HomeMy WebLinkAboutCost EstimatesStreet Construction Items
10
Excavation & Grading, complete in place
LS
1
$ 36,000.00
$36,000
11
Mixing & incorporation of lime, 6" deep, complete in place
SY
14,926
$ 2.20
$32,837
12
Hydrated Lime, complete in place
Ton
210
$ 150.00
$31,500
13
Crushed Limestone Base Material - 6" thick, complete in place
SY
8,315
$ 10.00
$83,150
14
HMAC - Type D Pavement 2" thick - includes prime coat, complete in place
SY
8,315
$ 10.00
$83,150
15
Concrete Curb & Gutter (Standard), complete in place
LF
877
$ 10.50
$9,209
16
Concrete Curb & Gutter (Laydown), complete in place
LF
4,543
$ 10.50
$47,702
17
Reinforced Concrete Pavement - Aprons - 6" Thick w/ Monolithic Standard
Curb, complete in place
SF
11,555
$ 3.90
$45,065
18
Reinforced Concrete Pavement - Alleys - 6" thick, complete in place
SF
18,496
$ 3.90
$72,133
19
Concrete Sidewalk & Ramps - 4" thick, complete in place
SF
21,624
$ 3.40
$73,522
20
Pipeline Protection - Concrete Pads, complete in place
SF
529
$ 6.00
$3,171
21
ADA Ramps - Detectable Warning Surfaces, complete in place
EA
22
$ 500.00
$11,000
Street Construction Items Subtotal
5528,437
Item
I Description
Unit
I Estimated Quantity
Unit Price
Total
General Items
1
Mobilization, Overhead and Construction Staking
LS
1
$ 25,000.00
$25,000
2
Traffic Control - complete in place
LS
1
$ 2,000.00
$2,000
3
Right of Way and Site Preparation
LS
1
$ 10,000.00
$10,000
4
Topsoil Removal and Replacement, complete in place
LS
1
$ 20,000.00
$20,000
5
Install End of Street Signs, complete in place
EA
18
$ 150.00
$2,700
6
Remove Existing Driveways
EA
3
$ 500.00
$1,500
7
Erosion & Sediment Control - SWPPP Implementation & Maintenance, Silt
Fence, Construction Exit, Rock Filter Dam, etc., complete in place
LS
1
$ 7,500.00
$7,500
8
Landscape and Irrigation Sleeves - 2 - 4" PVC, complete in place
LF
60
$ 10.00
$600
9
Hydroseed and Hydromulch, complete in place
SY
40,000
$ 0.55
$22,000
General Items Subtotal
591,300
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
University Heights Subdivision
Phase 1
Engineer's Estimate of Construction
Revised July 27, 2011
Page 1 of 4
Storm Sewer Construction Items
22
30" RCP Pipe, complete in place (Structural)
LF
740
$ 70.00
$51,800
23
30" RCP Pipe, complete in place (Non - Structural)
LF
686
$ 60.00
$41,178
24
24" RCP Pipe, complete in place (Structural)
LF
626
$ 55.00
$34,430
25
18" RCP Pipe, complete in place (Structural)
LF
218
$ 45.00
$9,810
26
18" RCP Pipe, complete in place (Non - Structural)
LF
91
$ 40.00
$3,640
27
18" - 6H:I V Concrete SET, complete in place
EA
4
$ 1,000.00
$4,000
28
Curb Inlet - 5' wide, complete in place
EA
2
$ 2,600.00
$5,200
29
Curb Inlet - 10' wide, complete in place
EA
7
$ 3,500.00
$24,500
30
Curb Inlet - 15' wide, complete in place
EA
3
$ 4,000.00
$12,000
31
Alley Gutter Area Inlet - 2 -V -4430, complete in place
EA
1
$ 3,500.00
$3,500
32
Alley Gutter Area Inlet - 3 -V -4430, complete in place
EA
1
$ 3,500.00
$3,500
29
Junction Box, complete in place
EA
4
$ 2,500.00
$10,000
30
