Loading...
HomeMy WebLinkAboutLetter Acknowledging City StandardsMay 23, 2011 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas Schultz Engineering, LLC RE: Letter Acknowledging City Standards — University Heights Subdivision Phase 1 Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above - referenced project, to the best of my knowledge, do not deviate from the B /CS Design Guideline Manual except that Waterline W -4, shown on Sheet 16 has a bury depth greater than 5' in order for the waterline to get under storm sewer pipe 114 and the existing Explorer Pipeline. Also, Waterline W -2, shown on Sheet 17 has a bury depth greater than 5' in order for the waterline to get under the existing Explorer Pipeline. Also, Waterline W -3, shown on Sheet 18 has a bury depth greater than 5' in order for the waterline to get under storm sewer pipe 112 and the existing Explorer Pipeline. No other alternate design or construction methodology was used. I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B /CS Standard Details. Sincerely, 1 J Jeph P. Schultz, P.E. Civil Engineer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com Office: 979.764.3900 Fax: 979.764.3910