43 0.54 1.19 99.10 101.34 1.12 0.00 1.12 1.10 44 0.43 0.98 97.85 100.07 1.11 0.00 1.11 1.03 45 0.33 0.76 96.41 98.61 1.10 0.00 1.10 0.97 46 0.22 0.64 94.78 96.95 1.09 0.00 1.09 0.90 47 0.11 0.33 92.97 95.11 1.07 0.00 1.07 0.84 48 0.00 0.11 90.97 93.07 1.05 0.00 1.05 0.77 49 0.00 0.00 88.90 90.97 1.03 0.00 1.03 0.71 50 0.00 0.00 86.86 88.90 1.02 0.00 1.02 0.65 51 0.00 0.00 84.86 86.86 1.00 0.00 1.00 0.58 52 0.00 0.00 82.90 84.86 0.98 0.00 0.98 0.52 53 0.00 0.00 80.96 82.90 0.97 0.00 0.97 0.45 54 0.00 0.00 79.06 110,16 0.95 0.00 0.95 0.39 55 0.00 0.00 77.19 79.06 0.93 0.00 0.93 0.32 56 0.00 0.00 75.36 77.19 0.92 0.00 0.92 0.26 57 0.00 0.00 73.55 75.36 0.90 0.00 0.90 0.19 58 0.00 0.00 71.77 73.55 0.89 0.00 0.89 0.13 59 0.00 0.00 70.03 71.77 0.87 0.00 0.87 0.06 60 0.00 0.00 68.31 70.03 0.86 0.00 0.86 0.00 61 0.00 0.00 66.63 68.31 0.84 0.00 0.84 0.00 62 0.00 0.00 64.97 66.63 0.83 0.00 0.83 0.00 63 0.00 0.00 63.34 64.97 0.82 0.00 0.82 0.00 64 0.00 0.00 61.73 63.34 0.80 0.00 0.80 0.00 Pond2- Routing.xls Storage Routing Analysis University Heights Subdivision Detention Pond 2 2 -Year Storm Event Pond2- Routing.xls Pond DA 305C. 308 & Total r -Dev Time Inflow 1I +I2 2s /t 0 2sk+0 Disc Inlet Bypass Discharge pischarae Imin.l 1515] 15tS1 Discharoe 65 0.00 0.00 60.16 61.73 0.79 0.00 0.79 0.00 66 0.00 0.00 58.61 60.16 0.77 0.00 0.77 0.00 67 0.00 0.00 57.08 58.61 0.76 0.00 0.76 0.00 68 0.00 0.00 55.59 57.08 0.75 0.00 0.75 0.00 69 0.00 0.00 54.11 55.59 0.74 0.00 0.74 0.00 70 0.00 0.00 52.67 54.11 0.72 0.00 0.72 0.00 71 0.00 0.00 51.24 52.67 0.71 0.00 0.71 0.00 72 0.00 0.00 49.80 51.24 0.72 0.00 0.72 0.00 73 0.00 0.00 48.39 49.80 0.70 0.00 0.70 0.00 74 0.00 0.00 47.02 48.39 0.68 0.00 0.68 0.00 75 0.00 0.00 45.69 47.02 0.67 0.00 0.67 0.00 76 0.00 0.00 44.39 45.69 0.65 0.00 0.65 0.00 77 0.00 0.00 43.13 44.39 0.63 0.00 0.63 0.00 78 0.00 0.00 41.90 43.13 0.61 0.00 0.61 0.00 79 0.00 0.00 40.71 41.90 0.60 0.00 0.60 0.00 80 0.00 0.00 39.54 40.71 0.58 0.00 0.58 0.00 81 0.00 0.00 38.41 39.54 0.57 0.00 0.57 0.00 82 0.00 0.00 37.30 38.41 0.55 0.00 0.55 0.00 83 0.00 0.00 36.23 37.30 0.54 0.00 0.54 0.00 84 0.00 0.00 35.18 36.23 0.52 0.00 0.52 0.00 85 0.00 0.00 34.17 35.18 0.51 0.00 0.51 0.00 86 0.00 0.00 33.17 34.17 0.50 0.00 0.50 0.00 87 0.00 0.00 32.21 33.17 0.48 0.00 0.48 0.00 88 0.00 0.00 31.27 32.21 0.47 0.00 0.47 0.00 89 0.00 0.00 30.36 31.27 0.46 0.00 0.46 0.00 90 0.00 0.00 29.47 30.36 0.45 0.00 0.45 0.00 91 0.00 0.00 28.60 29.47 0.43 0.00 0.43 0.00 92 0.00 0.00 27.76 28.60 0.42 0.00 0.42 0.00 93 0.00 0.00 26.94 27.76 0.41 0.00 0.41 0.00 94 0.00 0.00 26.14 26.94 0.40 0.00 0.40 0.00 95 0.00 0.00 25.36 26.14 0.39 0.00 0.39 0.00 96 0.00 0.00 24.60 25.36 0.38 0.00 0.36 0.00 97 0.00 0.00 23.86 24.60 0.37 0.00 0.37 0.00 98 0.00 0.00 23.15 23.86 0.36 0.00 0.36 0.00 99 0.00 0.00 22.45 23.15 0.35 0.00 0.35 0.00 100 0.00 0.00 21.77 22.45 0.34 0.00 0.34 0.00 101 0.00 0.00 21.10 21.77 0.33 0.00 0.33 0.00 102 0.00 0.00 20.46 21.10 0.32 0.00 0.32 0.00 103 0.00 0.00 19.83 20.46 0.31 0.00 0.31 0.00 104 0.00 0.00 19.22 19.83 0.31 0.00 0.31 0.00 105 0.00 0.00 18.63 19.22 0.30 0.00 0.30 0.00 106 0.00 0.00 18.05 18.63 0.29 0.00 0.29 0.00 107 0.00 0.00 17.48 18.05 0.28 0.00 0.28 0.00 108 0.00 0.00 16.94 17.48 0.27 0.00 0.27 0.00 109 0.00 0.00 16.40 16.94 0.27 0.00 0.27 0.00 110 0.00 0.00 15.88 16.40 0.26 0.00 0.26 0.00 111 0.00 0.00 15.38 15.88 0.25 0.00 0.25 0.00 112 0.00 0.00 14.88 15.38 0.25 0.00 0.25 0.00 113 0.00 0.00 14.40 14.88 0.24 0.00 0.24 0.00 114 0.00 0.00 13.94 14.40 0.23 0.00 0.23 0.00 116 0.00 0.00 13.48 13.94 0.23 0.00 0.23 0.00 116 0.00 0.00 13.04 13.48 0.22 0.00 0.22 0.00 117 0.00 0.00 12.61 13.04 0.22 0.00 0.22 0.00 118 0.00 0.00 12.19 12.61 0.21 0.00 0.21 0.00 119 0.00 0.00 11.78 12.19 010 0.00 0.20 0.00 120 0.00 0.00 11.39 11.78 0.20 0.00 0.20 0.00 Pond2- Routing.xls N IM 47 0 IM ♦ / A N N U La d v 0 T M a mp 0 m N o N A N a. 5 0 0 d E n. '0 I � d ♦ s I i N L CL R L O N L 'O C =a C d = WD E r ° a L Q A 0 O N O U� O UC V M M N N I (slo) Mown0 O O O U) r O 0 0 LO ° v ♦ / N d 7 / LL ii o E a ol d ♦ s 0 0 s C N / O I I Al / / 101, o / o / or / lo e♦ / O N O U� O UC V M M N N I (slo) Mown0 O O O U) r O 0 0 LO ° v N d 7 LL ii o E d s 0 C N O O O O O Storage Routing Analysis University Heights Subdivision Detention Pond 2 10•YearStorm Event Pond2- Routing.xls Pond DA 305C. 308 8 Total reharg Time Inflow 11+12 2a= 2sn +o Di a Inlet Bypass Disc D s e (min.) 1� iefs) Distharae 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 0.29 0.29 0.24 0.29 0.03 0.20 0.22 0.18 2 0.58 0.87 1.00 1.11 0.06 0.40 0.45 0.36 3 0.87 1.46 2.31 2.46 0.07 0.59 0.67 0.54 4 1.16 2.04 4.15 4.35 0.10 0.79 0.89 0.72 5 1.46 2.62 6.50 6.77 0.13 0.99 1.12 0.90 6 1.75 3.20 9.36 9.71 0.17 1.19 1.36 1.08 7 2.04 3.79 12.72 13.15 0.22 1.39 1.60 1.26 8 2.33 4.37 16.55 17.08 0.27 1.58 1.85 1.44 9 2.62 4.95 20.84 21.50 0.33 1.78 2.11 1.62 10 2.91 5.53 25.59 26.38 0.39 1.98 2.37 1.81 11 3.20 6.12 30.78 31.71 0.46 2.18 2.64 1.99 12 3.49 6.70 36.40 37.48 0.54 2.37 2.91 2.17 13 3.79 7.28 42.44 43.68 0.62 2.57 3.19 2.35 14 4.08 7.86 48.88 50.30 0.71 2.77 3. 4 8 8 2.53 15 4.37 8.45 55.83 57.33 0.75 2.67 3.42 2.71 16 4.81 9.18 63.37 65.00 0.82 2.57 3.39 2.89 17 4.66 9.47 71.08 72.84 0.88 2.47 3.36 3.07 18 4.51 9.17 78.36 80.25 0.94 2.37 3.32 3.25 19 4.36 8.87 85.22 87.23 1.00 2.28 3.28 3.43 20 4.21 8.57 91.67 93.79 1.06 2.18 3.24 M 21 4.06 8.27 97.72 99.94 1.11 2.08 3.19 3.52 22 3.91 7.97 103.37 105.68 1.16 1.98 3.14 3.43 23 3.76 7.67 108.62 111.03 1.20 1.88 3.08 3.34 24 3.61 7.37 113.50 115.99 1.25 1.78 3.03 3.25 25 3.46 7.06 117.99 120.56 1.28 1.68 2.97 3.16 26 3.31 6.76 122.11 124.76 1.32 1.58 2.90 3.07 27 3.16 6.46 125.87 128.58 1.35 1.48 2.84 2.98 28 3.01 6.16 129.27 132.04 1.38 1.39 2.77 2.89 29 2.86 5.86 132.32 135.14 1.41 1.29 2.69 2.80 30 2.71 5.56 135.02 137.88 1.43 1.19 2.62 2.71 31 2.56 5.26 137.38 140.28 1.45 1.09 2.54 2.62 32 2.41 4.96 139.40 142.34 1.47 0.99 2.46 2.53 33 2.25 4.66 141.09 144.06 1.48 0.89 2.37 2.44 34 2.10 4.36 142.46 145.45 1.49 0.79 2.29 2.35 35 1.95 4.06 143.51 146.52 1.50 0.69 2.20 2.26 36 1.80 3.76 144.25 147.27 1.51 0.59 2.10 2.17 37 1.65 3.46 144.68 147.71 1.51 0.49 2.01 2.08 38 1.50 3.16 144.81 147.84 1.52 0.40 1.91 1.99 39 1.35 2.86 144.64 147.66 1.51 0.30 1.81 1.90 40 1.20 2.56 144.17 147.19 1.51 0.20 1.71 1.81 41 1.05 2.25 143.42 146.43 1.50 0.10 1.60 1.71 42 0.90 1.95 142.39 145.38 1.49 0.00 1.49 1.62 43 0.75 1.65 141.07 144.04 1.48 0.00 1.48 1.53 44 0.60 1.35 139.49 142.43 1.47 0.00 1.47 1.44 45 0.45 1.05 137.63 140.54 1.45 0.00 1.45 1.35 46 0.30 0.75 135.52 138.39 1.44 0.00 1.44 1.26 47 0.15 0.45 133.14 135.97 1.41 0.00 1.41 1.17 48 0.00 0.15 130.50 133.29 1.39 0.00 1.39 1.08 49 0.00 0.00 127.77 130.50 1.37 0.00 1.37 0.99 50 0.00 0.00 125.07 127.77 1.35 0.00 1.35 0.90 51 0.00 0.00 122.43 125.07 1.32 0.00 1.32 0.81 52 0.00 0.00 119.83 122.43 1.30 0.00 1.30 0.72 53 0.00 0.00 117.27 119.83 1.28 0.00 1.28 0.63 54 0.00 0.00 114.76 117.27 1.26 0.00 1.26 0.54 55 0.00 0.00 112.29 114.76 1.24 0.00 1.24 0.45 56 0.00 0.00 109.86 112.29 1.21 0.00 1.21 0.36 57 0.00 0.00 107.47 109.86 1.19 0.00 1.19 0.27 58 0.00 0.00 105.12 107.47 1.17 0.00 1.17 0.18 59 0.00 0.00 102.81 105.12 1.15 0.00 1.15 0.09 60 0.00 0.00 100.54 102.81 1.13 0.00 1.13 0.00 61 0.00 0.00 98.31 100.54 1.12 0.00 1.12 -0.09 62 0.00 0.00 96.11 98.31 1.10 0.00 1.10 0.00 63 0.00 0.00 93.96 96.11 1.08 0.00 1.08 0.00 Pond2- Routing.xls Storage Routing Analysis University Heights Subdivision Detention Pond 2 10 -Year Storm Event Pond DA 305C. 308 & Total Pre -Dev Time Pond2- Routing.xls Inflow 11 +12 Inlet Bvoass 2s/t-0 2s/t+0 Discharge Discharge Discharge (min.1 LGW igfal Discharge 64 0.00 0.00 91.84 93.96 1.06 0.00 1.06 0.00 65 0.00 0.00 89.75 91.84 1.04 0.00 1.04 0.00 66 0.00 0.00 87.70 89.75 1.02 0.00 1.02 0.00 87 0.00 0.00 85.69 