Loading...
HomeMy WebLinkAboutSTAFF REVIEW COMMENTS i CITY OF COLLEGE STATION CA DEVELOPMENT SERVICES 1 101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 30, 2003 TO: Tim Crowley, Via fax 713.651.1775 I/ FROM: Bridgette George, Assistant Development Manager SUBJECT: CASTLEGATE BUSINESS CENTER (PP) - Preliminary Plat Staff reviewed the above - mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 6, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for October 16, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised preliminary plat; and, One (1) Mylar original of the revised preliminary plat. One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart @ci.college - station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Carol Cotter or myself at 979.764.3570. Attachments: Staff review comments cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759/ Case file #03- 00500231 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: CASTLEGATE BUSINESS CENTER (PP) - 03- 00500231 ENGINEERING 1. Extend waterline to Greens Prairie Road along Lot 2 /Lot 3 boundary. 2. Does the emergency access through Lot 3 for the Castlegate Subdivision require an access easement? What are the plans for that access? 3. Please add to the call for the 30' Proposed Buffer Zone that it was a rezoning condition. Reviewed by: Carol Cotter Date: September 25, 2003 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser pole(s). Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the city). 5. Developer provides digital AutoCAD 2000i version of plat and /or site plan. Email to rbolin(c�cstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date: 9 -24 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 Castlegate Business Center Response to Staff Review Comments No. 1 General: We have removed Lot 3 and included the area with that of Lot 2. Engineering: 1. Lot 3 has been removed. Waterline improvements are shown to Lots 1 & 2. There is no waterline extension shown to Greens Prairie Road. 2. A 50' public access easement has been added for the emergency access road to the Castlegate Subdivision. It is up to the City to determine whether or not this access is removed once SH 40 is complete and Victoria Avenue is connected. 3. Note 10 has been added to address the buffer zone, and the buffer zone call has been revised. TE CON � \ 6 2 ) 0:r" General Contractors Div. of CDS Enterprises, Inc. 1 t J/ 1707 Graham Rd. • College Station, TX 77845 • 979 - 690 -7711 • Fax: 979 - 690 -9797 October 6, 2003 Bridgette George Asst. Development Coordinator City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Castlegate Business Center — Revised Preliminary Plat College Station, Texas Dear Ms. George: Attached are 10 copies of the revised Preliminary Plat and the revised mylar original for the above - mentioned project. Also attached is a summary of our response to the Staff Review Comments dated September 30, 2003. If you have any questions or need additional information, please do not hesitate to give me a call at (979) 764 -7743. Sincerely Yours, Joe Schultz, P.E. Engineering Manager Attachments