Channel No. 1 Construction - Excavation and Grading, complete in place
LS
I
$ 2,000.00
$2,000
31
Rock RipRap, complete in place
SY
23
$ 60.00
$1,380
32
Concrete RipRap, complete in place
SF
32
$ 5.00
$160
33
TV Testing and Inspection, complete in place
LF
2,361
$ 3.50
$8,265
Storm Sewer Construction Items Subtotal
$215,363
Detention Pond 2 Construction Items
34
Pond Excavating and Grading, complete in place
LS
1
$ 2,500.00
$2,500
35
18" HDPE Pipe, complete in place (Non - Structural)
LF
32
$ 35.00
$1,106
36
12" HDPE Pipe, complete in place (Non - Structural)
LF
78
$ 25.00
$1,950
37
Concrete Pond Outlet Structure, complete in place
EA
1
$ 1,500.00
$1,500
38
18" - 6H:I V Concrete SET, complete in place
EA
1
$ 1,000.00
$1,000
39
Concrete End Treatment for 12" Pipe, complete in place
SF
60
$ 6.00
$360
40
4' Wide Concrete Flume, complete in place
SF
370
$ 5.00
$1,850
Detention Pond 2 Construction Items Subtotal
$10,266
Existing Detention Pond Construction Items
41
Pond Excavating and Grading, complete in place
LS
1
$ 32,000.00
$32,000
44
Remove Existing Concrete Flume
LS
1
$ 1,500.00
$1,500
Existing Detention Pond Construction Items Subtotal
$33,500
University Heights Subdivision
Phase 1
Engineer's Estimate of Construction
Page 2 of 4
Water Construction Items
45a
12" C900 Water Pipe - Structural Backfill, complete in place
LF
110
$ 35.00
53,850
45b
10" C900 Water Pipe - Structural Backfill, complete in place
LF
91
$ 30.00
$2,730
45c
8" C900 Water Pipe - Structural Backfill, complete in place
LF
445
$ 26.00
$11,570
46a
12" C900 Water Pipe - Non - Structural Backfill, complete in place
LF
1,321
$ 28.00
$36,988
46b
10" C900 Water Pipe - Non - Structural Backfill, complete in place
LF
627
$ 25.00
$15,675
46c
8" C900 Water Pipe - Non - Structural Backfill, complete in place
LF
1,901
$ 22.00
$41,822
47
Fire Hydrant Assembly (w /valve, vert. extension), complete in place
EA
5
$ 3,500.00
$17,500
48a
12" M.J. Gate Valve, complete in place
EA
3
$ 2,100.00
$6,300
48b
10" M.J. Gate Valve, complete in place
EA
2
$ 1,650.00
$3,300
48c
8" M.J. Gate Valve, complete in place
EA
9
$ 1,050.00
$9,450
49a
12 "x10" M.J. Tee, complete in place
EA
1
$ 600.00
$600
49b
12 "x8" M.J. Tee, complete in place
EA
1
$ 600.00
$600
49c
10 "x8" M.J. Tee, complete in place
EA
1
$ 500.00
$500
49d
10 "x6" M.J. Tee, complete in place
EA
2
$ 500.00
$1,000
49e
8" M.J. Tee, complete in place
EA
2
$ 400.00
$800
50a
8 "x6" M.J. Tee, complete in place
EA
3
$ 400.00
$1,200
51a
2" Blowoff Assembly, complete in place
EA
4
$ 200.00
$800
51b
4" Blowoff Assembly, complete in place
EA
2
$ 1,600.00
$3,200
52a
10" x 22.5 M.J. Bend, complete in place
EA
8
$ 450.00
$3,600
52b
8" x 22.5 M.J. Bend, complete in place
EA
16
$ 350.00
$5,600
53a
12" x 11.25 M.J. Bend, complete in place
EA
2
$ 500.00
$1,000
53b
10" x 11.25 M.J. Bend, complete in place
EA
2
$ 450.00
$900
53c
8" x 11.25 M.J. Bend, complete in place
EA
2
$ 350.00
$700
53d
8 "x12" M.J. Reducer, complete in place
EA
1
$ 500.00
$500
54a
1" Water Service < 15 ft (avg. length = 5 ft), complete in place -10" Line