87.70 1.01 0.00 1.01 0.00 68 0.00 0.00 83.71 85.69 0.99 0.00 0.99 0.00 69 0.00 0.00 81.76 83.71 0.97 0.00 0.97 0.00 70 0.00 0.00 79.85 81.76 0.96 0.00 0.96 0.00 71 0.00 0.00 77.97 79.85 0.94 0.00 0.94 0.00 72 0.00 0.00 76.11 77.97 0.93 0.00 0.93 0.00 73 0.00 0.00 74.30 76.11 0.91 0.00 0.91 0.00 74 0.00 0.00 72.51 74.30 0.89 0.00 0.89 0.00 75 0.00 0.00 70.75 72.51 0.88 0.00 0.88 0.00 76 0.00 0.00 69.02 70.75 0.86 0.00 0.86 0.00 77 0.00 0.00 67.32 69.02 0.85 0.00 0.85 0.00 78 0.00 0.00 65.85 67.32 0.84 0.00 0.84 0.00 79 0.00 0.00 64.01 65.65 0.82 0.00 0.82 0.00 80 0.00 0.00 62.39 64.01 0.81 0.00 0.81 0.00 81 0.00 0.00 60.81 62.39 0.79 0.00 0.79 0.00 82 0.00 0.00 59.25 60.81 0.78 0.00 0.78 0.00 83 0.00 0.00 57.71 59.25 0.77 0.00 0.77 0.00 84 0.00 0.00 56.20 57.71 0.75 0.00 0.75 0.00 B5 0.00 0.00 54.72 56.20 0.74 0.00 0.74 0.00 86 0.00 0.00 53.26 54.72 0.73 0.00 0.73 0.00 87 0.00 0.00 51.83 53.26 0.72 0.00 0.72 0.00 88 0.00 0.00 50.42 51.83 0.70 0.00 0.70 0.00 89 0.00 0.00 49.04 50.42 0.69 0.00 0.69 0.00 90 0.00 0.00 47.67 49.04 0.68 0.00 0.88 0.00 91 0.00 0.00 46.34 47.67 0.67 0.00 0.67 0.00 92 0.00 0.00 45.02 46.34 0.66 0.00 0.66 0.00 93 0.00 0.00 43.74 45.02 0.64 0.00 0.64 0.00 94 0.00 0.00 42.50 43.74 0.62 0.00 0.62 0.00 95 0.00 0.00 41.28 42.50 0.61 0.00 0.61 0.00 96 0.00 0.00 40.10 41.28 0.59 0.00 0.59 0.00 97 0.00 0.00 38.96 40.10 0.57 0.00 0.57 0.00 98 0.00 0.00 37.84 38.96 0.56 _ 0.00 0.56 0.00 99 0.00 0.00 36.75 37.84 0.54 0.00 0.54 0.00 100 0.00 0.00 35.69 36.75 0.53 0.00 0.53 0.00 101 0.00 0.00 34.66 35.69 0.52 0.00 0.52 0.00 102 0.00 0.00 33.65 34.66 0.50 0.00 0.50 0.00 103 0.00 0.00 32.68 33.65 0.49 0.00 0.49 0.00 104 0.00 0.00 31.72 32.68 0.48 0.00 0.48 0.00 105 0.00 0.00 30.80 31.72 0.46 0.00 0.46 0.00 106 0.00 0.00 29.90 30.80 0.45 0.00 0.45 0.00 107 0.00 0.00 29.02 29.90 0.44 0.00 0.44 0.00 108 0.00 0.00 28.16 29.02 0.43 0.00 0.43 0.00 109 0.00 0.00 27.33 28.16 0.42 0.00 0.42 0.00 110 0.00 0.00 26.52 27.33 0.40 0.00 0.40 0.00 111 0.00 0.00 25.73 26.52 0.39 0.00 0.39 0.00 112 0.00 0.00 24.97 25.73 0.38 0.00 0.38 0.00 113 0.00 0.00 24.22 24.97 0.37 0.00 0.37 0.00 114 0.00 0.00 23.49 24.22 0.36 0.00 0.36 0.00 115 0.00 0.00 22.78 23.49 0.35 0.00 0.35 0.00 116 0.00 0.00 22.10 22.78 0.34 0.00 0.34 0.00 117 0.00 0.00 21.42 22.10 0.34 0.00 0.34 0.00 118 0.00 0.00 20.77 21.42 0.33 0.00 0.33 0.00 119 0.00 0.00 20.14 20.77 0.32 0.00 0.32 0.00 120 0.00 0.00 19.52 20.14 0.31 0.00 0.31 0.00 Pond2- Routing.xls d � d A U o � y F d U N a � m m � O m C U p U a oso F ao CD I M y I I s CL O N V C O x o. CD °x Wa E �a �Q R N CD O N O � O LL7 C V m cn N N (s;o) eoieyasip O N r O W. W . 0 ♦ B e J ♦ ♦ c LL CD , ♦ e M y E e B 0 N e e e B ♦ s B ♦ I / B , B / B ♦ ♦ / v B s , a , CD \ ° a \ � a \ �a CD O N O � O LL7 C V m cn N N (s;o) eoieyasip O N r O W. W . 0 M J T c LL CD M y E 0 N 0 O O O O I Storage Routing Analysis University Heights Subdivision Detention Pond 25 -Year Storm Event Pond2- RoWing.xis AA 105C. 308 & Inlet Total pm-Day T� nL Inflow I nflo w 11 +I2 2s/t-0 s +O Dischame Bypass Dischawe Discharge Discharge (�J L181 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 0.33 0.33 0.27 0.33 0.03 0.23 0.26 0.21 2 0.66 0.99 1.14 1.26 0.06 0.46 0.52 0.41 3 0.99 1.65 2.64 2.79 0.08 0.70 0.78 0.62 4 1.32 2.31 4.73 4.95 0.11 0.93 1.04 0.83 5 1.65 2.97 7.41 7.70 0.14 1.16 1.31 1.04 6 1.98 3.63 10.66 11.04 0.19 1.39 1.58 1.24 7 2.31 4.29 14.47 14.95 0.24 1.63 1.87 1.45 8 2.64 4.95 18.82 19.42 0.30 1.86 2.16 1.86 9 2.97 5.61 23.70 24.43 0.37 2.09 2.46 1.86 10 3.30 6.27 29.09 29.97 0.44 2.32 2.76 2.07 11 3.63 6.93 34.98 36.02 0.52 2.55 3.07 2.28 12 3.96 7.59 41.35 42.57 0.61 2.79 3.39 2.48 13 4.29 8.25 48.23 49.60 0.69 3.02 3.70 2.69 14 4.62 8.91 55.64 57.14 0.75 3.25 4. 