Loading...
HomeMy WebLinkAboutLetter Regarding Financial Guarantee\\ -SU January 31, 2012 Josh Norton, P.E. Assistant City Engineer City of College Station 1101 Texas Avenue College Station, TX 77840 Re: University Heights (FP) —11- 00500086 Dear Mr. Norton: Attached is a Cashier's check for $12,200 payable to the City of College Station. Please accept this as a financial guarantee for the construction completion of the HMAC pavement on Haverford Drive from Station 9 +50 to Station 12 +50. An Engineer's cost estimate is also attached for this work. The estimate provides for removing and replacing the section of pavement which is a greater cost than wedge grinding the edge and overlaying the surface with 1" of HMAC. I anticipated the Contractor will go with the overlay as requested by the City of College Station instead of removing and replacing. If you have any questions, please do not hesitate to call. Very truly yours, Schultz Engineering, LLC. Joe Sch tz, P.E. Civil E neer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com Sch ultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 Item I Description I Unit Estimated Quantity I I Unit Price Total I Street Construction Items 1 Mobilization LS 1,000 $ 1.00 $1,000 2 MILL & REMOVE HMAC - Type D Pavement, complete in place SY 800 $ 4.00 $3,200 3 HMAC - Type D Pavement 2" thick - includes prime coat, complete in place SY 800 $ 10.00 $8,000 Street Construction Items Subtotal $12,200 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 University Heights Subdivision - Phase 1 HAVERFORD DRIVE PAVEMENT REPLACEMENT Station 9 +50 to Station 12 +50 Engineer's Estimate of Construction Completion January 30, 2012 Page 1 of 1 F -12327 SCHULTZ ENGINEERING, LLC,