EA
2
$ 650.00
$1,300
54b
1" Water Service < 15 ft (avg. length = 5 ft), complete in place -8" Line
EA
7
$ 500.00
$3,500
55a
1" Water Service >15 ft (avg. length = 48 ft), complete in place -8" Line
EA
2
$ 1,000.00
$2,000
56a
1.5" Water Service < 15 ft (avg. length = 5 ft), complete in place -10" Line
EA
8
$ 700.00
$5,600
56b
1.5" Water Service < 15 ft (avg. length = 5 ft), complete in place -8" Line
EA
15
$ 600.00
$9,000
57a
1.5" Water Service > 15 ft (avg. length = 48 ft), complete in place -8" Line
EA
13
$ 1,200.00
$15,600
58
Meter Boxes, complete in place
EA
83
$ 100.00
$8,300
59
Connect to Existing Water Line, complete in place
EA
1
$ 250.00
$250
60
Fence Removal & Replacement, complete in place
LS
1
$ 300.00
$300
61
Waterline Testing
LS
I
$ 500.00
$500
Water Construction Items Subtotal
$216,535
University Heights Subdivision
Phase 1
Engineer's Estimate of Construction
Revised July 27, 2011
Page 3of4
Sanitary Sewer Construction Items
62
6" PVC Sewer Line - D3034 - Non - Structural Backfill, complete in place
LF
1,314
$ 28.00
$36,792
63
8" PVC Sewer Line - D3034 - Structural Backfill, complete in place
LF
251
$ 34.00
$8,534
64
8" PVC Sewer Line - D3034 - Non - Structural Backfill, complete in place
LF
1,281
$ 30.00
$38,430
65
10" PVC Sewer Line - D3034 - Structural Backfill, complete in place
LF
223
$ 38.00
$8,474
66
10" PVC Sewer Line - D3034 - Non - Structural Backfill, complete in place
LF
305
$ 34.00
510,370
67
6" PVC Sewer Line - ASTM D -2241 - Structural Backfill, complete in place
LF
20
$ 30.00
$600
68
8" PVC Sewer Line - ASTM D -2241 - Structural Backfill, complete in place
LF
60
$ 34.00
$2,040
Sanitary Sewer Construction Items Continued
69
4" Sewer Service - Single (avg. length = 4 ft), complete in place
EA
2
$ 350.00
$700
70
4" Sewer Service - Double (avg length = 4 ft), complete in place
EA
13
$ 450.00
$5,850
71
4" Sewer Service- Single (avg length = 47 ft), complete in place
EA
4
$ 950.00
$3,800
72
4" Sewer Service - Double (avg length = 47 ft), complete in place
EA
25
$ 1,050.00
$26,250
73
6" Clean out, complete in place
EA
1
$ 500.00
$500
74
Tie -In to Existing Manhole, complete in place
EA
1
$ 1,000.00
$1,000
75
Concrete Manhole - 4' Dia. - complete in place
EA
14
$ 3,250.00
$45,500
76
TV Testing and Inspection, complete in place
LF
3,454
$ 3.50
$12,089
Sanitary Sewer Construction Items Subtotal
5200,929
General Items Subtotal
$91,300
Street Construction Items Subtotal
5528,437
Storm Sewer Construction Items Subtotal
S215,363
Detention Pond 2 Construction Items Subtotal
510,266
Existing Detention Pond Construction Items Subtotal
533,500
Water Construction Items Subtotal
5216,535
Sanitary Sewer Construction Items Subtotal
5200,929
TOTAL CONSTRUCTION $1,296,330
University Heights Subdivision
Phase 1
Engineer's Estimate of Construction
Revised July 27, 2011
Not Included:
1. Conduit for Electrical Service
2. Conduit for Street Lights
3. Street Lights
4. Street Name Signs
Page 4 of 4
t� ' ~
if I
�
� JOSEPHP.S ;
65
��ONA
•MI•••
F -12327
SCHULTZ ENGINEERING, LLC.
Z 7 .-l/