00 2.90 15 4.95 9.57 63.58 65.21 0.82 3.13 3.95 3.11 16 5.45 10.40 72.19 73.98 0.89 3.02 3.91 3.31 17 5.28 10.73 80.99 62.92 0.97 2.90 3.87 3.52 18 5.11 10.39 89.30 91.38 1.04 2.79 3.82 3.73 19 4.94 10.05 97.14 99.35 1.11 2.67 3.78 3.93 20 4.77 9.71 104.51 106.85 1.17 2.55 3.72 AJA 21 4.80 9.37 111.42 113.88 1.23 2.44 3.67 4.04 22 4.43 9.03 117.88 120.45 1.28 2.32 3.61 3.93 23 4.26 8.69 123.89 126.56 1.34 2.21 3.54 3.83 24 4.09 8.35 129.47 132.24 1.38 2.09 3.47 3.73 25 3.92 8.00 134.62 137.48 1.43 1.97 3.40 3.62 26 3.75 7.66 139.35 142.29 1.47 1.86 3.33 3.52 27 3.58 7.32 143.66 146.67 1.51 1.74 3.25 3.42 28 3.41 6.98 147.57 150.65 1.54 1.63 3.16 3.31 29 3.24 6.84 151.07 154.21 1.57 1.51 3.08 3.21 30 3.07 6.30 154.18 157.37 1.60 1.39 2.99 3.11 31 2.90 5.96 158.91 160.14 1.52 1.28 2.90 3.00 32 2.73 5.62 159.25 162.53 1.64 1.16 2.80 2.90 33 2.55 5.28 161.22 164.53 1.66 1.04 2.70 2.79 34 2.38 4.94 162.82 166.16 1.67 0.93 _ 2.60 2.69 35 2.21 4.60 164.06 167.42 1.68 0.81 2.49 2.59 36 2.04 4.26 164.94 168.31 1.69 0.70 2.38 2.48 37 1.87 192 165.47 168.85 1.69 0.58 2.27 2.38 38 1.70 3.58 165.66 169.05 1.69 0.46 2.16 2.28 39 1.53 3.24 165.51 168.90 1.69 0.35 2.04 2.17 40 1.36 2.90 165.03 168.41 1.69 0.23 1.92 2.07 41 1.19 2.55 164.22 167.58 1.68 0.12 1.80 1.97 42 1.02 2.21 163.09 166.44 1.67 0.00 1.67 1.86 43 0.85 1.87 161.65 164.97 1.66 0.00 1.66 1.76 44 0.68 1.53 159.89 163.18 1.64 0.00 1.64 1.66 45 0.51 1.19 157.83 161.06 1.63 0.00 1.63 1.55 46 0.34 0.85 155.47 158.68 1.81 0.00 1.61 1.45 47 0.17 0.51 152.81 155.98 1.58 0.00 1.58 1.35 48 0.00 0.17 149.86 152.98 1.56 0.00 1.56 1.24 49 0.00 0.00 146.80 149.86 1.53 0.00 1.53 1.14 50 0.00 0.00 143.79 146.80 1.51 0.00 1.51 1.04 51 0.00 0.00 140.83 143.79 1.48 0.00 1.48 0.93 52 0.00 0.00 137.91 140.83 1.46 0.00 1.46 0.83 53 0.00 0.00 135.05 137.91 1.43 0.00 1.43 0.72 54 0.00 0.00 132.24 135.05 1.41 0.00 1.41 0.62 55 0.00 0.00 129.47 132.24 1.38 0.00 1.38 0.52 56 0.00 0.00 126.75 129.47 1.36 0.00 1.36 0.41 57 0.00 0.00 124.06 126.75 1.34 0.00 1.34 0.31 58 0.00 0.00 121.45 124.08 1.31 0.00 1.31 0.21 59 0.00 0.00 118.88 121.45 1.29 0.00 1.29 0.10 60 0.00 0.00 116.32 118.86 1.27 0.00 1.27 0.00 61 0.00 0.00 113.83 116.32 1.25 0.00 1.25 -0.10 62 0.00 0.00 111.37 113.83 1.23 0.00 1.23 0.00 63 0.00 0.00 108.96 111.37 1.21 0.00 1.21 0.00 64 0.00 0.00 106.58 108.96 1.19 0.00 1.19 0.00 65 0.00 0.00 104.25 106.58 1.17 0.00 1.17 0.00 Pond2- RoWing.xis t Storage Routing Analysis University Heights Subdivision Detention Pond 26 -Year Storm Event Time Inflow 2 P ond VA 305C. 308 & Inlet Total Pre-Dev leDldi 15781 (91§1 2s/t-0 2sd +0 pischame Bypass 019chame 131scharne Discharge 66 0.00 0.00 101.95 104.25 1.15 0.00 1.15 0.00 67 0.00 0.00 99.70 101.95 1.13 0.00 1.13 0.00 68 0.00 0.00 97.48 99.70 1.11 0.00 1.11 0.00 69 0.00 0.00 95.30 97.48 1.09 0.00 1.09 0.00 70 0.00 0.00 9316 95.30 1.07 0.00 1.07 0.00 71 0.00 0.00 91.05 93.18 1.05 0.00 1.05 0.00 72 0.00 0.00 88.98 91.05 1.04 0.00 1.04 0.00 73 0.00 0.00 86.94 88.98 1.02 0.00 1.02 0.00 74 0.00 0.00 84.94 86.94 1.00 0.00 1.00 0.00 75 76 0.00 0.00 0.00 0.00 82.97 81.04 84.94 82.97 0.98 0.97 0.00 0.00 0.98 0.97 0.00 0.00 77 0.00 0.00 79.14 81.04 0.95 0.00 0.95 0.00 78 0.00 0.00 77.27 79.14 0.94 0.00 0.94 0.00 79 0.00 0.00 75.43 77.27 0.92 0.00 0.92 0.00 80 0.00 0.00 73.62 75.43 0.90 0.00 0.90 0.00 81 0.00 0.00 71.84 73.62 0.89 0.00 0.89 0.00 82 0.00 0.00 70.10 71.84 0.87 0.00 0.87 0.00 83 0.00 0.00 68.38 70.10 0.86 0.00 0.66 0.00 84 0.00 0.00 66.69 68.38 0.84 0.00 0.84 0.00 85 0.00 0.00 65.03 66.89 0.83 0.00 0.83 0.00 86 0.00 0.00 63.40 65.03 0.82 0.00 0.82 0.00 87 0.00 0.00 61.80 63.40 0.80 0.00 0.80 0.00 88 0.00 0.00 60.22 61.80 0.79 0.00 0.79 0.00 89 0.00 0.00 58.67 60.22 0.78 0.00 0.78 0.00 90 0.00 0.00 57.14 58.67 0.76 0.00 0.76 0.00 91 0.00 0.00 55.65 57.14 0.75 0.00 0.75 0.00 92 0.00 0.00 54.17 55.65 0.74 0.00 0.74 0.00 93 0.00 0.00 52.72 54.17 0.72 0.00 0.72 0.00 94 0.00 0.00 51.30 52.72 0.71 0.00 0.71 0.00 95 0.00 0.00 48.90 51.30 0.70 0.00 0.70 0.00 96 0.00 0.00 48.52 49.90 0.69 0.00 0.69 0.00 97 0.00 0.00 47.17 48.52 0.68 