HomeMy WebLinkAboutProject Registration ConfirmationAB Project Reprint Confirmation Page
PERSON FILING FORM
Name: Eddie Hare Phone: 979- 820 -0149
Person Address: 5855 Foster Road, Bryan, Tx 77807
Ras Number: 00000008
Texas Department of Licensing and Regulation
Architectural Barriers Project Registration Confirmation Page
Thursday , July 28, 2011
EABPRJB1815920
Project Name: University Heights, Phase I
Project City of College Station Right of Way
Address: South Holleman Drive
College Station, TX 77845 County: Brazos
TENANT
Contact Name: Phone:
Contact Address:
BUILDING /FACILITY Name: City of College Station Right of Way
FACILITY Owner: City of College Station Phone: 979 -764 -3570
Owner Address: P.O. Box 9960, College Station, Tx 77842
Contact Name: Josh Norton Phone:
Contact. Address:
Contact Email: jnorton @cstx.gov
DESIGN FIRM Name: Schultz Engineering LLC Phone: 979 - 764 -3900
Firm Address: P.O. Box 11995, College Station, Tx 77842
Designer Name: Joseph Schultz, PE Etna!: joeschultz84 @verizon.net
Type of License: Engineer License Number: 65889
PROJECT DESCRIPTION
Start Date: 08/2011 Completion date: 02 /2012 Estimated Cost: $84,522.00
Type of Work: New Construction
Type of Funds: This project is privately funded, on private land for private use.
State Lease No. :
Scope of Work: Construction of sidewalks, cross walks and curb ramps
Does this building(s) have more than one level? Not a building
Are there any elevators, escalators, or platform lifts in this building? Not a building
Are there any bolter In this building? Nota building
This AB Project registration Confirmation Page, construction documents, and applicable fees must be submitted in accordance with the
Texas Administrative Code Chapter 68, Rule 68,51.
If TDLR will be performing the review or inspection services, see Rule 68.80.
If a RAS will be performing the review or inspection services, please contact the RAS as they set and collect their own fees, see Rule 6875.
In accordance with Rule 68 52, the owner of a building or facility must also obtain an inspection from the department or a registered
accessibility specialist not later than the first anniversary of the completion of construction. Request for inspection shall be made by
completing the Request for Inspection form and submitting it no later than 30 calendar days after the completion of construction.
hops : / /www; licenses tatea x. us/ ABProjectRegistrationOnline/ ABProjectPrintConftrmation. aspx? strProjNum =EABPRJB1815920[7/28/2011 2:20:19 PM]
Eddie Hare - Accessibility Specialist
Plan Review Report
The following report identifies violations with the Texas Accessibility Standards (TAS). No response is required to this review,
however, all items noted as 'Unacceptable' should be addressed prior to inspection.
RAS Name:
Date of Plan
Review:
Eddie Hare RAS 0008
Saturday, July 30, 2011
Project Information
Project Name: University Heights, Phase I
Facility Name: City of College Station Right of Way
Project Address: South Holleman Drive I City: College Station
Detailed description of contruction activities:
New residential development, includes sidewalks, cross walks and curb ramps
RAS # 0008
I# 1131801 -21
EABPRJB1815920
Name:
Address:
City:
Owner Information
City of College Station,(paid by private development)
P.O. Box 9960
College Station
'State Tx IZip: 77842
The plans submitted are approved and may be eligible for Inspection approval if constructed
in accordance with the Texas Accessibility Standards adopted by the Texas Department of
Licensing and Regulation for the purpose of ensuring compliance with Texas Government
Code, Chapter 469.
The building or facility owner must request an inspection from the Department, (or a
Department authorized provider of inspection services) no later than thirty (30) days after
completion of construction. If the completion date provided on the Project Registration Form
is no longer correct, notify this office (in writing) of the revised completion date as soon as
possible.
Page: Page 1 of 1
Copyright 2007