Loading...
HomeMy WebLinkAboutProject Registration ConfirmationAB Project Reprint Confirmation Page PERSON FILING FORM Name: Eddie Hare Phone: 979- 820 -0149 Person Address: 5855 Foster Road, Bryan, Tx 77807 Ras Number: 00000008 Texas Department of Licensing and Regulation Architectural Barriers Project Registration Confirmation Page Thursday , July 28, 2011 EABPRJB1815920 Project Name: University Heights, Phase I Project City of College Station Right of Way Address: South Holleman Drive College Station, TX 77845 County: Brazos TENANT Contact Name: Phone: Contact Address: BUILDING /FACILITY Name: City of College Station Right of Way FACILITY Owner: City of College Station Phone: 979 -764 -3570 Owner Address: P.O. Box 9960, College Station, Tx 77842 Contact Name: Josh Norton Phone: Contact. Address: Contact Email: jnorton @cstx.gov DESIGN FIRM Name: Schultz Engineering LLC Phone: 979 - 764 -3900 Firm Address: P.O. Box 11995, College Station, Tx 77842 Designer Name: Joseph Schultz, PE Etna!: joeschultz84 @verizon.net Type of License: Engineer License Number: 65889 PROJECT DESCRIPTION Start Date: 08/2011 Completion date: 02 /2012 Estimated Cost: $84,522.00 Type of Work: New Construction Type of Funds: This project is privately funded, on private land for private use. State Lease No. : Scope of Work: Construction of sidewalks, cross walks and curb ramps Does this building(s) have more than one level? Not a building Are there any elevators, escalators, or platform lifts in this building? Not a building Are there any bolter In this building? Nota building This AB Project registration Confirmation Page, construction documents, and applicable fees must be submitted in accordance with the Texas Administrative Code Chapter 68, Rule 68,51. If TDLR will be performing the review or inspection services, see Rule 68.80. If a RAS will be performing the review or inspection services, please contact the RAS as they set and collect their own fees, see Rule 6875. In accordance with Rule 68 52, the owner of a building or facility must also obtain an inspection from the department or a registered accessibility specialist not later than the first anniversary of the completion of construction. Request for inspection shall be made by completing the Request for Inspection form and submitting it no later than 30 calendar days after the completion of construction. hops : / /www; licenses tatea x. us/ ABProjectRegistrationOnline/ ABProjectPrintConftrmation. aspx? strProjNum =EABPRJB1815920[7/28/2011 2:20:19 PM] Eddie Hare - Accessibility Specialist Plan Review Report The following report identifies violations with the Texas Accessibility Standards (TAS). No response is required to this review, however, all items noted as 'Unacceptable' should be addressed prior to inspection. RAS Name: Date of Plan Review: Eddie Hare RAS 0008 Saturday, July 30, 2011 Project Information Project Name: University Heights, Phase I Facility Name: City of College Station Right of Way Project Address: South Holleman Drive I City: College Station Detailed description of contruction activities: New residential development, includes sidewalks, cross walks and curb ramps RAS # 0008 I# 1131801 -21 EABPRJB1815920 Name: Address: City: Owner Information City of College Station,(paid by private development) P.O. Box 9960 College Station 'State Tx IZip: 77842 The plans submitted are approved and may be eligible for Inspection approval if constructed in accordance with the Texas Accessibility Standards adopted by the Texas Department of Licensing and Regulation for the purpose of ensuring compliance with Texas Government Code, Chapter 469. The building or facility owner must request an inspection from the Department, (or a Department authorized provider of inspection services) no later than thirty (30) days after completion of construction. If the completion date provided on the Project Registration Form is no longer correct, notify this office (in writing) of the revised completion date as soon as possible. Page: Page 1 of 1 Copyright 2007