0.00 0.68 0.00 98 0.00 0.00 45.83 47.17 0.67 0.00 0.87 0.00 99 0.00 0.00 44.53 45.83 0.65 0.00 0.65 0.00 100 0.00 0.00 43.27 44.53 0.63 0.00 0.63 0.00 101 0.00 0.00 42.03 43.27 0.62 0.00 0.62 0.00 102 0.00 0.00 40.83 42.03 0.60 0.00 0.60 0.00 103 0.00 0.00 39.67 40.83 0.58 0.00 0.58 0.00 104 0.00 0.00 38.53 39.67 0.57 0.00 0.57 0.00 105 0.00 0.00 37.42 38.53 0.55 0.00 0.55 0.00 106 0.00 0.00 36.34 37.42 0.54 0.00 0.54 0.00 107 0.00 0.00 35.30 36.34 0.52 0.00 0.52 0.00 108 0.00 0.00 34.27 35.30 0.51 0.00 0.51 0.00 109 0.00 0.00 33.28 34.27 0.50 0.00 0.50 0.00 110 0.00 0.00 32.31 33.28 0.48 0.00 0.48 0.00 111 0.00 0.00 31.37 32.31 0.47 0.00 0.47 0.00 112 0.00 0.00 30.45 31.37 0.46 0.00 0.48 0.00 113 0.00 0.00 29.56 30.45 0.45 0.00 0.45 0.00 114 0.00 0.00 28.69 29.56 0.43 0.00 0.43 0.00 115 0.00 0.00 27.85 28.69 0.42 0.00 0.42 0.00 118 0.00 0.00 27.02 27.85 0.41 0.00 0.41 0.00 117 0.00 0.00 26.22 27.02 0.40 0.00 0.40 0.00 118 0.00 0.00 25.44 26.22 0.39 0.00 0.39 0.00 119 0.00 0.00 24.68 25.44 0.38 0.00 0.38 0.00 120 0.00 0.00 23.94 24.68 0.37 0.00 0.37 0.00 IJ I I Pond2- Routing.xls 1 r 1 O Lq O U� N V V m O � O M N N (SID) GBJByasid � O � I O 0 LO a v w w r m M _ rn N LL T 0 E = . a o . , c d WX E E �W Sa a. �a LO O N O Lq O U� N V V m O � O M N N (SID) GBJByasid � O � I O 0 LO a v w m / _ rn c LL E o / d E / O / / s / / 0 / e OF O / / s / / / / o / / I o n ® / l � e O Lq O U� N V V m O � O M N N (SID) GBJByasid � O � I O 0 LO a O N 0 I O O O v w m _ rn c LL E o d E O N 0 I O O O R Storage Routing Analysis University Heights Subdivision Detention Pond 50 -Year Storm Event Pond2- Routing.xis Po DA 305C. 308 8 Total Pre -Dev Time fin low I1 +I2 Inlet Bypass 2s /t-0 s +O Discharge Discharge Dlsehawe Imin.l (cm 1911 Discharge 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 0.37 0.37 0.30 0.37 0.03 0.27 0.30 0.24 2 0.74 1.10 1.29 1.41 0.06 0.54 0.61 0.47 3 1.10 1.84 2.96 3.13 0.08 0.82 0.90 0.71 4 1.47 2.58 5.31 5.54 0.12 1.09 1.20 0.94 5 1.84 3.31 8.31 8.62 0.16 1.36 1.52 1.18 6 2.21 4.05 11.94 12.35 0.21 1.63 1.84 1.41 7 2.58 4.79 16.20 16.73 0.26 1.91 2.17 1.65 8 2.95 5.52 21.06 21.72 0.33 2.18 2.51 1.88 9 3.31 6.26 26.51 27.32 0.40 2.45 2.85 2.12 10 3.68 6.99 32.53 33.50 0.49 2.72 3.21 2.35 11 4.05 7.73 39.11 40.26 0.58 2.99 3.57 2.59 12 4.42 8.47 46.24 47.57 0.67 3.27 3.93 2.82 13 4.79 9.20 53.97 55.44 0.73 3.54 4.27 3.08 14 5.15 9.94 62.30 63.91 0.81 3.81 AM 3.29 15 5.52 10.68 71.21 72.97 0.88 167 4.56 3.53 16 6.08 11.60 80.88 82.81 0.97 3.54 4.50 3.76 17 5.89 11.97 90.74 92.85 1.05 3.40 4.45 4.00 18 5.70 11.59 100.07 102.33 1.13 3.27 4.40 4.23 19 5.51 11.21 108.87 111.28 1.21 3.13 4.34 4.47 20 5.32 10.83 117.15 119.70 1.28 2.99 4.27 4.7 21 5.13 10.45 124.91 127.60 1.34 2.86 4.20 4.58 22 4.94 10.07 132.16 134.98 1.41 2.72 4.13 4.47 23 4.75 9.69 138.93 141.85 1.46 2.59 4.05 4.35 24 4.56 9.31 145.20 148.24 1.52 2.45 3.97 4.23 25 4.37 8.93 150.99 154.13 1.57 2.31 3.88 4.11 26 4.18 8.55 156.31 159.54 1.61 2.18 3.79 4.00 27 3.99 8.17 161.17 164.48 1.66 2.04 3.70 3.88 28 3.80 7.79 165.58 168.96 1.69 1.91 3.60 3.76 29 3.61 7.41 169.53 172.99 1.73 1.77 3.50 3.64 30 3.42 7.03 17105 176.56 1.76 1.63 3.39 3.53 31 3.23 8.65 176.13 179.70 1.78 1.50 3.28 3.41 32 3.04 6.27 178.79 182.40 1.81 1.36 3.17 3.29 33 2.85 5.89 151.03 184.68 1.83 1.22 3.05 3.17 34 2.86 5.51 182.86 186.54 1.84 1.09 - 2.93 3.06 35 2.47 5.13 184.28 187.99 1.85 0.95 2.81 2.94 36 2.28 4.75 185.31 189.03 1.86 0.82 2.68 2.82 37 2.09 4.37 185.95 189.68 1.87 0.68 2.55 2.70 38 1.90 3.99 186.20 189.94 1.87 0.54 2.41 2.59 39 1.71 3.61 186.07 189.81 1.87 0.41 2.28 2.47 40 1.52 3.23 185.58 189.30 1.86 0.27 2.14 2.35 41 1.33 2.85 184.71 188.43 1.86 0.14 1.99 2.23 42 1.14 2.47 183.49 187.18 1.85 0.00 1.85 2.12 43 0.95 2.09 181.91 185.58 1.83 0.00 1.83 2.00 44 0.76 1.71 179.99 183.62 1.82 0.00 1.82 1.88 45 0.57 1.33 177.73 181.32 1.80 0.00 1.80 1.76 46 0.38 0.95 175.13 178.68 1.77 0.00 1.77 1.65 47 0.19 0.57 172.20 175.70 1.75 0.00 1.75 1.53 48 0.00 0.19 168.95 172.39 1.72 0.00 1.72 1.41 49 0.00 0.00 165.56 168.95 1.69 0.00 1.69 1.29 50 0.00 0.00 162.23 165.56 1.66 0.00 1.66 1.18 51 0.00 0.00 158.96 162.23 1.64 0.00 1.64 1.06 52 0.00 0.00 155.74 158.96 1.61 0.00 1.61 0.94 53 0.00 0.00 152.58 155.74 1.58 0.00 1.58 0.82 54 0.00 0.00 149.47 152.58 1.56 0.00 1.56 0.70 55 0.00 0.00 146.41 149.47 1.53 0.00 1.53 0.59 56 0.00 0.00 143.40 146.41 1.50 0.00 1.50 0.47 57 0.00 0.00 140.45 143.40 1.48 0.00 1.48 0.35 58 0.00 0.00 137.54 140.45 1.45 0.00 1.45 0.23 59 0.00 0.00 134.69 137.54 1.43 0.00 1.43 0.12 60 0.00 0.00 131.88 134.69 1.40 0.00 1.40 0.00 61 0.00 0.00 129.12 131.88 1.38 0.00 1.38 -0.12 62 0.00 0.00 126.41 129.12 1.36 0.00 1.36 0.00 63 0.00 0.00 123.74 128.41 1.33 0.00 1.33 0.00 64 0.00 0.00 121.11 123.74 1.31 0.00 1.31 0.00 65 0.00 0.00 118.54 121.11 1.29 0.00 1.29 0.00 Pond2- Routing.xis I Storage Routing Analysis University Heights Subdivision Detention Pond 50•YearStonn Event I Total Pre -Dev Discharge Discharge 1.27 0.00 1.25 0.00 1.23 0.00 1.20 0.00 1.18 0.00 1.16 0.00 1.14 0.00 1.13 0.00 1.11 0.00 1.09 0.00 1.07 0.00 1.05 0.00 1.03 0.00 1.02 0.00 1.00 0.00 0.98 0.00 0.97 0.00 0.95 0.00 0.93 0.00 0.92 0.00 0.90 0.00 0.89 0.00 0.87 0.00 0.86 0.00 0.84 0.00 0.83 0.00 0.81 0.00 0.80 0.00 0.79 0.00 0.77 0.00 0.76 0.00 0.75 0.00 0.74 0.00 0.72 0.00 0.71 0.00 0.70 0.00 0.69 0.00 0.68 0.00 0.67 0.00 0.65 0.00 0.63 0.00 0.61 0.00 0.60 0.00 0.58 0.00 0.57 0.00 0.55 0.00 0.54 0.00 0.52 0.00 0.51 0.00 0.50 0.00 0.48 0.00 0.47 0.00 0.46 0.00 0.44 0.00 0.43 0.00 I Pond2- Routing.xis DA 105C. 308 8 Pond Time Inflow +12 2sk-O 2sn +O Discharge Inlet Bvoass imin.l 1�1 16�t Discharge 66 0.00 0.00 116.00 118.54 1.27 0.00 67 0.00 0.00 113.51 116.00 1.25 0.00 68 0.00 0.00 111.06 113.51 1.23 0.00 69 0.00 0.00 108.65 111.06 1.20 0.00 70 0.00 0.00 106.28 108.65 1.18 0.00 71 0.00 0.00 103.95 106.28 1.16 0.00 72 0.00 0.00 101.66 103.95 1.14 0.00 73 0.00 0.00 99.41 101.66 1.13 0.00 74 0.00 0.00 97.20 99.41 1.11 0.00 75 0.00 0.00 95.02 97.20 1.09 0.00 76 0.00 0.00 92.89 95.02 1.07 0.00 77 0.00 0.00 90.78 92.89 1.05 0.00 78 0.00 0.00 88.72 90.78 1.03 0.00 79 0.00 0.00 86.69 88.72 1.02 0.00 80 81 0.00 0.00 0.00 0.00 84.69 82.72 86.89 84.69 1.00 0.98 0.00 0.00 82 0.00 0.00 80.79 82.72 0.97 0.00 83 0.00 0.00 78.90 80.79 0.95 0.00 84 0.00 0.00 77.03 78.90 0.93 0.00 85 0.00 0.00 75.20 77.03 0.92 0.00 86 0.00 0.00 73.39 7520 0.90 0.00 87 0.00 0.00 71.62 73.39 0.89 0.00 88 0.00 0.00 69.88 71.62 0.87 0.00 89 0.00 0.00 68.16 69.88 0.86 0.00 90 0.00 0.00 66.48 68.16 0.84 0.00 91 0.00 0.00 64.82 66.48 0.83 0.00 92 0.00 0.00 63.19 64.82 0.81 0.00 93 0.00 0.00 61.59 63.19 0.80 0.00 94 0.00 0.00 60.02 61.59 019 0.00 95 0.00 0.00 58.47 60.02 0.77 0.00 96 0.00 0.00 56.95 58.47 0.76 0.00 97 0.00 0.00 55.45 56.95 015 0.00 98 0.00 0.00 53.98 55.45 0.74 0.00 99 0.00 0.00 52.54 53.98 0.72 0.00 100 0.00 0.00 51.12 52.54 0.71 0.00 - 101 0.00 0.00 49.72 51.12 0.70 0.00 102 0.00 0.00 48.35 49.72 0.69 0.00 103 104 0.00 0.00 0.00 0.00 47.00 45.67 48.35 47.00 0.68 0.67 0.00 0.00 105 0.00 0.00 44.37 45.67 0.65 0.00 106 0.00 0.00 43.11 44.37 0.63 0.00 107 0.00 0.00 41.88 43.11 0.61 0.00 108 0.00 0.00 40.68 41.88 0.60 0.00 109 0.00 0.00 39.52 40.68 0.58 0.00 110 0.00 0.00 38.39 39.52 0.57 0.00 111 0.00 0.00 37.28 38.39 0.55 0.00 112 0.00 0.00 36.21 37.28 0.54 0.00 113 0.00 0.00 35.16 38.21 0.52 0.00 114 0.00 0.00 34.15 35.16 0.51 0.00 - 115 0.00 0.00 33.16 34.15 0.50 0.00 116 0.00 0.00 32.19 33.16 0.48 0.00 117 0.00 0.00 31.25 32.19 0.47 0.00 118 0.00 0.00 30.34 31.25 0.46 0.00 119 0.00 0.00 29.45 30.34 0.44 0.00 120 0.00 0.00 28.58 29.45 0.43 0.00 I Total Pre -Dev Discharge Discharge 1.27 0.00 1.25 0.00 1.23 0.00 1.20 0.00 1.18 0.00 1.16 0.00 1.14 0.00 1.13 0.00 1.11 0.00 1.09 0.00 1.07 0.00 1.05 0.00 1.03 0.00 1.02 0.00 1.00 0.00 0.98 0.00 0.97 0.00 0.95 0.00 0.93 0.00 0.92 0.00 0.90 0.00 0.89 0.00 0.87 0.00 0.86 0.00 0.84 0.00 0.83 0.00 0.81 0.00 0.80 0.00 0.79 0.00 0.77 0.00 0.76 0.00 0.75 0.00 0.74 0.00 0.72 0.00 0.71 0.00 0.70 0.00 0.69 0.00 0.68 0.00 0.67 0.00 0.65 0.00 0.63 0.00 0.61 0.00 0.60 0.00 0.58 0.00 0.57 0.00 0.55 0.00 0.54 0.00 0.52 0.00 0.51 0.00 0.50 0.00 0.48 0.00 0.47 0.00 0.46 0.00 0.44 0.00 0.43 0.00 I Pond2- Routing.xis `m m m O La 3 O < d N_ C d 0 E d 0 s a A ai O N = O „a dx > W X Z OW Na IL � m 0 0 O O O O O O O O O O tD v Cl) N (s ;a) aB�eyasia O O `•, E O La 3 O C LL L E 0 M d O N 0 0 s o / o / o � / 0 / o / o / vo \ \ LO \ OD \ O O O O O O O O O O tD v Cl) N (s ;a) aB�eyasia O O `•, E O La 3 C LL L E M d O N O Storage Routing Analysis University Heights Subdivision Detention Pond 2 100 -Year Storm Event Pond2- Routing.As EQIIIL DA 305C. 308 8 T ota l Pre-Dev Time Inflow I1 +I2 Inlet Bvoass 2sttA zsn.o Discharge Discharge Diacharge !0110.1 Ipw 19f91 Discharge 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 0.38 0.38 0.32 0.38 0.03 0.29 0.32 0.25 2 0.76 1.14 1.34 1.46 0.06 0.57 0.64 0.49 3 1.14 1.91 3.07 3.24 0.09 0.88 0.95 0.74 4 1.53 2.67 5.51 5.74 0.12 1.15 1.27 0.98 5 1.91 3.43 8.62 8.94 0.16 1.44 1.60 1.23 6 2.29 4.20 12.39 12.81 0.21 1.72 1.94 1.47 7 2.67 4.96 16.80 17.35 0.27 2.01 2.28 1.72 8 105 5.72 2144 22.52 0.34 2.30 2.64 1.96 9 3.43 6.48 27.49 28.33 0.42 2.58 3.00 2.21 10 3.81 7.25 33.73 34.74 a50 2.87 3.37 2.46 11 4.20 8.01 40.55 41.74 0.60 3.16 3.75 2.70 12 4.58 8.77 47.96 49.32 0.68 3.45 4.13 2.95 13 4.96 9.54 55.99 57.49 0.75 3.73 4.49 3.19 14 5.34 10.30 64.63 66.29 0.83 4.02 4.8 3.44 15 5.72 11.06 73.88 75.70 0.91 3.88 4.78 3.68 18 6.30 12.02 83.92 85.91 0.99 3.73 4.73 3.93 17 6.10 12.40 94.16 96.32 1.08 3.59 4.67 4.17 18 5.91 12.01 103.85 106.17 1.16 3.45 4.61 4.42 19 5.71 11.62 112.98 115.46 1.24 3.30 4.54 4.66 20 5.51 11.22 121.57 124.20 1.32 3.16 4.47 4,91 21 5.32 10.83 129.63 132.40 1.38 3.02 4.40 4.79 22 5.12 10.43 137.16 140.06 1.45 2.87 4.32 4.66 23 4.92 10.04 144.19 147.21 1.51 2.73 4.24 4.54 24 4.73 9.65 150.70 153.83 1.57 2.56 4.15 4.42 25 4.53 9.25 156.72 159.95 1.62 2.44 4.06 4.30 28 4.33 8.86 162.25 165.58 1.66 2.30 3.96 4.17 27 4.13 8.47 167.30 170.72 1.71 2.15 3.86 4.05 28 3.94 8.07 171.88 175.37 1.75 2.01 3.76 3.93 29 3.74 7.88 175.99 179.56 1.78 1.87 3.65 3.81 30 3.54 7.28 179.65 183.28 1.61 1.72 3.54 3.68 31 3.35 6.89 182.86 186.54 1.84 1.58 3.42 3.56 32 3.15 6.50 185.63 189.36 1.86 1.44 3.30 3.44 33 2.95 6.10 187.96 191.73 1.88 1.29 3.18 3.31 34 2.76 5.71 189.87 193.67 1.90 1.15+ 3.05 3.19 35 2.58 5.32 191.36 195.19 1.91 1.01 2.92 3.07 36 2.36 4.92 192.44 196.28 1.92 0.86 2.78 2.95 37 2.17 4.53 193.11 196.96 1.93 0.72 2.65 2.82 38 1.97 4.13 193.38 197.24 1.93 0.57 2.50 2.70 39 1.77 3.74 19326 197.12 1.93 0.43 2.36 2.58 40 1.58 3.35 192.75 196.61 1.93 0.29 2.21 2.46 41 1.38 2.95 191.88 195.71 1.92 0.14 2.06 2.33 42 1.18 2.56 190.82 194.44 1.91 0.00 1.91 2.21 43 0.98 2.17 189.00 192.79 1.89 0.00 1.89 2.09 44 0.79 1.77 187.02 190.77 1.88 0.00 1.88 1.96 45 0.59 1.38 184.69 188.40 1.86 0.00 1.86 1.84 46 0.39 0.98 182.00 185.87 1.83 0.00 1.83 1.72 47 0.20 0.59 178.98 182.60 1.81 0.00 1.81 1.60 48 0.00 0.20 175.62 179.18 1.78 0.00 1.78 1.47 49 0.00 0.00 172.12 175.62 1.75 0.00 1.75 1.35 50 0.00 0.00 168.68 172.12 1.72 0.00 1.72 1.23 51 0.00 0.00 165.30 168.68 1.69 0.00 1.69 1.10 52 0.00 0.00 161.98 165.30 1.66 0.00 1.66 0.98 53 0.00 0.00 158.71 161.98 1.63 0.00 1.63 0.86 54 0.00 0.00 155.49 158.71 1.61 0.00 1.61 0.74 55 0.00 0.00 152.33 155.49 1.58 0.00 1.58 0.61 56 0.00 0.00 149.23 152.33 1.55 0.00 1.55 0.49 57 0.00 0.00 146.18 149.23 1.53 0.00 1.53 0.37 58 0.00 0.00 143.17 146.18 1.50 0.00 1.50 0.25 59 0.00 0.00 140.22 143.17 1.48 0.00 1.48 0.12 60 0.00 0.00 137.32 140.22 1.45 0.00 1.45 0.00 61 0.00 0.00 134.47 137.32 1.43 0.00 1.43 -0.12 62 0.00 0.00 131.66 134.47 1.40 0.00 1.40 0.00 63 0.00 0.00 128.91 131.66 1.38 0.00 1.38 0.00 64 0.00 0.00 126.20 128.91 1.36 0.00 1.38 0.00 65 0.00 0.00 123.53 126.20 1.33 0.00 1.33 0.00 Pond2- Routing.As Storage Routing Analysis University Heights Subdivision Detention Pond 2 100 -Year Storm Event Pond2- Rauling.xls Pond DA 305C. 308 8 Total re -Dev Time moor, 11+12 2sA-0 2sn +o Discharge Inlet Bypass Discharae Dischame (min,l tQM WS Discharae 66 0.00 0.00 120.91 123.53 1.31 0.00 1.31 0.00 87 0.00 0.00 118.34 120.91 1.29 0.00 1.29 0.00 68 0.00 0.00 115.81 118.34 1.27 0.00 1.27 0.00 69 0.00 0.00 113.32 115.81 1.24 0.00 1.24 0.00 70 0.00 0.00 110.87 113.32 1.22 0.00 1.22 0.00 71 0.00 0.00 108.46 110.87 1.20 0.00 1.20 0.00 72 0.00 0.00 106.10 108.46 1.18 0.00 1.18 0.00 73 0.00 0.00 103.77 106.10 1.16 0.00 1.16 0.00 74 0.00 0.00 101.49 103.77 1.14 0.00 1.14 0.00 75 0.00 0.00 99.24 101.49 1.12 0.00 1.12 0.00 76 0.00 0.00 97.03 99.24 1.10 0.00 1.10 0.00 77 0.00 0.00 94.86 97.03 1.09 0.00 1.09 0.00 78 0.00 0.00 92.72 94.86 1.07 0.00 1.07 0.00 79 0.00 0.00 90.62 92.72 1.05 0.00 1.05 0.00 80 0.00 0.00 88.56 90.62 1.03 0.00 1.03 0.00 81 0.00 0.00 86.53 88.56 1.01 0.00 1.01 0.00 82 0.00 0.00 84.53 86.53 1.00 0.00 1.00 0.00 83 0.00 0.00 82.57 84.53 0.98 0.00 0.98 0.00 84 0.00 0.00 80.65 82.57 0.96 0.00 0.96 0.00 85 0.00 0.00 78.75 80.65 0.95 0.00 0.95 0.00 86 0.00 0.00 76.89 78.75 0.93 0.00 0.93 0.00 87 0.00 0.00 75.05 76.89 0.92 0.00 0.92 0.00 88 0.00 0.00 73.25 75.05 0.90 0.00 0.90 0.00 89 0.00 0.00 71.48 73.25 0.89 0.00 0.89 0.00 90 0.00 0.00 69.74 71.48 0.87 0.00 0.87 0.00 91 0.00 0.00 68.03 69.74 0.86 0.00 0.86 0.00 92 0.00 0.00 66.35 68.03 0.84 0.00 0.84 0.00 93 0.00 0.00 64.89 66.35 0.83 0.00 0.83 0.00 94 0.00 0.00 63.07 64.69 0.81 0.00 0.81 0.00 95 0.00 0.00 61.47 63.07 0.80 0.00 0.80 0.00 96 0.00 0.00 59.90 61.47 0.79 0.00 0.79 0.00 97 0.00 0.00 58.35 59.90 0.77 0.00 0.77 0.00 98 0.00 0.00 56.83 58.35 0.76 0.00 0.76 0.00 99 0.00 0.00 55.34 56.83 0.75 0.00 0.75 0.00 100 0.00 0.00 53.87 55.34 0.73 0.00. 0.73 0.00 101 0.00 0.00 52.43 53.87 0.72 0.00 0.72 0.00 102 0.00 0.00 51.01 52.43 0.71 0.00 0.71 0.00 103 0.00 0.00 49.61 51.01 0.70 0.00 0.70 0.00 104 0.00 0.00 4821 49.61 0.70 0.00 0.70 0.00 105 0.00 0.00 48.85 48.21 0.68 0.00 0.68 0.00 105 0.00 0.00 45.52 46.85 0.66 0.00 0.66 0.00 107 0.00 0.00 44.23 45.52 0.65 0.00 0.65 0.00 108 0.00 0.00 42.97 44.23 0.63 0.00 0.63 0.00 109 0.00 0.00 41.75 42.97 0.61 0.00 0.61 0.00 110 0.00 0.00 40.55 41.75 0.60 0.00 0.60 0.00 111 0.00 0.00 39.39 40.55 0.58 0.00 0.58 0.00 112 0.00 0.00 38.26 39.39 0.56 0.00 0.56 0.00 113 0.00 0.00 37.16 38.26 0.55 0.00 0.55 0.00 114 0.00 0.00 36.09 37.16 0.54 0.00 0.54 0.00 115 0.00 0.00 35.05 36.09 0.52 0.00 0.52 0.00 116 0.00 0.00 34.04 35.05 0.51 0.00 0.51 0.00 117 0.00 0.00 33.05 34.04 0.49 0.00 0.49 0.00 118 0.00 0.00 32.09 33.05 0.48 0.00 0.48 0.00 119 0.00 0.00 31.15 32.09 0.47 0.00 0.47 0.00 120 0.00 0.00 30.24 31.15 0.46 0.00 0.46 0.00 Pond2- Rauling.xls I Appendix I Holleman Drive South Ditch Flow Existing Condition Comparison I I I 0 1 a a c Z ul CL CL a C 0 CL 0 U O V r- 0 0 V Im c w W d � N A Ip a E .0 9 W fn 'd d s P Q IM 1 C c 2 7 0 II p II .S' J N U N p O Y a Mi N i d r T W ri � II II N aa V C O a D d � N V O b T o W 2 m c r o 0 a O A Y C N C ° N I O d O t+i N q d C N f0 E O � N b O Y Y w J 2, m O � U ° n M N 0 0 a y Y a O Q N CL C � N a C II p II .S' J N U N € � i O II p II .S' J N € � O r W � II II II a D d � O O .-. M O C O C E O w J 2, m O � N O CL C l4 w V w C E € U') co N O ` m a0 O O v y o �•- 3 C U O c 9 `o C � Y � E �~ CL O d N C O O a y�wo yd� Y O � � II II II m a v al O p M V N Z a p p c C U li a w N L I1 0 11 0 11 a 11 U_ 11 m EXFIIBITS Exhibit A — Drainage Area Map — Pre- Development Exhibit B — Drainage Area Map — Post - Development Pond Design Exhibit C — Drainage Area Map — Post - Development Exhibit D — Existing Pond Grading Plan Exhibit E — Detention Pond 2 Grading Plan Exhibit F — Overall Grading Plan